Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
08-002.00 Glatting Jackson Kercher Anglin: Sprague Appleway Subarea Plan
08-004.00 Studio Cascade: Joint Planning for Metro UGA
08-005.00 Ruen-Yeager & Associates: Fancher Broadway PCC Intersection Survey
08-006.00 Timberland Landscaping: University Fairview Site Distance Improvements
08-007.00 Glatting Jackson Kercher Anglin: Sprague Appleway Subarea Plan
08-008.00 Michael McCormick, FAICP: Spokane Metro UGA Planning Negotiations
08-010.00 WSTIB: Broadway Moore to Flora Fuel Tax Grant
08-012.00 ORB Architects: Outdoor Pool Renovations
08-014.00 Century West: Capital Projects Const Mgmt & Inspection Svcs
08-015.00 JUB Engineers: Capital Projects Inspection Svcs
08-016.00 CH2M Hill: Capital Projects Const Mgmt & Inspection Svcs
08-017.00 Freedman, Tung & Bottomley: City Center & Library Master Planning
08-018.00 Avista Corporation: GIS Data License Agreement
08-019.00 Poe Asphalt Paving: Street & Stormwater Immediate Winter Repairs
08-020.00 Berk & Associates: Urban Growth Areas Assessment
08-022.00 Lamar Outdoor Advertising
08-024.00 Budinger and Associates: Fancher Broadway PCC Intersection Geotech
08-025.00 Ruen-Yeager & Associates: Fancher Broadway PCC Intersection Survey
08-029.00 David Evans and Associates: School Beacons
08-030.00 Poe Asphalt Paving: Street & Stormwater Maint & Repair
08-031.00 Thomas, Dean & Hoskins: Sprague Bowdish PCC Intersection Survey Svcs
08-032.00 Century West Engineering: Transportation Planning Svcs
08-033.00 GeoEngineers: Sprague Bowdish PCC Intersection Geotech & Design
08-034.00 ICMA: Law Enforcement Operations Assessment
08-035.00 Kilgore Construction: Spokane Valley Pool Upgrades
08-036.00 CH2M Hill: Barker Rd Bridge Replacement
08-037.00 See Interlocal Agreements file - Turtle Creek Joint Planning
08-039.00 Lanzce Douglass, Ponderosa Neighborhood Assoc.
08-040.00 Spokane County: 2008 Sewer Construction Plan
08-041.00 Freedman, Tung & Bottomley: Sprague Appleway Subarea Plan
08-042.00 WSDOT: Broadway Ave Rehabilitation Ph 1
08-043.00 University City: City Hall Property Purchase Agreement
08-047.00 Kilgore Construction: Spokane Valley Pool Upgrades
08-048.00 CDBG Home Investment See Interlocal Agreements File
08-049.00 Avista Corporation: Barker Bridge Replacement Overhead Power Cables
08-050.00 Halme Construction: 24th Ave Reconstruction
08-054.00 Budinger & Associates: 24th Ave Reconstruction Materials Testing
08-056.00 David Evans and Associates: Precinct Shop Drain Installation
08-057.00 Vera Water & Power: 24th Ave Reconstruction Water Main
08-058.00 Rem-Rock Corporation: 24th Ave Reconstruction Sewer Main
08-059.00 Knife River: Appleway Ave Reconstruction
08-060.00 Lowe's and Kohl's Retail Center BSP 01-07
08-061.00 Vera Water & Power: 24th Ave Reconstruction Water Main Replacement
08-063.00 Kilgore Construction: Spokane Valley Pool Upgrades
08-064.00 Poe Asphalt Paving: Street & Stormwater Maint & Repair
08-065.00 Consolidated Irrigation District 19: Barker Bridge Replacement - Waterline
08-066.00 Spokane County Water District 3: Broadway Ave Rehab Ph 1 - Water Main
08-067.00 CH2M Hill: Barker Rd Bridge Replacement
