Loading...
2011, 05-17 Permit Application: 11001235 Post Frame BuildingProject Number: 11001235 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: 36 X 60 X 12 POST FRAME BUILDING Contact: STIMSON CONTRACTING Address: PO BOX 1687 C - S - Z: MEDICAL LAKE, WA 99022 Setbacks: Front Left: Right: Rear: Phone: (509) 244 -2636 Group Name: Site Information: Project Name: Plat Key: 005018 Name: SP- 0711 -91 Date: 5/17/2011 Page 1 of 2 District: East Parcel Number: 45261.3401 Block: Lot: SiteAddress: 2201 S ADAMS RD Owner: Name: RAMBO, JAY & DONNA Address: 2201 S ADAMS RD Location:: CSV SPOKANE VALLEY, WA 99037 Zoning: R -2 SF Res Suburban District Water District: 010 VERA Hold: ❑ Area: .97 Acres Width: 167 Depth: 252 Right Of Way (ft): 60 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: • Review Building Plan Review Released By Originally Released: 5/13/2011 By: tmelbourn Landuse /Zoning/HE Conditions Permits: Released By: Originally Released: 5/17/2011 By: mpalaniuk Operator: jmm Printed By: jmm Print Date: 5/17/2011 Project Number: 11001235 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 5/17/2011 Page 2 of 2 Contractor: STIMSON CONTRACTING Address: PO BOX 1687 MEDICAL LAKE, WA 99022 Description POLE BDLG Grp Type U -1 VB Item Description RESIDENTIAL PERMIT FEE ACCESSORY PLANS REVIEW WSBCC SURCHARGE Notes: Paving waiver was approved. The building can not be used for daily vehicle storage and use. If the conditions change the applicant must notify the city, obtain approval and pave the driveway. See the attached paving waiver under logs. Building Permit Firm: STIMSON CONTRACTING Phone: (509) 244-2636 This Application: Notes Sq Ft Valuation PLAN 2,160 $41,040.00 REVIEW FEE Total Project: Su Ft Valuation 2,160 $41,040.00 Totals: 2,160 $41,040.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: 2,160 $41,040.00 Fee Amount $562.95 $140.74 $4.50 $708.19 Payment Summary: Permit Type Building Permit Fee Amount Invoice Amount $708.19 $708.19 Amount Paid $140.74 Amount Owing $567.45 $708.19 $708.19 $140.74 $567.45 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and /or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 5/17/2011 f Spokane Valley RECEIVED Community Develop , e¢t { t n NTEB ® (Staff Use Only) Permit Cepter ;;;''i r" L-' ' 11703 East? Sprague Ave9 qi SOT BM MIT NUMBER: Spokane Valley, WA 992196\1 Tel: (509) .88- 00361 - MIT FEE: Fax: (509) i364)037, ermitcente ®s.... anev. •� -;! submittal RESIDENTIAL CONSTRUCTION PERMIT APPLICATION ACCESSORY BUILDING ❑ NEW CONSTRUCTION ❑ ADDITION /REMODEL ❑ DECK ❑ OTHER SITE ADDRESS: as dot S. Y'tdlo' % ASSESSORS PARCEL NO.: LEGAL DESCRIPTION: BUILDING OWNER NAME: '3'5 7-641'1t00 NAME: 3.4551t '&mke3O ADDRESS: ..� ( S • AOairY S CITY: 14a - vat ce.. PHONE: STATE: WA ZIP: 0019.44 FAX: CELL: CONTACT NAME: PHONE: FAX: CELL: CONTRACTOR NAME: j YThOr MAILING ADDRESS: ibox 1 L1 iConilec OHVIC) CITY: YYiefAICo'Y4 c_o PHONE: a•aiti• au :but STATE: VvP,- FAX: 3'11,1' c)1 ziP: 619 o a-a CELL: CONTRACTOR LICENSE NO.:,,,ng, IG159MQ EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: * ** *YOU MUST COMPLETE THE FOLLOWING * * ** MARK N/A IF NOT APPLICABLE Height to Peak: Dimensions: No. of Stories: Total Habitable Space: Main Floor SQ FT: Upper Floor SQ FT: Unfinished Basement SQ FT: Finished Basement SQ FT: Garage SQ FT: Jl U Deck /Covered Patio SQ FT: Impervious Surface Area: 30% Slopes on Property: No. of Bedrooms: Construction Type: VAST' Heat Source: Sewer or Septic: TOTAL COST OF PROJECT: $ ? LOOC. