2010, 08-11 Permit Application: 10002455 Lean-to off Garage - CancelledSj�1t'' *Wane ogge°%.,,
Valley --
PERMIT NUMBER:
PERMIT FEE:
(Staff Use Only)
CITY OF SPOKANE VALLEY CSV ![ =RM't C'EN !EH
Community Development Department , Au 14010 �
Permit Center
11703 East Sprague Avenue, Suit9 .4 _ —
Spokane Valley, WA 99206 ,
Tel: (509) 688 -0036 I Name____
Fax: (509) 688 -0037 ' SLIbmitta! # ____
permitcenter@ spokanevalley.org
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
❑ NEW CONSTRUCTION
❑ DECK
SITE ADDRESS: ` 612 S
El ADDITION /REMODEL ❑ ACCESSORY BUILDING
OTHER
at t OA/6- S.P0_\cfal € va6t.9 crt. I a_
ASSESSORS PARCEL NO.:
LEGAL DESCRIPTION:
BUILDING OWNER NAME:
NAME:
C ec ■ t iLct,)
ADDRESS: / "t 2g" (.: &I k 1
fvotaxvit
5061- 2crG)- log
CONTACT NAME: K041 \C ,
PHONE: r 2 SQ.%
CITY:
PHONE:
STATE: L G.
ZIP: ciCk j-
FAX: CELL:
FAX: CELL:
CONTRACTOR NAME: T12 n 17)(76/10\
i�C � C ►Y 1' G,,C k4 i
MAILING ADDRESS:
CITY:
PHONE:
STATE: ZIP:
FAX: CELL:
CONTRACTOR LICENSE No.:
EXPIRES: CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE:
:1.1 06 1 G- \ -Ei;l \ *11 C ' V' J' C rOtSk. i `X 3U -T:`. i? X Soo , 000
PROPOSED USE:
Effective October 28, 2007
C:\ Users \JR \AppData \Local \Microsoft \Windows \Temporary Internet
Files \Content.IE5 \C5HJMHBO\ Residential% 20Construction %20Permit %20App.1 [1].doc
Page 1 of 2
* ** *YOU MUST COMPLETE THE FOLLOWING * * **
MARK N/A IF NOT APPLICABLE
Height to Peak:
Dimensions:
No. of Stories:
Total Habitable
Space:
Main Floor SQ
FT:
Upper Floor SQ
FT:
Unfinished Basement
SQ FT:
Finished Basement
SQ FT:
Garage SQ FT:
Deck /Covered Patio
SQ FT:
Impervious Surface
Area:
30% Slopes on
Property:
No. of
Bedrooms:
Construction
Type:
Heat Source:
Sewer or
Septic:
TOTAL COST OF PROJECT: $
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is /will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Signatur s
Date: ?_ 1 t 10
Method of payment: ❑ Cash
Bankcard #: (I 10'
❑ Check
®.Visa ❑ Mastercard
EXP: VIN #:
Authorized Signature:
Effective October 28, 2007
C:\ Users \JR \AppData \Local \Microsoft\Windows \Temporary Internet
Files \Content.IE5 \C5HJMHBO\ Residential% 20Construction %20Permit %20App.1 [ 1].doc
Page 2 of 2
O V)
9 S v
9 Ti`
s6
Yla
_o 3
Er
3 v
0
— 1901
,.c
r _ # lelvwgr
eu
`!1 ;z',
GICZ (J�
3
»n
I
Jqh
'—'r
t
1
X
N
0,
a
N
w -o
'►' c s
D E S
E o 7
C U
-t (D
X X �a
of
X LL
m
L...
X m Q
C
N m
(n C,.9
E Q) , V')
co N o) aP
a) N C c
co
N cU
o
LL Q
1
ssrul Jo Ja14PJ wee le sJaualsej
41M loot buiisixa of paJnoas gxZ'luo0
paJlnbeJ sumop ag Jo%
JeleaJ6 Jo ZI.xZ uo 6unpoiq xZ p!IoS
sllal 6ugoo. 6ugsixa Japun .g1. Jo wnwlww a luawdepapun de
7 6uueeq 6ui;sixa
01 Jall J a
IIeM
6unsix9
sJa)leJ
6unSIX
14ft maximum
aJ
N
7 =
o co
3
18" minimum width
Ja6pal xi—sr-iiipiocrAtng aq
peM to do; le Jaauan )puq anotuaa :aloN
spnls Jo aleld dol ale.gauad of slloq Gel aleao-1
'0'0.91 s31oq 6e1 LIM IIem 01 Ja6pal aJnoag
Ja6pal xZ luo0
apse' 6ugslxa anowali
Hem 6wlslx3
loot 6ugslxa oluo
,g Jo wnwiuiw a l00J Mau
W014luaw,epapun pualx3
si26uey JaueJ Jo lslof lelaw pazluenle0
sassrui JO sJa1JeJ low 6ugslxa
SM@J7S 6eI .Cq Joyoue
Ja6pel xz snonunuoo
peM
nunsix3
peipbei 6upeJ8
ri >
-o
5 o
ca <
0
o_
3
CD
SIijk/``
j
Site Address: 7925 E ALKI AVE
Parcel Number: 45183.0273
Zoning: R -3
Fire District: FD 01
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
New project El
Previous pre -app meeting
Plan revisions ❑
Transmittal Date:
Wednesday, August 11, 2010
Water District
Applicant: ROBY, CECIL J
7925 E ALKI AVE
SPOKANE VALLEY, WA 992
(509) 280 -3748
e -mail:
Contact: ROBY, CECIL J
7925 E ALKI AVE
SPOKANE VALLEY,
(509) 280 -3748
e -mail:
Contractor: OWNER
( ) -
Project BLDG A LEA
Description:
Project Number: 10002455
TCHINSON
Owner: ROBY, CECIL J
7925 E ALKI AVE
SPOKANE VALLEY, WA 99212
e -mail:
Occupant:
e -mail:
Arch / Engineer:
FF GARAGE 10 X 30
e -mail:
Building
Landuse
Engineer
Utilities
Health
Fire Dist
Assessor
APPLICATIO
CONSTRUCTION PLAN
SITE PLA
TD
Please send all plan review and project comments via e-mail to the
highlighted individuals.
Spokane
jUalley
For City Use Only
PLUS Project Number /
Project Address —2 9,;2
11703 E Sprague Ave Suite B -3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
st it i
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re- submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre - Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick -up. Information regarding fees and pre- construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE — APPLICANT PINK — BUILDING FILE REV 9/07