2008, 12-11 Permit Application: 08004778 Residential AdditionSpokane
_ Valley
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B -3
Spokane Valley, WA 99206
(509)688 -0036 FAX: (509)688 -0037
www.spokanevalley.org
SITE ADDRESS:
/J Alms
PERMIT NUMBER:
PERMIT FEE:
New Construction Accessory Bldg
Addition/Remodel Deck
Other: Sec �; -� / %n la?"-`1- `)
/eel Spa, nT D/h / /ey) Lei, 4
ASSESSORS PARCEL NO: "/5 �' a , D 9tjs' LEGAL DESCRIPTION: A4...;1444,+_/_&,(
Building Owner:
Name:
/064A iD `s A;keti
Name: X Q &GI'2't "Y i "f2..
City: de, /d..� z_1" State: A Zip:q 90US'
Address: /2'7ii ty.) 19d ...5 iect
Contractor Lic No: Exp Date:
City: 5pcAnne ( %/ /e/ State:�21
Zip:f9 f4
PhoneC5o c, 114_ a .7 5C1 Fax:
GARAGE SQ. FTG:
A/ II
Contact Person
Name: /C-JY, /9;,k,..„. • ed
Phone (,S' y) 6 8 Y -- 96 52, -
Contractor: /.�{/ j./.... : ! / til Ca l4 At; iia /... f.. M ea L1 i%l
Name:
/064A iD `s A;keti
Address:
City: de, /d..� z_1" State: A Zip:q 90US'
Phonei5b 7) 4 k _ 9c „ 160, Fax ) 4,3j �t ,_ Cs�O % z
Contractor Lic No: Exp Date:
City Business Lic. No: ,,_ c / _ 9 9 3 _ 7/6
Describe the scope of work in detail: Cost of Project: $ � `1J C 4 e1,
0 �.v�n � ✓) l- / % it, 74t ..�..v s.1 / rlr, zJ or 2 ! A O`... ! CAA Ater» -1-L. a
Proposed Use:
* * * * * * * * * * * ** *The following MUST be complete: (write N/A if not applicable ) * * * * * * * * * * * * * * * * * * * * **
HEIGHT TO PEAK:
/6'
DIMENSIONS:AOO 1 %oh
aa'. 2
# OF STORIES:
i
TOTAL HABITABLE SPACE:
72a4/ `/9i 5y. �'7,
MAIN FLOOR TO S ,,,�
FTG: `di--riSF
2Nu FLOOR SQ. FTG:
�<i
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
AREA:
FINISHED B`ASEMENT
SQ. FTG: 4/ A
GARAGE SQ. FTG:
A/ II
DECK/COV. PATIO SQ. FTG:
A/ A
30% SLOPES ON
PROPERTY: N4
# OF BEDROOMS: "Ibs,c.D,
.a
CONSTRUCTION TYPE:
Ida e cl A riUf e -7 u 5 S
HEAT SOURCE:
f/ e_4 -t' A u in Jo
SEWER OR SEPTIC? Be-ti
7.; 2.2 (o h Uo 2-1"4tel . .A.M
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is /will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE:
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
4-7--CLO at-P—kt
Check
❑ Mastercard
Expires:
DATE:
❑ VISA
VIN #:
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
❑ SITE PLAN
❑ Property lines and dimensions
❑ Direction arrow pointing North and orientation to streets
❑ Proposed /existing buildings (footprint and dimensions)
❑ Utilities, septic tank/drain field locations and distances
❑ Setbacks to property lines
❑ Distance between buildings
❑ Right of way /easement location & sizes
❑ Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
❑ Elevations (Front/Rear /Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
❑ Footing sizes and locations
❑ Perimeter concrete foundation wall sizes
❑ Craw!space ventilation
❑ Supporting wood cripple walls or beams
❑ Thickened concrete pads supporting
beams or girder trusses
❑ Floor Plan of each level (finished or unfinished) with dimensions:
❑ Floor Joist direction, size and spacing ❑ Window and door location and sizes
❑ Header, beam or concrete lintel sizes ❑ Window well locations if applicable
❑ Brace wall panel locations
❑ Water heater and furnace locations
❑ Exhaust fan locations
❑ Deck or concrete patio sizes and locations
❑ Roof Plan:
❑ Engineered truss direction and spacing
❑ Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
❑ Slope/ roofing material/ underlayment/ ice dam protection
❑ Sheathing size and type
Ceiling
❑ Joist size and spacing
Wall
❑ Height/ top plate/ stud size and spacing/ sole plate
❑ Exterior sheathing size and type
Floor
❑ Joist size and spacing
Foundation Wall
❑ Concrete or Masonry unit width
❑ Earth to wood separation distance
Footing
❑ Size
Radon
❑ Passive system with 6mil vapor barrier
Miscellaneous Construction Details
❑ Deck:
❑ Floor plan/ side view/ dimensions
❑ Floor Joist/ decking direction, size and spacing
❑ Stairway tread rise & run and nosing
❑ Room usage labels
❑ Smoke detector locations
❑ Attic and crawl space access locations
