Loading...
2008, 06-18 Permit Application: 08002328 Bedroom Addition, Partial ReroofjValley Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B -3 Spokane Valley, WA 99206 (509)688 -0036 FAX: (509)688 -0037 www.spokanevalley.org PERMIT NUMBER: PERMIT FEE: n New Construction Accessory Bldg Addition/Remodel n Deck n Other: SITE ADDRESS: t. / 13 U �5 / I t+ 5 rt4 ii+e_ UQ,Ii ey / c) / / 9920 (0 ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: g DIMENSIONS: # OF STORIES: / n� 1 ( I Name: I] etA vl 1 'S 1� r l t u Cl l "L Address: Address: City: State: Zip: City: State: Zip: Phone: Cif 2$ _ 2:3 v l Fax: City Business Lic. No: Contact Person n Name: D�n.vuCS Lad (A`-1 Phone: q ° �{ 246 1 g DIMENSIONS: # OF STORIES: / TOTAL H ABITA LE SPACE: S 44- Name:—.3--.:6- —Y` Address: UNFIN BASEMENT SQ. FTG: City: State: Zip: Phone: ZG? -7 /D 5- Fax: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON TY: Contractor Lic No: Exp Date: CONSTRUCTION TYPE: City Business Lic. No: ` 4 Descri s ope of w in d i;(}k % �, c .. --o v2, cwt �" , r)17(rbfl 3 Oita) Proposed Use: ' �P 1 :5 c a — yr �� 4.) cr 4 * * * * * * * * * * * ** *The followin MUST be complete: (write N/A if not applicable ) * * * * * * * * * * * * * * * * * * * * ** HEIGHT TO PEAK: g DIMENSIONS: # OF STORIES: / TOTAL H ABITA LE SPACE: S 44- MAIN FLOOR T93SQ. FTG: �� 1 i A �6 �' Sf ND 2 FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: FINISHED BASEMENT SQ. FTG: GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON TY: # OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: ` 4 The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) AU construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. Method of Payment: ❑ Cash Bankcard #: Authorized Signature: ❑ Check ❑ Mastercard Expires: 67/R ❑ VISA VIN #: Effective 10 -28 -07 Page l of l http: // www. spokanevalley. org /uploads /Community_Development/ Documents /FormsBuilding/Residential Building Permit Ap .doc RECEIVED BY CITY OF SPOKANE VALLEY JUt4 1 2006 PERMI ENTER Ptoj ect Number: 08002328 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 6/23/2008 Page 1 of 2 Project Information: Permit Use: RES BEDROOM ADD/ REROOF PORTION OF Contact: MIDDLETON, DENNIS & PEGGY EXISTING HOME Address: 11308 E ALKI AVE C - S - Z: SPOKANE VALLEY, WA 99206 Setbacks: Front Left: Right: Rear: Phone: (509) 892 -6666 Group Name: Site Information: Project Name: Plat Key: 001858 Name: OPPORTUNITY, SUB EAST 1/3 TR 121 District: Nort Parcel Number: 45163.0274 SiteAddress: 11308 E ALKI AVE Location:: CSV Block: Lot: Zoning: R -3 SF Res District Water District: 011 MODERN Area: 23,600 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 1 Review Information: Owner: Name: MIDDLETON, DENNIS & PEGGY Address: 11308 E ALKI AVE SPOKANE VALLEY, WA 99206 Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released By:, Originally Released: 6/19/2008 By: tmelbourn Landuse /Zoning/HE Conditions Permits. Released By: Originally Released: 6/19/2008 By: mpalaniuk Operator: JD Printed By: JD Print Date: 6/23/2008 Project Number: 08002328 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 6/23/2008 Contractor: OWNER Building Permit Page 2 of 2 Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation RES ADD R -3 VB 304 $28,876.96 304 $28,876.96 Item Description RESIDENTIAL PERMIT FEE WSBC SURCHARGE SF PLNS RVW < 7999 SQ FT Totals: 304 $28,876.96 304 $28,876.96 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Fee Amount $431.65 $4.50 $172.66 Permit Total Fees: $608.81 Notes: Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $608.81 $608.81 $0.00 $608.81 $608.81 $608.81 $0.00 $608.81 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and /or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 6/23/2008 Spokane jValley Site Address: 11308 E ALKI AVE Parcel Number: 45163.0274 Zoning: R -3 