Loading...
1994, 03-18 Letter - RE: Unsatisfactory ConditionDEPARTMENT OF BUILDINGS JAMES L. MANSON, C.B.O., DIRECTOR March 18, 1994 Mr. Roger Bishop E 11409 Alki Spokane, Washington 99206 • C O U N T Y A DIVISION OF THE PUBLIC WORKS DEPARTMENT DENNIS M. SCOTT, P.E., DIRECTOR RE: Notice of Unsatisfactory Condition - Carrier Furnace - Heat Exchange Dear Mr. Bishop: Our office has been informed that an unsatisfactory condition may exist with regard to the heat exchange located at the above - referenced address. This notice is to inform you that should new equipment be required, you will need to obtain a permit. If new equipment is not required, please disregard this notice. Should you have any questions, please contact this office between the hours of 8:00 a.m. and 4:00 p.m., weekdays. Sincerely, MARCIA I. MCGARRIGLE Office Assistant mim o �i- WEST 1026 BROADWAY • SPOKANE, WASHINGTON 99260 • (509) 456 -3675 FAX (509) 456 -4703 FORM FURNISHED BY INLAND NORTHWEST HVAC ASSOCIATION. 4 S ° f ? 008218 301 (6/92) ADS . PHONE NO. Ww y y f 131 > � CUT NAME �� � � � C i ER SI E `"-1 4.7 OWNER ❑ INT NAME AD SS W Z AGENT ❑ I- W CC W W PE NOTIFICATION CONDITION TO BE CORRECTED AS SHOWN BELOW CREATES AN IMMEDIATE HAZARD.THIS EQUIPMENT z CO m MUST NOT BE PUT BACK IN SERVICE UNTIL REPAIRS AND A THOROUGH INSPECTION HAVE BEE t�y� Q H W HAZARD MADE. ISSUER'S PHONE N tJ/ �� 0 Q CONDITION TO BE CORRECTED AS SHOWN BELOW IS NOT IN ACCORDANCE WITH SAFETY STANDARDS '. L Z ❑ WARNING AND COULD CREATE A HAZARD.CORRECTIONS AND A THOROUGH INSPECTION MUST BE MADE o H WITHIN TWO WEEKS. u, El PHONE NO. a' D- CONOTION TO BE CORRECTED: ; Ect.0 4 il /iv ti TA r /2( A 411,/ 91--( Q / tA- /r'/Z-2, JK C? I U) I- I Z TAGGED BY COMPANY L TJd6�4/0 SpgZE� REPAIRED BY COMPANY INITIAL `TTIIIME DAT j CONDITION CORRECTED YES❑ NO❑ INTALLED HAZARD TAG YES❑ NO❑ COPIES SENT TO:(1)CUSTOMER (2)ISSUER (3)AUTHORITY HAVING JURISDICTION (4)EQUIPMENT TAG m