❑ Fire Wall construction
❑ Ridge, eave and valley lines
❑ Beam and girder size and location
❑ Truss or rafter size, spacing & connection
❑ Attic insulation/ air space baffle/ ventilation
❑ Size of ceiling gypsum wall board
❑ Siding/ exterior house wrap/ anchor bolts
❑ Insulation, vapor barrier, gypsum wall board
❑ Sheathing or concrete floor size/ insulation
❑ Footing bottom to finished ground level depth
❑ Horizontal & vertical reinforcement if any
❑ Reinforcement if any
❑ Active system with 6 mil vapor barrier
❑ Footings/ post/ and beam size and locations
❑ Handrail / Guard height & spacing
Project Number: 08004778 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: RES ADDITION Contact: AIKEN GENERAL CONTRACTING
Address: PO BOX 425
C - S - Z: COLBERT, WA 9905
Setbacks: Front Left: Right: Rear: Phone: (509) 688-9682
Group Name:
Project Name:
Site Information:
Date: 12/15/2008 Page 1 of 2
rOMMERFANNEMEMENBETZMERM6EarCiii.t.MW:::iii.::*,:iiiiiM5:::::,6:MEMSZSTROANESIBMINEE.,'MN4
Plat Key: 002677 Name: TRENTWOOD ORCHARDS District: East
Parcel Number: 45022.0905 Block:
SiteAddress: 4711 N ADAMS RD
Location:: CSV
Lot:
Owner: Name: FRITZ, ROBERT A & TAMMY M A
Address: 4711 N ADAMS RD
SPOKANE, WA 99216-1305
Zoning: R-3 SF Res District
Water District: 001 TRENTWOOD Hold: 7
Area: 13,200 Sq Ft
Nbr of Bldgs: 0
Review Information:
Width: 0
Nbr of Dwellings: 0
Depth: 0 Right Of Way (ft): 0
Review
Building Plan Review
Released By:
Septic Sys Review
Originally Released: 12/15/2008 By: tmelbourn
I Released By:
Originally Released: 12/12/2008 By: lhalsey
Landuse/Zoning/HE Conditions
Released By:
Sewer Review
Permits:
Originally Released: 12/15/2008 By: CJJANSSE
Released By:
Operator: JD
Originally Released: 12/12/2008 By: jdavis
Printed By: jmm
e-"
Print Date: 12/15/2008
Project Number: 08004778 Inv: l
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Date: 12/15/2008
Contractor: AIKEN GENERAL CONTRACTING Firm: AIKEN GENERAL CONTRACTING
Address: PO BOX 425 Phone: (509) 688 -9682
COLBERT WA 99005
Building Characteristics
Building Height 16
Description Grp Type Notes
RES ADD R -3 VB
Item Description
RESIDENTIAL PERMIT FEE
WSBC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Notes:
Need final from Roger Rivers. County Utilities- (509)477 -3604.
This Application: Total Project:
Sq Ft Valuation Sq Ft Valuation
490 $46,545.10 490 $46,545.10
Totals: 490
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
$46,545.10 490 $46,545.10
Fee Amount
$613.45
$4.50
$245.38
Permit Total Fees:
Payment Summary:
Permit Type
Building Permit
$863.33
Fee Amount Invoice Amount Amount Paid Amount Owing
$863.33 $863.33 $0.00 $863.33
$863.33 $863.33
$0.00 $863.33
Page 2 of 2
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and /or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm
Print Date: 12/15/2008
POKANE COUNTY HEALTH DEPARTMENT
Division of Sanitation
1 127 W. Mallon Avenue
Spokane I I, Washington
No 5517
DATE 9 ..
APPLICATION FOR PERMIT TO INSTALL OR RECONSTRUCT SEWAGE DISPOSAL FACILITIES
Name
_Address of Proposed- ite ; . :.. ........ _ . :......... " ?
Type of Use
Addree
Other
*.. hone a -..L ? :...
. Size of Property # n C
Z 2..x..0.9 a5
Number of Bedrooms Building Capacity- Camp Capacity Other......
Is property below grade of streets or alleys ?.,_ ._ __ Are streets graded in?
Is basement for betiding planned?
Water Supply
Septic tank capacity
Length of disposal field. ...._/:.:..'._.
How much excavation or fill proposed"
y, Well, Spring).
gals. Style of tan
(1) Draw in property area to scale.
(2) Show relative location of: Proposed house, septic tank,
disposal field, well, garage, and other out buildings.
(I) Make note of any heavy slope or swampy area or any
other important: topographic details.
Date when test bole will be ready for
inspection
Date installation will be ready for final inspection (that is,
before backfilling)
SANITARIAN'S REPORT AND RECOMMENDATIONS:
Date of Inspection.