Fire District: FD 01 Project Transmittal City of Spokane Valle- Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, W A 99206 Phone: 509.688.0036 New project F Previous pre -app meeting❑ Plan revisions D Transmittal Date: Wednesday, June 18, 2008 Water District: MODERN Project Number: 08002328 Applicant: MIDDLETON, DENNIS & PEGGY 11308 E ALKI AVE SPOKANE VALLEY, WA 99206 (509) 892 -6666 e -mail: Contact: MIDDLETON, DENNIS & PEGGY 11308 E ALKI AVE SPOKANE VALLEY. WA 99206 (509) 892 -6666 e -mail: Contractor: OWNER () - 0 Owner: MIDDLETON, DENNIS & PEGGY 11308 E ALKI AVE SPOKANE VALLEY, WA 99206 e -mail: Occupant: e -mail: Arch / Engineer: e -mail: REMVE0 JUN 1 8 2EO8 UV=D[INg D Project RES BEDROOM ADD/ REROOF PORTION OF EXISTING HOME Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPL;ICATION SITE PLAN PLANS Please send all plan review and project comments via e-mail to the highlighted individuals. Spokane jUalley For City 14.e Only PLUS Project Number( 00?y71)2% Project Address 11703 E Sprague Ave Suite B -3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter @spokanevalley.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is 2- 1 The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re- submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre - Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick -up. Information regarding fees and pre - construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE — APPLICANT PINK — BUILDING FILE REV 9/07 SCUT 0£I w £T69 0£I w O _ ~ W � F-+ 00'S8 00'88 68 N N 9S U1 cr SL 'a N S6 rS'7. 6S'LI t IL' r!! 6.9CL6 LC L6 O N 860E LL 00 tn 8 n7T R/ { a -9 -4- 5/. 6.5 EPT. APPROVED �oP- 5x(34it^3. Aloe) 5a iii 1.4/60 4cicy 1q,Xz.` Ir 01/ t JUN , 2000 `>, F -'l_!"tti�� i� .. -1\: i=ii WASHINGTON STATE ENERGY CODE TABLE 6 -2 PRESCRIPTIVE REQUIREMENT S °'t FOR GROUP R OCCUPANCY CLIMATE ZONE 2 * Reference Case 0. Nominal R- values are for wood frame assemblies only or assemblies built in accordance with Section 601.1. 1. Minimum requirements for each option listed. For example, if a proposed design has a glazing ratio to the conditioned floor area of 13 %, it shall comply with all of the requirements of the 15% glazing option (or higher). Proposed designs which cannot meet the specific requirements of a listed option above may calculate compliance by Chapters 4 or 5 of this Code. 2. Requirement applies to all ceilings except single rafter or joist vaulted ceilings complying with note 3. 'Adv' denotes Advanced Framed Ceiling. 3. Requirement applicable only to single rafter or joist vaulted ceilings where both (a) the distance between the top of the ceiling and the underside of the roof sheathing is less than 12 inches and (b) there is a minimum 1 -inch vented airspace above the insulation. Other single rafter or joist vaulted ceilings shall comply with the "ceiling" requirements. This option is limited to 500 square feet of ceiling area for any one dwelling unit. 4. Below grade walls shall be insulated either on the exterior to a minimum level of R -12, or on the interior to the same level as walls above grade. Exterior insulation installed on below grade walls shall be a water resistant material, manufactured for its intended use, and installed according to the manufacturer's specifications. See Section 602.2. 5. Floors over crawl spaces or exposed to ambient air conditions. 6. Required slab perimeter insulation shall be a water resistant material, manufactured for its intended use, and installed according to manufacturer's specifications. See Section 602.4. 7. Int. denotes standard framing 16 inches on center with headers insulated with a minimum of R -10 insulation. 8. This wall insulation requirement denotes R -19 wall cavity insulation plus R -5 foam sheathing. 