2013, 09-30 Permit Application: BLD-2013-1996 Pole BldgSfi0 ne llftft%l 11707 E Sprague Ave, Suite 106 PERMIT NUMBER:
Spol �OValley (509 Valley, WA 99206 PERMIT FEE:
.� (509,,. 6 -0036 FAn: (.`�Oi)68o - ^v037 ����
Community Development www.spokanevallev.ora <9-t/
Residential Construction U New Construction Accessory Bldg
Permit Application ❑ Addition/Remodel ❑ Deck
❑ Other:
SITE ADDRESS Z� S - Qi l G-4 L ,v 4 3(1oKi&6- ���
ASSESSORS PARCEL NO: �I�� . 22- O-- LEGAL DESCRIPTION: -TAiA5 +NT PA-2-� L" MiC �
_ C
Name <
41 cr a A 5P �i kST LL c-
Address: 2j �� £� ►CSC
Ci ty: Qds —t- State: --v�t zip: �3g
Phone: 2 ®� D _5- Fax:
Contrary ^'`' ^' Exp rate: L n 20 '
Contact-PerSOII City Business Lic. No:
-- -
Name: l' (,,J �PV'
Phone: ® 5 M,'
e sco e of work in detail: Cost of Project:
Descnbe th p
* * * * * * * * * * * ** *The following MUST be complete: (write N/A if not applicable ) * * * * * * * * * * * * * * * * * * * * **
HEIGHT TO PEAK: - f
DIMENSIONS.
# OF STORIES:
TOTAL HAt31 IAbLt
7�3
�8f y' r .l
MAIN FLOOR TO SO.
2 O R SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
FTG:
�
AREA:..
GARAGE SQ. FTG:
OV. PATIO SQ. FTG:
30% SLOPES ON
SQ. FTG:
30`134t 2 a
C STRUCTJ
HEAT SOURCE:
PROPERTY:
SEWER OR SEPTIC?
# OF BEDROQMS:
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is /will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances.6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
Signature
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 8/252005
Check ❑ Mastercard
Expires:
Date Ilk/
Project #
❑ visA RECEIVED
VIN #:
SEP 3 r 2013
CSV PERMIT CENTER
SUB # ' --�- -' R v. � �-
%Wool
F(Z�-
,5p
I -Cfb
I
DOT,0 FRO VED
t!:�)
I L'-
E,1 i S Ti
/-/O 0 S<—,
Project # 4
REC I Vt
1 ^ 2013
CSV PERMIT CENTER
SUB # R- -- \,
-70
X2 Ob
fig
O
Y'
1.2
W
gpnO4 ne�
fVaneve
A
Target Date sheet
For City Use Only
!y I �- I
PLUS Project - L ' � -
) �(
Project Address — '
—� 11703 E Sprague Ave Suite B -3 ♦ Spokane Valley WA 99206
509.720 -5240 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project application, we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re- submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your
target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre - Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick -up. Information regarding fees and pre - construction meetings (if required) will be provided by the Permit Specialist at
that time.
CD -003 V -7/ 06 -21 -11 Page 1 of 1
509 926 1519 INLAND PROFESSIONALT
Inland
Professional
Title, LLC
OWNERSHIP INFORMATION
m. 09 -26 -2013 112
Map Page Grid
P&Cti�"�l)7����� t
i
Spokane County Locations:
S
Central Office/Title & Escrow
i Cataldo Office /Escrow 3
501 S. Bernard 1st Floor
25 West Cataldo
4-11
Spokane, Washington 99204
Spokane, Washington 99201
(509) 922 -2222
{ (509532 -5000
: 623 S Beige Ln Spokane Valley Wa 99016
,SV = -IMIT CENTER I
OWNERSHIP INFORMATION
ASSESSMENT AND TAX INFORMATION
Map Page Grid
Owner
: Niebuhr Laurie A
CoOwner
Census Tract
Site Address
: 623 S Beige Ln Spokane Valley 99016
Mail Address
: 623 S Beige Ln Spokane Valley Wa 99016
Taxpayer Name
: Martin William L
TaxBillAddress
: 623 S Beige Ln Spokane Valley Wa 99016
D U V rr L-!
