1994, 03-18 Letter - RE: Unsatisfactory ConditionDEPARTMENT OF BUILDINGS
JAMES L. MANSON, C.B.O., DIRECTOR
March 18, 1994
Mr. Roger Bishop
E 11409 Alki
Spokane, Washington 99206
•
C O U N T Y
A DIVISION OF THE PUBLIC WORKS DEPARTMENT
DENNIS M. SCOTT, P.E., DIRECTOR
RE: Notice of Unsatisfactory Condition - Carrier Furnace - Heat Exchange
Dear Mr. Bishop:
Our office has been informed that an unsatisfactory condition may exist with regard to the
heat exchange located at the above - referenced address.
This notice is to inform you that should new equipment be required, you will need to
obtain a permit. If new equipment is not required, please disregard this notice.
Should you have any questions, please contact this office between the hours of 8:00 a.m. and
4:00 p.m., weekdays.
Sincerely,
MARCIA I. MCGARRIGLE
Office Assistant
mim
o �i-
WEST 1026 BROADWAY • SPOKANE, WASHINGTON 99260 • (509) 456 -3675
FAX (509) 456 -4703
FORM FURNISHED BY INLAND NORTHWEST HVAC ASSOCIATION.
4
S ° f ? 008218
301 (6/92)
ADS . PHONE NO.
Ww y y
f 131
> � CUT NAME �� � � � C i ER SI E `"-1 4.7
OWNER ❑ INT NAME AD SS
W Z AGENT ❑
I- W CC W
W PE NOTIFICATION CONDITION TO BE CORRECTED AS SHOWN BELOW CREATES AN IMMEDIATE HAZARD.THIS EQUIPMENT
z CO m MUST NOT BE PUT BACK IN SERVICE UNTIL REPAIRS AND A THOROUGH INSPECTION HAVE BEE t�y�
Q H W HAZARD MADE. ISSUER'S PHONE N tJ/ ��
0 Q CONDITION TO BE CORRECTED AS SHOWN BELOW IS NOT IN ACCORDANCE WITH SAFETY STANDARDS
'. L Z ❑ WARNING AND COULD CREATE A HAZARD.CORRECTIONS AND A THOROUGH INSPECTION MUST BE MADE
o H WITHIN TWO WEEKS.
u, El PHONE NO.
a' D- CONOTION TO BE CORRECTED:
; Ect.0 4 il /iv ti TA r /2( A 411,/ 91--(
Q / tA- /r'/Z-2, JK C? I
U) I-
I Z TAGGED BY COMPANY L
TJd6�4/0 SpgZE�
REPAIRED BY COMPANY INITIAL `TTIIIME DAT
j CONDITION CORRECTED YES❑ NO❑ INTALLED HAZARD TAG YES❑ NO❑
COPIES SENT TO:(1)CUSTOMER (2)ISSUER (3)AUTHORITY HAVING JURISDICTION (4)EQUIPMENT TAG
m