Loading...
2009, 09-29 Permit Application: 09002942 Window OpeningsSpokane ja Permit Center 11703 E Sprague Ave, Suite B -3 Spokane Valley, WA 99206 50 :(509)688 -0037 Community Develo." IT G i4TE Residntir gnstru ion Permi Appli�`- �A 9 Project # SITE ADD itt PERMIT NUMBER: PERMIT FEE: New Construction Addition/Remodel Other: Accessory Bldg Deck Sig t.) Kct Yet 11 992 / Z ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: DIMENSIONS: Name: A4 1 .) C ©x TOTAL HABITABLE �P�ACE: Address: s 20 7 E /9 j K 2" FLOOR SQ. FTG: 4 & City: Spo Ka e A f) j, State: , 1 A W Zip: ? l,2 i..2 Phone: S09 9 i - ti Fax: GARAGE SQ. FTG: /1 4 Contact Person Name: IOc ., 73a� c-//zo "- Phone: Se 9— 39/2 —0 2 % Describe the scope of work in detail: Contractor: DIMENSIONS: Name: _5` ...L- C et ref, a c � TOTAL HABITABLE �P�ACE: Address: pr, 44 a, %S /y E. mo, o,w�tf 2" FLOOR SQ. FTG: 4 & City: 5/01,, ,N. V l,r� State: w 4i Zip: (, Phone: / Fax: . so99�2-?aso .so9 -�a - 6030 GARAGE SQ. FTG: /1 4 Contractor Lic No: T y Ex Date: OA/0 ilac)/ D Du RRS:� 9NVCR 30% SLOPES ON �� PROPERTY: City Business Lic. No: 6 © 2 l S as-94 CONSTRUCTION TYPE: apr►1 ; r.1_ e-�. a2 Cost of Project: $ ;21 3 3 o t- I / e: -e. 2 OQP i �� ✓fig N �L� r� (� LAS - / CU r %1L° Ltd Dye. �} Ot � n� 1 fin Q rJ° N� Proposed Use: 1ws k ( a n t° c� y v� /y �,v ►•�� a * * * * * * * * * * * ** *The following MUST be complete: (write N/A if not applicable ) * * * * * * * * * * * * * * * * * * * * ** HEIGHT TO PEEP,I1: DIMENSIONS: # OF STORIES: TOTAL HABITABLE �P�ACE: MAIN FLOOR TO SQ. FTG: 7(a. © 2" FLOOR SQ. FTG: 4 & UNFIN BASEMENT SQ. FTG: 96 © - • IMPERVIOUS SURFACE AREA: i✓1 q FINISHED BASEMENT SQ. FTG: -3 GARAGE SQ. FTG: /1 4 DECK/COV. PATIO SQ. FTG: yl el 30% SLOPES ON �� PROPERTY: # OF BEDROOMS: 3 ge,l enc 4 CONSTRUCTION TYPE: apr►1 ; r.1_ e-�. a2 HEAT OURCE: to /2 f i c_ SEWER OR SEPTIC? n ct The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is /will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be — sed.` SIGNATURE: Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 ❑ Check DATE: ❑ Mastercard ❑ VISA Expires: VIN #: RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. ❑ SITE PLAN ❑ Property lines and dimensions ❑ Direction arrow pointing North and orientation to streets ❑ Proposed /existing buildings (footprint and dimensions) ❑ Utilities, septic tank/drain field locations and distances ❑ Setbacks to property lines ❑ Distance between buildings ❑ Right of way /easement location & sizes ❑ Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear /Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): ❑ Footing sizes and locations ❑ Perimeter concrete foundation wall sizes ❑ Crawlspace ventilation ❑ Supporting wood cripple walls or beams ❑ Thickened concrete pads supporting beams or girder trusses ❑ Floor Plan of each level (finished or unfinished) with dimensions: ❑ Floor Joist direction, size and spacing ❑ Header, beam or concrete lintel sizes ❑ Brace wall panel locations ❑ Water heater and furnace locations ❑ Exhaust fan locations ❑ Deck or concrete patio sizes and locations ❑ Roof Plan: ❑ Engineered truss direction and spacing ❑ Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof ❑ Slope/ roofing material/ underlayment/ ice dam protection ❑ Sheathing size and type Ceiling ❑ Joist size and spacing Wall ❑ Height/ top plate/ stud size and spacing/ sole plate ❑ Exterior sheathing size and type Floor ❑ Joist size and spacing Foundation Wall ❑ Concrete or Masonry unit width ❑ Earth to wood