Parcel Number 5K1912207
Total Buildings : 1
S: 19 T: 25N R: 45E Q: NE
Telephone
REV. - I
PROPERTY DESCRIPTION
ASSESSMENT AND TAX INFORMATION
Map Page Grid
: 2271 B2
Land
:$50,800
Census Tract
:131.00 Block: 2
Structure
:$94,800
Neighborhood
: Pheas
Total
:$145,600
School District
: Central Valley
% Improved
: 65
Land Use
: 11 Res,Single Family Residence
Exempt
Lot Dimens
Legal
: PHEASANT PARK LT 7 BILK 1
Tax Rate
:.01458
: 100
Garage
Tax District
:0144 SPOKANE VALLEY
: Central
Stories /Hgt
2013 Taxes
:$2,366.19
: 506
Heating
Excise Tax #
: 8517
PROPERTY CHARACTERISTICS
Bedrooms
: 2
Living SF
:1,044
Lot Acres
: 1.08
TotlBaths
:1.00
Bldg SF
:2,088
Lot SF
: 47,086
HalfBaths
:$101,110
Bsmt %
:100
Lot Dimens
:Warranty
FullBaths
: 1
BsmtFin %
: 100
Garage
: Attached
Air Cond
: Central
Stories /Hgt
: 1
Garage SF
: 506
Heating
: Forced
Attic
Deck
: Wood
HeatSourc
: Gas
Quality
: Avg
Deck SF
:140
Fireplace
Condition
: Good
Patio
Rng/Oven
Bldg Matl
Patio SF
TrashComp
Style
: Ranch 1000 -1499
Porch
Dishwshr
RoofCover
: Comp Shingle
Porch SF
GarbgDisp
RoofShape
: Gable
Year Built
:1995
Intercom
ExtWall
: Wood
Units
Vacuum
Interior
: Drywall
Misclmpvl
: Basic Allowance
Pool
Foundation
: Concrete
Misclmpvl
: Wood Deck W /Rail, Wd Fl
TRANSFER HISTORY
Owner Name(s) Sale Date
Doc # Sale Price
Deed Type
LoanAmount
Loan Type
:Niebuhr Laurie A :07/08/2013
6226095 :$220,000
:Warranty
:$120,000
:Convent
:Martin William L :03/11/2005
5189558
:Quit Claim
:$101,110
:Convent
:Martin William L;Stohl -Martin Sta :10/19/1995
1784 -1652 :$107,720
:Warranty
:$107,131
:Fha
No liability is assumed for any errors in this report. Information is deemed reliable but not guaranteed.
509 926 1519 INLAND PROFESSIONAL T
128031.-
g !I
2 m 3
11:46:42 a.m. 09 -26 -2013
17301 A 1N i In 9roF,9 I 1
c J 1 2303
2/2
20
20
Assess,
20(
1
zzua 8 ' = " ` This map is pro
362 to # whether expres
296 i? 1�
10630 jt merchantability
y� 1 2206 f contained on th
11 6 j
20250 subject to const
12203 362 79
t 9 The County d4
the map will in
\. 1 0629 assumes the en
13 10638 296 12207 7 f�Sj y �j y ` j P'r�c, 01? ! data contained
event for any c
36222 ; m 20263 of this map -f
2 1
22 4. U6 I regardless of ti
10632 12208 6 i J
EL
3
12216 10628
I n 20264
A a D' 2212 n5 A SP
1 2211 1 0
` nb. 11 t2
1221 Is
�b� B1 2213 22c14 ;
319 I 5
190 130 135 12229
2 6 211
9--F1 S �A I^ I' N 0301 4 0302 t2 4 0303 4 0304 4 0305 `
t 3 4 5
004 0201 4 0202 4 _0203 4 0204 4 0205 099 "" .�. 7 0 o r �' S
?Z q Ogp1 4 1105 4 11015�1 2 0° Q ,nu^ tat 29
2 3 N 4
g 1 4 1107 4 1106 g s $a 4 1103 4 1102 '4 1101 g t N4 1302 4 1303 41304 4 1305 r a 3 0809
n 7 3 1 E` 4 1301 5 ,M1y p� 3 Copyright ,ht Spo
Project ;7 ?J'(a
REGEIVE:
{ SEP 3 rl 2013
CSV PERMIT CENTER
k
j SUB # REV. #I
Inland Spokane County Locations:
Central Office/Title & Escrow Cataldo Office /Escrow N
P �eI (Ma 501 S. Bernard 1st Floor 25 West Cataldo
.tie', LAC (509) 922 2222ington 99204 (09) 532 5000ington 99201
■
W K
Parcel #: 551912207
S
THIS SKETCH IS PROVIDED, WITHOUT CHARGE, FOR YOUR INFORMATION. IT IS NOT INTENDED TO SHOW ALL MATTERS RELATED TO THE PROPERTY,
INCLUDING BUT NOT LIMITED TO, AREA, DIMENSIONS, EASEMENTS, ENCROACHMENTS OR LOCATIONS OF BOUNDARIES. IT IS NOT A PART OF, NOR DOES IT
MODIFY, THE COMMITMENT OR POLICY TO WHICH IT IS ATTACHED. THE COMPANY ASSUMES NO LIABILITY FOR ANY MATTER RELATED TO THIS SKETCH,
UNLESS SUCH COVERAGE IS SPECIFICALLY PROVIDED BY THE COVERED RISKS OF THE POLICY. REFERENCE SHOULD BE MADE TO AN ACCURATE SURVEY FOR
FURTHER INFORMATION.