2013, 02-13 Permit: SW-13000078 Sewer ConnectSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW- 13000078
Permit Issued Date:
02/13/2013
Expiration Date: 02/14/2013
Project Description: SEWER CONNECTION
Project Name: EASTON
Permit Type: SEWER
Primary Contact: TILTON EXCAVATION, LLC
Applicant: TILTON EXCAVATION, LLC
Address: PO BOX 429
OTIS ORCHARDS, WA 99027
Phone: 509 - 226 -1269
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
11218 E ALKI AVE
45163.0245
Subdivision: EASTON SUBDIVISION
Assessor's Description: OPP EASTON SUB B111 L1 B1
Inspection Area:
Owner: MOHNEY, WILLIS
Address: 314 AIRPORT WAY
SEVEN BAYS, WA 99122
Phone:
Email:
Water District: Modern Fire District: Spokane Valley Fire
Electric Water Company
Zoning: Land Area: 9850 Square Feet
CONTRACTOR INFORMATION:
General Contractor
TILTOEL937BT
TILTON EXCAVATION, LLC
PO BOX 429
OTIS ORCHARDS, WA 99027
509 - 226 -1269
DETAILS:
Class
SEWER
Type
Quantity Unit Charge Value
SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
Total Fee:
$125.00
$26.32
$125.00
$151.32
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1- 800 - 424 -5555 BEFORE YOU DIG - -AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 02/13/2013 15:10:15
Printed by: IIS APPPOOL \SmartGovProdApp
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW- 13000078 02/13/2013
Expiration Date: 02/14/2013
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477 -3604 FROM 8:30 -5:00 MONDAY - FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30- MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 02/13/2013 15:10:15 Printed by: IIS APPPOOL \SmartGovProdApp