Loading...
2008, 12-05 Permit Application: 08004718 ResidenceSpokane 4_ . Valleyh Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B -3 Spokane Valley, WA 99206 (509)688 -0036 FAX: (509)688 -0037 www.spokanevalley.org PERMIT NUMBER: OS,_ yl PERMIT FEE: K. New Construction n Addition/Remodel Other: Accessory Bldg Deck SITE ADDRESS: ASSESSORS PARCEL NO: , �" �, .7 / . c9 8 / �( LEGAL DESCRIPTION: Building Owner: Name: Spl + POri C r�(a4dr5. / r Name: "� e. 0 Co- nesr City: r / L Address: N Si! i n a I t h I City: 0�.5 Orc ar S Stake: (" p Zip:590 -) TO Phone: gic Zpc Fax: 'EC OV. ATI Z36 Contact Person Name: ��, 0 r) r►d r✓ Phone: `7 tj -j Describe the scope of work in detail: Proposed Use: Contractor: Name: Spl + POri C r�(a4dr5. / r Address: pr, / 67 ' �Sttate: City: r / L y Zip a I Phone: 7 6� __ z6/,9 Fax: IMPERVIOUS SURFACE AREA: �0(� FINISHED BASEMENT SQ. FTG: �} Contract I�,,is R6 ,/3. Exp Date: 'EC OV. ATI Z36 Q. FTG: City Business Lic. No: 6c) Z - ��0 _ g3. / - # OF BEDROOMS: Cost of Project: $ /$7 ) ly ksnle2 IZES ►Q * * * * * * * * * * * ** *The following MUST be complete: (write N/A if not applicable ) * * * * * * * * * * * * * * * * * * * * ** HEIGHT TO PEAK:! DIMENSIONS: Li— �j vl l ' C # OF STORIES: —. ��— TOTAL A :I ABLE ]$PACE: ii�'�, lip 164016,2Z MAIN FLOOR TO SQ. FTG: `� 2Nu FLOOR SQ. FTG: -�° l ` J 7� UNFIN BASEMENT SQ. FTG: o�cr�' G��I �D / IMPERVIOUS SURFACE AREA: �0(� FINISHED BASEMENT SQ. FTG: �} GARAGE SQ. FTG: `� .$ CP 'EC OV. ATI Z36 Q. FTG: 30% SLOPES ON PROPERTY: j 2 -- 13v # OF BEDROOMS: COVST U TIOItJ TYPE: Si . �w'lk AT S RCE: Av— SEWER OR SEPTIC? J'.l, -�P>�-- (Jr) � Td✓' The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is /will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. C, SIGNATUR Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 BrCheck ❑ Mastercard Expires: DATE: z c/V C Ts ❑ VISA VIN #: DEC 05 2000 Project Number: 08004718 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Date: 1/2/2009 Page 1 of 4 Permit Use: NEW SFR W /ATT GARAGE ON SEWER W/ GAS Setbacks: Front Site Information: Plat Key: Name: TRENTWOOD ORCHARDS Contact: JCO INVESTMENTS, LLC Address: 5821 N CAMPBELL RD C - S - Z: OTIS ORCHARDS, WA 99027 Left: Right: Rear: Phone: (509) 924 -2608 Group Name: Project Name: v District: East Parcel Number: 45021.0814 Block: SiteAddress: 4722 N ADAMS RD Location:: CSV Zoning: R -3 SF Res District Water District: Area: 11,001 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Lot: Owner: Name: JCO INVESTMENTS, LLC Address: 5821 N CAMPBELL RD OTIS ORCHARDS, WA 99027 Hold: iJ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released By: Potable Water Review Originally Released: 12/9/2008 By: tmelbourn Released By: Landuse /Zoning/HE Conditions Released By: Sewer Review Permits: Originally Released: 12/8/2008 By: mharnois Released By: SEWER PERMIT #08006976 Operator: JD Originally Released: 12/5/2008 By: MTURBAK Printed By: JD Print Date: 1/2/2009 Project Number: 08004718 Inv: 1 Application Date: 1/2/2009 Page 2 of 4 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Contractor: SPLIT ROCK CONTRACTORS Address: 4505 E BIXEL CT MEAD, WA 99021 Item Description APPROACH -CONST IN ROW Approach Firm: SPLIT ROCK CONTRACTORS LL Phone: (509) 768 -2689 Units Unit Desc 