Loading...
2013, 06-26 Permit: SW-13001084 Sewer ConnectSPOKANE COUNTY UTILITIES PERMIT Application Number: SW- 13001084 Permit Issued Date: 06/26/2013 Expiration Date: 06/26/2014 Project Description: Project Name: Primary Contact: Phone: SEWER CONNECTION HARRINGTON OVERLAND EXCAVATION INC 509 - 939 -7984 Applicant: OVERLAND EXCAVATION INC Address: Phone: Email: 5918 E TRENT AVE SPOKANE, WA 99212 509 - 939 -7984 SITE INFORMATION: Site Address: Parcel Number: Assessor's Description: Inspection Area: Zoning: 8711 E ALKI AVE 45184.0239 HUTHCINSON'S ADD: Lot 7 Block 18 EXCEPT the 59.82 feet thereof; EXCEPT the North 125 feet thereof; TOGETHER WITH the East 32 feet of the South Half of Lot 6 of Block 18 : (509)- 477 -3675 Owner: Address: Phone: Email: SHAW, JERRY LEE 8711 E ALKI SPOKANE, WA 99212 Water District: Hutchinson Irrigation District Fire District: Spokane Valley Fire #16 Land Area: 17037 Square Feet CONTRACTOR INFORMATION: OVERLEI951LE, Exp. 06/28/2014 OVERLAND EXCAVATION INC 5918 E TRENT AVE SPOKANE, WA 99212 509 - 939 -7984 DETAILS: Class SEWER FEE DETAIL: Processing - Utilities Utilities Permit Type Quantity Unit Charge Value SEWER CONNECTION Total Fee: $26.32 $125.00 $151.32 1 $125.00 $125.00 $125.00 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1- 800 - 424 -5555 BEFORE YOU DIG - -AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477 -3604 FROM 8:30 -5:00 MONDAY - FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30- MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 06/26/2013 09:39:27 Project Coordinator: Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW- 13001084 Permit Issued Date: 06/26/2013 Expiration Date: 06/26/2014 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 06/26/2013 09:39:27 Project Coordinator: Kathy Cummings