2011, 01-21 Permit: 11000095 Relocate Home W/Basements�s
PERMIT CENTER
11703 E. Sprague Avenue, Suite B -3
Spokane Valley, WA 99206
Site Information
Project Information
Site Address: 8205 E ALKI AVE
Parcel Number: 45183.0138
Subdivision:
Block: Lot:
Zoning: R -3 SF Res District
Owner: WOOD, SAM
Address: 9116 E SPRAGUE, UNIT 150
SPOKANE VALLEY WA 99206
Building Inspector: NORTH
Water Dist: HUTCHINSON
Project Number: 11000095 Inv: 1 Issue Date: 01/21/2011
Permit Use: RELOCATE HOME W /BASEMENT
Applicant: WOOD, SAM
9116E SPRAGUE, UNIT 150
SPOKANE VALLEY WA 99206 Phone: (509) 534 -1530
Contact: WOOD, SAM
9116 E SPRAGUE, UNIT 150
SPOKANE VALLEY WA 99206 Phone: (509) 534 -1530
Setbacks - Front: Left: Right: Rear:
Group Name:
Project Name: LOT 2
1 Permits
Approach Contractor: FIVE STAR CONCRETE INC
License #: FIVESSC943OQ
APPROACH -CONST IN ROW 1 $52.00
Total Permit Fee:
FOR RIGHT OF WAY INSPECTIONS CALL (509) 869 -5373 ENGINEERING
$52.00
Building Permit Contractor: OWNER
License #: OWNER
UNFINISHED
BASEMENT
FOUNDATION
Total Value:
FOR BUILDING INSPECTIONS CALL (509) 688 -0054.
R -3 VB
R -3 VB
$25,740.00
916 RESIDENTIAL PERMIT FEE $401.35
WSBCC SURCHARGE $4.50
0 SF PLNS RVW < 7999 SQ FT $160.54
Total Permit Fee: $566.39
Mechanical Permit Contractor: OWNER
License #: OWNER
GAS APPLIANCE <= 100,000BT
FOR MECHANICAL INSPECTIONS CALL (509) 688 -0054.
1 $13.00 GAS PIPING
Total Permit Fee:
1 $1.00
$14.00
Plumbing Permit Contractor: OWNER
License #: OWNER
TOILETS /BIDETS
TUBS
FLOOR DRAINS
FOR PLUMBING INSPECTIONS CALL (509) 688 -0054.
$6.00 SINKS
$6.00 WATER HEATER - ELECTRIC
$6.00 WATER PIPING - DWV
Total Permit Fee:
2
1
$12.00
$6.00
$6.00
$42.00
Processed By: Main, Jodi L
Printed By: MORRIS, HEATHER Page 1 of 2
PERMIT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's /permittee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee- neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the owner's / permittee's expense.
FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING — after rough -in, before covering, and final.
MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final.
FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL — when complete and prior to occupancy and /or use. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access,
on -site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover.
RIGHT -OF- WAY /APPROACH — prior to placement of concrete /asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must
be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day /24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688 -0054
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688 -0195 or State Dept of Transportation
324 -6000
Permits and inspections for electrical wiring, State Department of Labor Permits and inspections for Sewer Connection. Spokane County Utilities Division
And Industries 324 -2640 477 -3604
Permits and inspections for on -site septic systems, Spokane Regional Fire sprinkler and alarm systems and private access road inspections, Spokane Valley
Health District 324-1560 Fire Department 892 -4122
State law RCW 19.122 requires that prior to any excavation the "CALL BEFORE YOU DIG' center must be notified. Call before you dig at least 2 working days in advance. 456-8000.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is
finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrawn or cancelled prior to the plan review being completed.
Owner / Agent Date
Staff Approval Date
PERMIT CENTER
11703 E. Sprague Avenue, Suite B -3
Spokane Valley, WA 99206
Site Information
Project Information
Site Address: 8205 E ALKI AVE
SPOKANE VALLEY, WA 99206
Parcel Number: 45183.0138
Project Number: 11000095 Inv: 1 Issue Date: 01/21/2011
Permit Use: RELOCATE HOME W /BASEMENT
Permits
Payment Summary
Total Fees AmountPaid AmountOwing
$674.39 $674.39 $0.00
Tran Date Receipt # Payment Amt
01/19/2011 25601 $160.54
01/21/2011 25613 $513.85
Processed By: Main, Jodi L
Printed By: MORRIS, HEATHER Page 2 of 2
PERMIT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's /permittee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee- neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the owner's /permittee's expense.
FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING — after rough -in, before covering, and final.
MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final.
FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL — when complete and prior to occupancy and /or use. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access,
on -site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy:
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover.
RIGHT -OF- WAY /APPROACH — prior to placement of concrete /asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must
be inspected prior to cover. Check with the Building department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day /24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688 -0054
Permits and inspections for electrical wiring, State Department of Labor
And Industries 324 -2640
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688 -0195 or State Dept of Transportation
324 -6000
Permits and inspections for Sewer Connection, Spokane County Utilities Division
477 -3604
Permits and inspections for on -site septic systems, Spokane Regional Fire sprinkler and alarm systems and private access road inspections, Spokane Valley
Health District 324 -1560 Fire Department 892 -4122
State law RCW 19.122 requires that prior to any excavation the "CALL BEFORE YOU DIG" center must be notified. Call before you dig at least 2 working days in advance, 456 -8000.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is
finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrawn or cancelled prior to the plan review being completed.
Owner / Agent
Date
Staff Approval Date
Project Number: 1)000095 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 1/21/2011 Page 2 of 3
Approach
Contractor: FIVE STAR CONCRETE INC Firm: FIVE STAR CONCRETE INC
Address: 6225 N MALVERN RD Phone: (509) 226 -1189
OTIS ORCHARDS WA 99027
Item Description Units Unit Desc Fee Amount
APPROACH -CONST IN ROW 1 NUMBER OF $52.00
Permit Total Fees:
Building Permit
$52.00
Contractor: OWNER Firm: OWNER
Phone: (000) 000-0000
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
BASEMENT U R -3 VB UNFINISHE 916 $13,740.00 916 $13,740.00
D
BASEMENT
FOUNDATION R -3 VB FOUNDATI 0 $12,000.00 0 $12,000.00
ON
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 916 $25,740.00 916 $25,740.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Permit Total Fees:
Mechanical Permit
Fee Amount
$401.35
$4.50
$160.54
$566.39
Contractor: OWNER Firm: OWNER
Phone: (000) 000-0000
Item Description
GAS APPLIANCE <= 100,000BTU
GAS PIPING
Units Unit Desc
1 NUMBER OF
1 # OF UNITS
Operator: jmm Printed By: jmm
Fee Amount
$13.00
$1.00
Permit Total Fees: $14.00
Print Date: 1/21/2011
Project Number: 1)000095
Inv: I
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 1/21/2011
Contractor: OWNER
Item Description
TOILETS/BIDETS
SINKS
TUBS
WATER HEATER - ELECTRIC
FLOOR DRAINS
WATER PIPING - DWV
Payment Summary:
Permit Type
Approach
Building Permit
Mechanical Permit
Plumbing Permit
Units
1
2
1
1
1
1
Fee Amount
$52.00
$566.39
$14.00
$42.00
Plumbing Permit
Page 3 of 3
Firm: OWNER
Phone: (000)
Unit Desc
NUMBER OF
NUMBER OF
NUMBER OF
NUMBER OF
NUMBER OF
NUMBER OF
Permit Total Fees:
Invoice Amount
$52.00
$566.39
$14.00
$42.00
$674.39 $674.39
000 -0000
Fee Amount
$6.00
$12.00
$6.00
$6.00
$6.00
$6.00
Amount Paid
$0.00
$160.54
$0.00
$0.00
$42.00
Amount Owing
$52.00
$405.85
$14.00
$42.00
$160.54
$513.85
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jam Printed By: jmm Print Date: 1/21/2011
Spokane
For City Use Only
PLUS Project Number /1--0(//7-
Project Address c 2
11703 E Sprague Ave Suite B -3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 • permitcenter @spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re- submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre - Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick -up. Information regarding fees and pre - construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE — APPLICANT PINK — BUILDING FILE
REV 9/07
'C)
p
AMP
Q 7.11
\ CD
(
€t Zde-
Lu r
G•QL:7-c-, .c-
Nde6t1_,L,
3
,
k )
iL
k7e.:13, pEg,1-,e_
Z2, .
c.4,45
F ov-c t
91L
CS",/ FEB! GENIEA
Pict
Name --
a nlittai
2viA
0
24
•
N1116AG 001 . ORO ED
5
4.101. •••7 s.)vi