08-068.00 Morgen & Oswood: Barker Bridge Replacement
08-069.00 Spokane County: Barker Bridge Replacement - Sewer Project
08-070.00 See Interlocal Agreements - TPA Amendment
08-072.00 Halme Construction: 24th Ave Reconstruction
08-073.00 CH2M Hill: Appleway Ave Reconstruction
08-074.00 See Interlocal Agreements file - STA Cooperative Funding
08-075.00 Halme Construction: 24th Ave Reconstruction
08-076.00 Bernardo-Wills Architects: City Hall Cenceptual Site Plan
08-077.00 Inland Asphalt: Pines-Mansfield Corridor Congestion Relief
08-078.00 Power City Electric: CenterPlace Auditorium Light Fixture Improvements
08-079.00 Coffman Engineers: Sullivan Bridge over Trent Inspection & Evaluation
08-080.00 Halme Construction: 24th Ave Reconstruction
08-081.00 Avista Gas: Barker Bridge Replacement Natural Gas System
08-082.00 Halme Construction: 24th Ave Reconstruction
08-083.00 See Interlocal Agreements file - Public Defender Relicensing
08-084.00 Spokane County CDBG: Rockwell Street Improvements
08-085.00 See Interlocal Agreements File re Lower Income Housing
08-086.00 See Interlocal Agreements file - Fire Services
08-087.00 Budinger & Associates: Barker Bridge Replacement Geotech Svcs
08-088.00 David Evans & Associates: Traffic Engineering Svcs
08-089.00 Poe Asphalt Paving: Street & Stormwater Maint & Repair
08-090.00 Benthin & Associates: Broadway Ave Moore to Flora Survey Svcs
08-091.00 Avista: Appleway & Greenacres Sprinkler Control System
08-092.00 Knife River: Appleway Ave Reconstruction
08-093.00 Knife River: Appleway Ave Reconstruction
08-094.00 Knife River: Appleway Ave Reconstruction
08-095.00 WSDOT: Appleway Trunkline ITS Ph 2
08-096.00 Knife River: Appleway Ave Reconstruction
08-097.00 Knife River: Appleway Ave Reconstruction
08-098.00 Skillings Connolly: Broadway Ave Moore to Flora Real Estate Svcs
08-099.00 CH2M Hill: Floodplain Management Svcs
08-100.00 Financial Forensics: Law Enforcement Billing Dispute
08-102.00 EcoPlan Design Concepts: Children's Universial Park at Mirabeau
08-103.00 Eller Corporation: Barker Improvements Boone to Spokane River
08-104.00 Berk and Associates: Spokane Metro & UGA Fiscal & Svc Assessment
08-106.00 Halme Construction: 24th Ave Reconstruction
08-107.00 Red Diamond Const: Broadway Rehabilitation Ph 1
08-108.00 Budinger & Associates: Broadway Rehabilitation Material Testing
08-109.00 Acme Concrete Paving: Sprague/Bowdish PCCP Intersection
08-110.00 WSDOT: Urban Ramps & Mainline PCCP Rehab Viaduct to Sprague
08-111.00 WSDOT: Urban Ramps & Mainline PCCP Rehab Viaduct to Sprague
08-114.00 Morgen & Oswood: Barker Bridge Replacement
08-115.00 GeoEngineers: Sprague Bowdish PCCP Intersection Materials Testing
08-116.00 Red Diamond Const: Broadway Rehabilitation Ph 1
08-117.00 USKH: Sprague at Evergreen, McDonald & Pines Intersection Topography
08-118.00 Kilgore Construction: Spokane Valley Pool Upgrades
08-120.00 Avista: Pines Montgomery Traffic Signal
08-121.00 Avista: Pines Mansfield Traffic Signal
08-122.00 David Evans & Associates: Precinct Shop Drain Installation
08-123.00 Inland Asphalt: Pines-Mansfield Corridor Congestion Relief
08-124.00 WSDOT: Appleway ITS Project
08-125.00 Knife River: Appleway Ave Reconstruction