9. Doors, including all fire doors, shall be assigned default U- factors from Table 10 -6C. 10. Where a maximum glazing area is listed, the total glazing area (combined vertical plus overhead) as a percent of gross conditioned floor area shall be less than or equal to that value. Overhead glazing with U- factor of U =0.40 or less is not included in glazing area limitations. 11. Overhead glazing shall have U- factors determined in accordance with NFRC 100 or as specified in Section 502.1.5. 12. Log and solid timber walls with a minimum average thickness of 3.5" are exempt from this insulation requirement. Effective July 1, 2007 34 Option Glazing Glazin U- Factor s Door U- Factor Ceiling2 Vaulted Ceiling Wa1112 Above Grade Wall• int int 4 Below Grade Wall• a ext 4 Below Grade SIab6 on Grade Area10: /o of Floor % Vertical 11 Overhead . 12% 0.35 0.58 0.20 R -38 R -30 R -21 int' R -21 R -12 R -30 R -10 II.* 15% 0.35 0.58 0.20 R -38 R -30 R -19 + R -58 R -21 R -12 R -30 R -10 III. 17% 0.32 0.58 0.20 R -38 R -30 R -19 + R -58 R -21 R -12 R -30 R -10 IV. 25% Group R -1 and R -2 Occupancies Only 0.35 0.58 0.20 R -38 / U =0.031 R -30 / U =0.034 R -21 int' / U =0.054 R -15 R -12 R -30 / U =0.029 R -10 / F =0.54 V. Unlimited Group R -3 and R-4 Occupancies Only 0.35 0.58 0.20 R -38 R -30 R -19+ R -5 8 R -21 R -12 R 30 R -10 VI. Unlimited Group R -3 and R -4 Occupancies Only 0.30 0.58 0.20 R-49 or R -38 Adv R -38 R -21 int' R -21 R -12 R -30 R -10 VII. Unlimited Group R -1 and R -2 Occupancies Only 0.32 0.58 0.20 R -38 / U =0.031 R -30 / U =0.034 R -21 int' / U =0.054 R -15 R -12 R -30 / U =0.029 R -10 / F =0.54 * Reference Case 0. Nominal R- values are for wood frame assemblies only or assemblies built in accordance with Section 601.1. 1. Minimum requirements for each option listed. For example, if a proposed design has a glazing ratio to the conditioned floor area of 13 %, it shall comply with all of the requirements of the 15% glazing option (or higher). Proposed designs which cannot meet the specific requirements of a listed option above may calculate compliance by Chapters 4 or 5 of this Code. 2. Requirement applies to all ceilings except single rafter or joist vaulted ceilings complying with note 3. 'Adv' denotes Advanced Framed Ceiling. 3. Requirement applicable only to single rafter or joist vaulted ceilings where both (a) the distance between the top of the ceiling and the underside of the roof sheathing is less than 12 inches and (b) there is a minimum 1 -inch vented airspace above the insulation. Other single rafter or joist vaulted ceilings shall comply with the "ceiling" requirements. This option is limited to 500 square feet of ceiling area for any one dwelling unit. 4. Below grade walls shall be insulated either on the exterior to a minimum level of R -12, or on the interior to the same level as walls above grade. Exterior insulation installed on below grade walls shall be a water resistant material, manufactured for its intended use, and installed according to the manufacturer's specifications. See Section 602.2. 5. Floors over crawl spaces or exposed to ambient air conditions. 6. Required slab perimeter insulation shall be a water resistant material, manufactured for its intended use, and installed according to manufacturer's specifications. See Section 602.4. 7. Int. denotes standard framing 16 inches on center with headers insulated with a minimum of R -10 insulation. 8. This wall insulation requirement denotes R -19 wall cavity insulation plus R -5 foam sheathing. 9. Doors, including all fire doors, shall be assigned default U- factors from Table 10 -6C. 10. Where a maximum glazing area is listed, the total glazing area (combined vertical plus overhead) as a percent of gross conditioned floor area shall be less than or equal to that value. Overhead glazing with U- factor of U =0.40 or less is not included in glazing area limitations. 