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is /will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Effective October 28, 2007 Page 1 of 2 P: \Community Development \02 Administration \03 Forms - Official Versions \Permit Center \Residential Construction Permit App 10.28.07.doc Signature Date: Method of payment: ❑ Cash Bankcard #: ❑ Check ❑ Visa ❑ Mastercard EXP: VIN #: Authorized Signature: Alyk-s(A\ N o og✓t-oy , Effective October 28, 2007 Page 2 of 2 P: \Community Development \02 Administration \03 Forms - Official Versions \Permit Center \Residential Construction Permit App 10.28.07.doc Spokane Valley° For City Use Only PLUS Project Number Project Address 11703 E Sprague Ave Suite B -3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter®spokanevalley.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re- submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre- Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick -up. Information regarding fees and pre - construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE - APPLICANT PINK - BUILDING FILE REV 9/07 LOT ARL-A PLANNING DEPT. APPROVED ff BY' r� � T-/kno DATE. S /7 /0d Ji_l' {i vijoo 9.09 S..q-da. -15 a 5 i RECEIVED CSV PERMIT CENTER MAY 102011 Pro ect # t /— 1 ?) !Marie Thmitti�+. May 13 11 09:43a STIMSONCONTRACTING F 509 - 244 -2554 p2 STIMScW C4NT' • CT //VG Custom Shops, Barns, Garages, etc... www.stimso■co.com Stimson Contracting Inc. P.O. Box 1687 Medical Lake, WA 99022 May 13, 2011 City of Spokane Valley Permit Center 11707 E. Sprague Ave, Suite 106 Spokane Valley, WA 99206 To Whom It May Concern: The proposed 36x72x12 standard post frame building at 2201 S. Adams Spokane Valley, WA 99214 is going to be used for storage only. There is an existing garage attached to the house that is used for parking. If you have any questions, please feel free to contact me. Sincerely, Steve Stimson Stimson Contracting Inc. P.O. Box 1687 Medical Lake, WA 99022 Moiling: PO Box 1697 Medical lake, WA 99022 509- 244 -2636 11515 W. Sunset Hwy Airway Heights, WA 99022 Spokane Valley° For City Use Only PLUS Project Number Project Address 11703 E Sprague Ave Suite B -3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter®spokanevalley.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re- submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre- Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick -up. Information regarding fees and pre - construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE - APPLICANT PINK - BUILDING FILE REV 9/07 t_oT 02,23'6 4. T VALAID0 0 S. Prcia)445 luva.0.- 00,31.213 va- cicy2-11-1 31( RECEIVED CSV PERMIT CENTER MAY 112011 Project # Name__P-- _— Submittal Aerial Map 2201 S Adams 0.0 0 0.01 0.0 Miles This map is a user generated static output from an Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable Legend 13 City of Spokane Valley © BPA Easement Yellowstone Pipeline Address Points Condos and other Vertical Unit o Lease Number O Leased Improvement Value ❑ Leased Land © Leased Land And Building Level 0 Mezzanine Level 1 Mezzanine • Level 2 Mezzanine O Sub Level 3 • Sub Level 2 Sub Level 1 © Ground Floor O Level 1 Level 2 ❑ Level 3 O Level 4 O Level 5 Level 6 Level 7 O Level 8 [r Level 9 C; Level 10 O Level 11 ri Level 12 Level 13 Level 14 • Level 15 71 Level 16 Level 17 Level 18 _} Level 19 Notes Enter Map Description