separation distance Footing ❑ Size Radon ❑ Passive system with 6mi1 vapor barrier Miscellaneous Construction Details ❑ Deck: ❑ Floor plan/ side view/ dimensions ❑ Floor Joist/ decking direction, size and spacing ❑ Stairway tread rise & run and nosing ❑ Window and door location and sizes ❑ Window well locations if applicable ❑ Room usage labels ❑ Smoke detector locations ❑ Attic and crawl space access locations ❑ Fire Wall construction ❑ Ridge, eave and valley lines ❑ Beam and girder size and location ❑ Truss or rafter size, spacing & connection ❑ Attic insulation/ air space baffle/ ventilation ❑ Size of ceiling gypsum wall board ❑ Siding/ exterior house wrap/ anchor bolts ❑ Insulation, vapor barrier, gypsum wall board ❑ Sheathing or concrete floor size/ insulation ❑ Footing bottom to finished ground level depth ❑ Horizontal & vertical reinforcement if any ❑ Reinforcement if any ❑ Active system with 6 mil vapor barrier ❑ Footings/ post/ and beam size and locations ❑ Handrail / Guard height & spacing Project Number: 09002942 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 9/17/2009 Page 1 of 2 Project Information: Permit Use: MAKE 2 NEW WINDOW OPENINGS Setbacks: Front Site Information: Plat Key: Left: Right: Rear: Name: Range Contact: DURA -SIDE Address: 9514 E MONTGOMERY DR #27 C - S - Z: SPOKANE VALLEY WA 99206 Phone: (509) 922 -9250 Group Name: Project Name: iliffigMIAMOSAOWNERMVE District: Nort Parcel Number: 45183.0538 Block: SiteAddress: 8208 E ALKI AVE Location:: CSV Zoning: R -3 SF Res District Water District: 005 HUTCHINSON Area: 18,658 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Lot: Owner: Name: COX, MATTHEW A & TABATHA Address: 8208 E ALKI SPOKANE VALLEY, WA 99212 Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Permits: Released By: Originally Released: 9/17/2009 By: tmelbourn Contractor: DURA -SIDE Address: 9514 E MONTGOMERY DR #27 Phone: (509) 922 -9250 SPOKANE VALLEY WA 99206 Building Permit Firm: DURA -SIDE This Application: Total Project: Description Grp I'm Notes Sq Ft Valuation Sq Ft Valuation 1 &2 FAMILY R -3 VB PLAN 0 $2,133.00 0 $2,133.00 REVIEW FEE Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Totals: 0 $2,133.00 0 $2,133.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Fee Amount $83.25 $4.50 $33.30 Permit Total Fees: $121.05 Operator: jmm Printed By: JD Print Date: 9/17/2009 Project Number: 09002942 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 9/17/2009 Page 2 of 2 Notes ar r -, ,. P° a* X°t a,., a.tasigfis t x. _ ..F._ Payment Summary: Permit Type Building Permit WNW NINIMAIMSMME:mmeMEMAMMOVOMM-51MAIM Fee Amount Invoice Amount Amount Paid Amount Owing $33.30 $87.75 $121.05 $121.05 $121.05 $121.05 $33.30 $87.75 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 9/17/2009 Spokane jUalley For City Use Qrrilyr. PLUS Project Number .7 - )%'y9" Project Address _ 74,_ 11703 E Sprague Ave Suite B -3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter®spokanevalley.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a rev, sed target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review D Submit complete, accurate plans and documents. Extra time may be required for re- submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. D Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre - Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick -up. Information regarding fees and pre - construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE — APPLICANT PINK — BUILDING FILE REV 9/07