1 NUMBER OF Contractor: SPLIT ROCK CONTRACTORS Address: 4505 E BIXEL CT MEAD, WA 99021 Description Grp Type Notes 1&2 FAMILY R -3 VB 2ND FLOOR R -3 VB BASEMENT U R -3 VB COV DECK R -3 VB DECK OPEN R -3 VB GARAGE U -1 VB Item Description RESIDENTIAL PERMIT FEE WSBC SURCHARGE SF PLNS RVW < 7999 SQ FT Fee Amount $50.00 Permit Total Fees: $50.00 Building Permit Firm: SPLIT ROCK CONTRACTORS LL Phone: (509) 768-2689 This Application: Total Project: Su Ft Valuation Su Ft Valuation 901 $85,585.99 901 $85,585.99 724 $54,068.32 724 $54,068.32 901 $13,515.00 901 $13,515.00 130 $1,950.00 130 $1,950.00 120 $1,800.00 120 $1,800.00 506 $9,614.00 506 $9,614.00 Totals: 3,282 $166,533.31 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Operator: JD Printed By: JD Permit Total Fees: Print Date: 3,282 $166,533.31 Fee Amount $1,368.95 $4.50 $547.58 $1,921.03 1/2/2009 Project Number: 08004718 Inv: 1 Application Date: 1/2/2009 Page 3 of 4 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Contractor: Address: SPLIT ROCK CONTRACTORS 4505 E BIXEL CT MEAD, WA 99021 Item Description DUCT SYSTEMS GAS WATER HEATER GAS PIPING HEAT PUMP OR A/C 0 -3 TONS VENTILATING FANS CLOTHES DRYER RANGE AIR HANDLER <= 10,000 CFM HOOD -TYPE II Mechanical Permit Units Finn: SPLIT ROCK CONTRACTORS LL Phone: (509) 768 -2689 Unit Desc Contractor: SPLIT ROCK CONTRACTORS Address: 4505 E BIXEL CT MEAD, WA 99021 Item Description TOILETSBIDETS SINKS SHOWERS TUBS DISH WASHERS GARBAGE DISPOSAL CLOTHES WASHER FLOOR DRAINS MISCELLANEOUS FIXTURES WATER PIPING - DWV 1 NUMBER OF 1 NUMBER OF 2 # OF UNITS 1 NUMBER OF 4 NUMBER OF 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF Permit Total Fees: Plumbing Permit Fee Amount $10.00 $10.00 $2.00 $12.00 $40.00 $10.00 $10.00 $12.00 $10.00 $116.00 Firm: SPLIT ROCK CONTRACTORS LL Phone: (509) 768 -2689 Units Unit Desc 3 NUMBER OF 5 NUMBER OF 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF 3 NUMBER OF 1 NUMBER OF Operator: JD Printed By: JD Fee Amount $18.00 $30.00 $6.00 $6.00 $6.00 $6.00 $6.00 $6.00 $18.00 $6.00 Permit Total Fees: $108.00 Print Date: 1/2/2009 Project Number: 08004718 Notes: Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 1/2/2009 Page 4 of 4 Payment Summary: Permit Type Approach Building Permit Mechanical Permit Plumbing Permit IMMEAD Fee Amount $50.00 $1,921.03 $116.00 $108.00 Invoice Amount $50.00 $1,921.03 $116.00 $108.00 Amount Paid $0.00 $0.00 $0.00 $0.00 Amount Owing $50.00 $1,921.03 $116.00 $108.00 $2,195.03 $2,195.03 $0.00 $2,195.03 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and /or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 1/2/2009 Q O O ,I Q0 i cr 0 Spokane Valley ® For City Use Only PLUS Project Number O � 7 ( Project Address 11703 E Sprague Ave Suite B -3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter @spokanevalley.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. I 1r3. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re- submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre - Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick -up. Information regarding fees and pre - construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE - APPLICANT PINK - BUILDING FILE REV 9/07 k b 78 PLANNING D T:AP ED D� E: 4.„ 7� it\ 9 " 2 plANN1NGM1t• APPROVED •