11. Overhead glazing shall have U- factors determined in accordance with NFRC 100 or as specified in Section 502.1.5. 12. Log and solid timber walls with a minimum average thickness of 3.5" are exempt from this insulation requirement. Effective July 1, 2007 34 P H O { EL V/'iT�?j r ,,17r ) rl .09 -z H �n H WWW1- W O m 5a�WIia� W ooc=immcrii VJNZZdc7a IA In Q N')N N`tZ a 1- W a a.5 * -1C a 1 izo V Mig' Wta > 0 iaziu2g s yaj46..W w Z - Z_a W -,6,.,_,- W J.J Ir. W VOVVxu sN �y r —d►-rQ 0 Wa:WW 2 +_ Ztd2Z� + S n,e%�v,no 0 N 2 fa- yibr7 '/0 / \. .,ONCRETE TO COMPLY TO IRC TABLE 404.1.1(1) (/) o cc a. o 0* cc 5 < —J , < (1) LLJ o z 0 § - 05 0 Lt. CO ALL FOOTINGS MUST BE CONTINUOUS g -E1 81 cz1 2 City of SPOKANE VALLEY BUILDING DEPARTMENT 11707 E. Sprague Avenue fr1 Do, Spckane Valley, Washington 99205 - Tel 509- 6B3 -GD36 - Fax 509- S33 -DDs'7 Following s a typial cos s_c5on far a residenEai games_. It rrey not represent the prcpesed project If you are using the d_ as a porfion of your plan vubrnItat, please complete the requested information in the b. es- provided on both sides of this sheet Ties eompletad sheet, along with any a3di6oral inforrna5on needs to be submird with your aph Son and be on sib ad Lhe 5rne of hspec5on. PROTECTION AND OPENINGS BETWEEN DWELLINGS AND PPJVATE GARAGES SHALL HAVE: 1) MCAT EEP,lALS APPROVED FOR ONE HOUR FIRE PESISTIVE CONSTRUCTION ON THE GARAGE SIDE 518' TYPE 7C GYP BOAP.D (HABITABLE SPACE ABOVE) 112' GYP BOARD (RESIDENCE/ATTIC, FLOOPJCEILING) 2) OPENINGS BETWEEN GARAGE AND RESIDENCE SHALL BE EQUIPPED WITH SOLID WOOD DOOR, SOLID OR HONEYCOMB CORE a I tit DOORS NOT LESS TI-IM 1 3B', OR 20 MINUTE FIRE RATED DOORS. N1101.3.1— Attic insulation certification required as to R — value or coverage. Markers, attached to trusses or rafters, required for every 300 sf of attic space with 1 inch high numbers for installed thickness of insulation. Attic Ventilation 1 Sq Ft per every 300 Sq Ft of space ventilated with at least 50% in the upper portion of roof area. Attic Accessible by 22' x 30" 'lee 6 //32._ CEILING: ' /2" GWB allowed if \I ROOF SHEATHING NOTE Diagonal wrap bracing required on each corner and every 25 feet of wall. Walls within 3 feet of a property fine or within 3 feet of a dwJiing must be 1 hour rabd. (St3' type 'X' gypsum sheathing on both sides of wall). Openings are not p..rrnitt d in fhse walls. Garages over 3,0(70 sq. ft require protec5on when cieser than 20 feet b the property fine. Parapets may be required. ENGINEERED TRUSS OR RAF FER SIZE AND SPACING x @ O.C. erAiR- 1 .‘9 4fehforict ��►,'` + • protection 1 To 2`F`t 4, ,c € �iCTt+.YLCO R wlq 4. DOUBLE TOP PLATE WALL HEIGHT - Ss / ROOFING MATERIAL ROOFING PAPER perpendicular to rafters or trusses 1 /8" GAP 24" oc and no water based texture used — otherwise 5/8" GWB. BE i v EEN SHEA Tyicts cCgN�.T SOLID BLOCKING B ET I'VEEN.TRUSSES Barrier required (2}a4 RESA1 under siding MIN. 6" MIN. 24"MIN. (2) f4 REBAR WALL SHEATHING . (TA 6 24" MIN. SIDING 2( ti 2o: @ ?q o.c. PRESSURE TREATED SOLE PLATE -1 `ANCHOR BOLTS 112'x9' MIN. (7' INTO CONCRETE) 6' O. C. OR APPROVED ANCHOR INSTALLED PER MANUFACTURER r-- ...,...... 5'X12' FOOTING 6GG rZ T1F e Dam foun foo ccaw1 ac or ase e t 36 DETAILS FOR CONVENTIONAL WOOD FRAME CONSTRUCTION Figure 40. Draftstopping of Trussed Floors Figure 41. Multiple Studs at Corners Figure 42. Wall Framing at Intersecting Partitions I 1 AMERICAN WOOD COUNCIL Figure 43. Exterior Wall Openings, Header Details with Cripple Studs Figure 44. Exterior Wall Openings, Header Details with Joist Hangers T; REP J8 £1414.lIU8 8IHT 2V1OIT33HFO3 QIT 3 ey1I GLI31R OT AMERICAN FOREST & PAPER ASSOCIATION PRGV,nF DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS CITY COPY THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS Siiiikat - REVIEWED FOR CODE COMPLIANCE SPOKANE VALLEY HUI ING ,IVISION rAk 6 •