Topography
Ground Water ..... ................................ ......_ ............
Soil Condition Percolation tests: Minutes
Special Recommendations....
Final Inspection Date,
Remarks-
Form a4e7 —r l h - -2t M - -li -sir)
I11COM1*1ENDED PERMIT BE
By
Sanitarian
23. CRP 2972A + Magnesium Sewer Extn (Stiltz/Spk Rock CRP- 29872A -002): Pipe complete. Record drawings done. Final
CO /PE signed and returned to Engineer's to do close -out.
County Projects 2007:
1. Green Haven Ph 1 (Matei /KRiver): Depner to complete model in HYDRA for Green Haven. Sewer complete, roadwork
underway. Complete. Clean -up underway. Post pave TV done. Release from construction pending; will need to notify
residents.
2. Grandview Acres (StiltzlKRiver P5319): Pre - design 75% complete. Released. Waiting to receive Holcim Agreement.
Stiltz to invoice Holcim for clean -up work. PM to submit billing for City of Spokane Valley portion of paving to
Cooke.
3. Riverwalk PS (Stiltz/CH2M P5400): Revising scope of bid and rebidding late 2008. Cooke /Stiltz to prepare contract
amendment with CH2M.
4. Trentwood (Matei /KRiver P5320): Some punch list items need to be completed (above ground items). Matei working on
Trentwood /Rockwell/West Farms /Summerfield Pre - Design Report for Cooke's review. PM to prepare billing for City of
Spokane Valley portion of paving. Lines being released for connection — 11/13108.
5. Wandermere (Repp /SI P5322): Released. Record drawings complete. No punch list items remaining. Received final
CO /PE.
6. City Garden (Repp /SI P5322): Released. Record drawings complete. Cooke forwarded billing for E&R portion of
paving. No punch list items remaining. Received final CO /PE.
7. Pinery Ph 1 (Repp /Sl P5322): Record drawings completed for cased portion only. Received field as- builts. Stub -out from
Shady Lane installed. Received final CO /PE.
8. Spaldings Ph 2 (Repp /Owens P5930): Pipe /paving complete. PM to prepare billing for City of Spokane Valley portion of
paving. Still waiting for PE w /road quantities.
9. Vercler PS (Stiltz/Goebel P5480): Expected testing start-up testing date 12/08/08. Electrical work underway. Wet well'
coating underway. Redoing landscaping due to Avista transformer requirements.
10. Freya /Gerlach (Stiltz/Depner): Pipe done. Post pave TV inspection requested.
County Projects 2008:
1. Trent Ave Bridge Pipe Crossing (Stiltz/SI P5859): No response yet to the letter to RR requesting permit and partial
refund. Pipe complete. Punch list items need to be done.
2. Rockwell Ph 1 /Summerfield Ph 1 (Matei /KRiver P5321): Rockwell mainline complete. Summerfield Ph. 1 mainline
complete. PM to prepare billing for City of Spokane Valley portion of paving. Working on punch list items.
Summerfield Ph 2 (Matei /KRiver P5321): 100% of pipe installed. Rockwell cul -de -sac needs to be paved. PM to prepare
billing for City of Spokane Valley portion of paving. Working on punch list items.
Sutters Ph 3 (Stiltz/SI P5928): Paving complete. PM to prepare billing for City of Spokane Valley portion of paving. Post
pave TV complete, awaiting review by C /M.
5. White Birch (Stiltz/Owens P5930): Pipe installation complete. PM to prepare billing for City of Spokane Valley portion of
paving. Paving complete — post pave TV underway. Released Riverside Avenue.
6. Rockwell Ph 2 (Matei /SI P5929): 85% of pipe installed. One small area near Trent & Evergreen will be carried over. PM
to prepare billing for City of Spokane Valley portion of paving. Working on punch list items. Postcards sent to
residents regarding area to be carried over.
7 Westwood (Repp /KRiver P5927): Mainline 90% complete. One small area in the southwest corner of the project will be
carried over All of this years' paving complete. Construction working to resolve Silver Pines final grade issues.
3 Pinery Ph 2 (Repp /SI P6080): Need to complete pre- design report Shady Slope bore may start in 2 weeks. Postcard
sent to Galen Park Addition regarding project being carried over.
Page 2 of 4
Spokane
Valley®
For City Use, Only
PLUS Project Number (1 j ( 1
Project Address
tf
11703 E Sprague Ave Suite B -3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 • permitcenter @spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re- submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre - Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick -up. Information regarding fees and pre - construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE - APPLICANT PINK - BUILDING FILE REV 9/07
--\
ci
U Is_
a> n i...\
P ?-1 z. 0
ct„--- E. P/'I ciiica/(1-fl
76 "
m
L
/61,
/3„2,1
th
k!.
0
3
4