08-126.00 Washington State Department of Transportation
08-127.00 Knife River: Appleway Ave Reconstruction
08-128.00 Morgen & Oswood: Barker Bridge Replacement
08-129.00 Gavin Assoc Landscape Architecture: Mission Park Design Services
08-130.00 Acme Concrete Paving: Sprague/Bowdish PCCP Intersection
08-131.00 Inland Asphalt: Pines-Mansfield Corridor Congestion Relief
08-133.00 Knife River: Appleway Ave Reconstruction
08-134.00 Strata: Broadway Ave Reconstruction Moore to Flora
08-136.00 Inland Asphalt Pines-Mansfield Corridor Congestion Relief
08-137.00 Budinger & Associates: 44th Ave Pathway Geotech & Pavement Design
08-138.00 Larson's Demolition: Old Senior Center Demolition
08-139.00 GEOEngineers: Sprague Concrete Intersections at Evergreen/Pines/McDonald
08-140.00 Poe Asphalt Paving: Street & Stormwater Maint & Repair
08-141.00 David Randall, PE: Stormwater Analysis Design & Construction
08-144.00 Halme Construction: 24th Ave Reconstruction
08-145.00 Halme Construction: 24th Ave Reconstruction
08-146.00 Halme Construction: 24th Ave Reconstruction
08-147.00 Kilgore Construction: Spokane Valley Pool Upgrades
08-148.00 Halme Construction: 24th Ave Reconstruction
08-149.00 WRIAS: Little & Middle Spokane Watersheds
08-150.00 See Interlocal Agreements - Barker Bridge River Impact Mitigation
08-151.00 ICMA: Law Enforcement Services Assessment
08-152.00 Inland Asphalt: Pines-Mansfield Corridor Congestion Relief
08-153.00 Inland Asphalt: Pines-Mansfield Corridor Congestion Relief
08-154.00 David Randall CE: Stormwater Analysis Valleyview & Ponderosa Basins
08-155.00 Inland Asphalt: Pines-Mansfield Corridor Congestion Relief
08-156.00 Inland Asphalt: Pines-Mansfield Corridor Congestion Relief
08-157.00 Inland Asphalt: Pines-Mansfield Corridor Congestion Relief
08-158.00 Knife River: Appleway Ave Reconstruction
08-159.00 See Interlocal Agreements file - Road Maintenance Termination
08-161.00 Taylor Engineering: Sprague Resurfacing University to Evergreen
08-162.00 Kilgore Construction: Spokane Valley Pool Upgrades
08-163.00 Morgan & Oswood: Barker Bridge Replacement
08-164.00 Budinger & Associates: Fancher Broadway Geotech & Analysis
08-165.00 Ruen-Yeager & Associates: Fancher Broadway PCC Intersection Survey
08-168.00 Acme Concrete Paving: Sprague/Bowdish PCCP Intersection
08-169.00 Acme Concrete Paving: Sprague/Bowdish PCCP Intersection
08-170.00 Acme Concrete Paving: Sprague/Bowdish PCCP Intersection
08-171.00 Acme Concrete Paving: Sprague/Bowdish PCCP Intersection
08-172.00 WSDOT: Broadway Ave Rehab Project 2
08-173.00 WSDOT: 44th Ave Pathway
08-174.00 WSDOT Pines Mansfield Corridor Congestion Relief
08-175.00 WSDOT: Barker Road over Spokane River
08-176.00 Spokane County: Green Haven Sewer Ph 1
08-177.00 WSDOT: Broadway Rehabilitation Ph 1
08-178.00 Red Diamond Const: Broadway Rehabilitation Ph 1
08-179.00 Red Diamond Const: Broadway Rehabilitation Ph 1
08-180.00 Red Diamond Const: Broadway Rehabilitation Ph 1
08-181.00 See Interlocal Agreements - Guaranteed Ride Home
08-182.00 WSDOT Appleway Sprague Dishman Mica ITS
08-184.00 Sunshine Disposal: See Franchise Agreements File
08-185.00 Waste Management: See Franchise Agreements File