HomeMy WebLinkAbout2013, 04-30 Permit Application: BLD-2013-0768 Pole Bldgi
$ffliane
Alt . j3W -13 -7
11707ES er4P,
Spokane V- r ey, WA 9928 E C E 1 V E D
(509)688-0036 FAX: (509)688 -0037
www. spokanevallev. org
Community Development
Residential Construction
Permit -Appl e tion
APR 3 0 2013
c S V P E Tew Construction
SUB # . Addition/Remodel
I-- .❑Oilier
PERMIT NUMBER:
PERMIT FEE:
L1 Accessory Bldg
n Deck
SITE ADDRESS: 'f7 " E, /41/< r V((
ASSESSORS PARCEL NO: j/52114 0.3c21 LEGAL DES
Building Owner: JTct
Name: sty. c a,,./?
Address:
,City
Phone: 52d 719 V)._
State• 4
Fax:
Contact Person
Name: G4LE liugJo Err
Phone: CO? 535 90/6 ExT 2y
Describe the scope of work in detail:
(�--
TION:
Contractor:
Name: TWA/ CoUdlrRf 81114,0,6* .gS .r c.
5978 E sr 7*E0/r 4/QE
fAlt t/ 'f state Zip:X93,
1 on 9-3.3 Fa. 9 9 Sal 2830 •
-Contractor - icNo:%wir;iBliz3C ExpDate: 0,13„,,te
Crty Bu sines Luc. No: _661 D57 4 9
Cost of Project (fil 7 D
,/
Proposed Use .f�lll 14 Gt.. Z x 3o x 20 5 % ,eft 1911/141/14.
* * * * * * * * * * * ** - ` * * * * * * * * * ** * * ** * * * * **
The. following MUST be complete: (write :not apeable)
DIMENSIONS: # OF .STORIES:
2_
5x 3Oxao
2 FLOOR SQ. FTG:
UNFIN- BASEMENT SQ. FTC:
FINISHED BAS MNT
SQ. FTG: //
# OF BEDRROWS:
GARAGE Q FTG:
w-4-
CONSTRUCTION TYPE:
Po ST FRME
The -- rmitee verifies, acknowledges- and agrees by Mei? si a-iure that ff tfiis rmit FS for construction of or on a dwelling, the
Pe 9 9 Y 9n 1) pe
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. - 3) The
signatory is the property owner or has permission to represent the property owner in this transadion. 4) AN construction is to be done
Tn h ill compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center 5) This City of Spokane°Valley Permit is not a permit or approval -for- anyviolatfon of federal, state or
local laws, codes or ord noes. 6) Plans or additional information may be required to be submitted, and subsequerifiy approved before
4//4-
DEC COV ATlO S FTG:
'Yzs P �
HEAT SOU
TOTAL HABITABLE SPACE:
- IMP€R3/IOLIS SURFACE
AREA:
30% SLOPES ON r1
PROPERTY: /%t--
SEWE,E2 OR SEPTIC?
this ppli on can_be . •ce.ssed_
SIGNATUR
Method of Paym = of
❑ Cash
Sankcard #:
Authorized ,Signature:
REVISED 2%15/07
Check
DATE: «i 369-7'
❑ Mastercard ❑ VISA
Expires: VIN#:
if/k
a G � cgs/ 2.
gee/ ` snl e D,?-35
Project # 131e4-13-76g
RECEIVED
APR 3 0 2013
CSV PERMIT CENTER
REV. #
SUB #
•
foo
ge211 C, elk,
PART IV — DECISION
STAFF HAS REVIEWED THE PROPOSED PAVING WAIVER ON BEHALF OF THE COMMUNITY DEVELOPMENT
DIRECTOR AND FIND THE REQUEST IS GRANTED AT O 7/7 F:
SAID ADDRESS FOR PERMIT #:
is
Ia ing Division Staff Signature Date
L IUlY t&It���e
.Va.11ey-
PAVING WAIVER'
Community Development — Planning Division
11703 E Sprague Ave Suite B -3 ♦ Spokane Valley WA 99206
509.720.5026 • Fax: 509:68&0037 ♦ plammn0 @spo-kaneva-llev:ors?
Spokane Valley Municipal Code (SVMC) Section 19.40.020.S; All residential driveway and off - street parking areas shall be pavedwith
asphalt, Portland cement, grasscrete, paver blocks or other equivalent hard surface material ". A paving waiver can only be granted if
the structure you are proposing is not going to require a driveway for daily use.
OWNER NAME:
ADDRESS:
CITY: �!
PART 1— OWNER INFORMATION
PARCEL #: 4/5/ ( 0; 3c
STATE: 0
PHONE: CJ5'9$202-j 72
Fax:
CELL:
zip: 5 . /
EMAIL:
PART II — DETAILS OF PAVING WAIVER
1. Do you have an existing garage for parking daily use vehicles? [AYES ❑ NO
2. Is the proposed detached structure used for storage only? (:YES ❑ NO
3. Do you plan on using the detached structure to park vehicles? Rj YES ❑ NO If yes, then
what type of vehicles? PV
4. Do you plan to conduct a business from proposed detached structure? ❑ YES NO If so, what
is the nature of your business?
PART III — AUTHORIZATION
(,(PRINT NAME) 3t i t S owner, hereby confirm that the information provided on this
form is true and correct. acknowledge that any change in the foregoing conditions, could require
the City to impose paving requirements. I further agree to report any change in these conditions to
the Spokane Valley Community D velopment Department, Planning Division, within 30 days.
2 Zo
i/,'�/ /..
Owner Signature
Date
Crated- 6/27/11
Page 1 of 1