2009, 10-12 Permit Application: 09003239 Finish BasementProject Number: 09003239 Inv: I
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 10/12/2009 Page 1 of 2
Project Information:
Permit Use: FINISH BASEMENT
Setbacks: Front
Left: Right: Rear:
Site Information:
mom
Plat Key: 006127 Name: BECKERS RIDGE
Contact: ARMSTRONG, KENNETH R & VICKY L
Address: 2312 S BECKER LN
C - S - Z: VERADALE, WA 99037
Phone: (509) 927 -4434
Group Name:
Project Name:
District: East
Parcel Number: 45261.6002 Block:
SiteAddress: 2312 S BECKER LN
Location:: CSV
Lot: 2
Owner: Name: ARMSTRONG, KENNETH R & VIC
Address: 2312 S BECKER LN
VERADALE, WA 99037
Zoning: R -2 SF Res Suburban District
Water District: 010 VERA
Hold: ❑
Area 10,339 Sq Ft Width: 50 Depth: 111 Right Of Way (ft): 50
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Permits:
Released By:
Originally Released: 10/12/2009 By: tmelbourn
Contractor: OWNER
Building Permit
Firm: OWNER
Phone: (000) 000 -0000
This Application: Total Project:
Description Gtr Type Notes Sq Ft Valuation So Ft Valuation
BASEMENT F R-3 VB FINISH 0 $3,000.00 0 S3,000.00
BASEMENT
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 0 $3,000.00 0 $3,000.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Fee Amount
$83.25
$4.50
$33.30
Permit Total Fees: $121.05
Operator: JD Printed By: jmm Print Date: 10/12/2009
Project Number: 09003239 Inv: 1
Application
Date: 10/12/2009 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Contractor: OWNER
Plumbing Permit
Firm: OWNER
Phone: (000) 000 -0000
Item Description Units Unit Desc
TOILETS/BIDETS 1 NUMBER OF
SINKS 1 NUMBER OF
SHOWERS 1 NUMBER OF
Notes:
Payment Summary
Permit Type
Building Permit
Plumbing Permit
Fee Amount
$121.05
$18.00
$139.05
Fee Amount
$6.00
$6.00
$6.00
Permit Total Fees: $18.00
Invoice Amount
$121.05
$18.00
$139.05
Amount Paid
$33.30
$0.00
Amount Owing
$87.75
$18.00
$33.30 $105.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and /or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 10/12/2009
Spokane
jValley
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B -3
Spokane Valley, WA 99206
(509)688 -0036 FAX: (509)688 -0037
www.spokanevalley.org
PERMIT NUMBER:
PERMIT FEE:
New Construction
Addition/Remodel
Other:
Accessory Bldg
Deck
SITE ADDRESS: Z \ Z S .�lR
ASSESSORS PARCEL NO: AS 2 \ . QoOO2- LEGAL DESCRIPTION: ) c� Z.
Building Owner:
DIMENSIONS:
# OF STORIES:
Name: `, e,t,1 4 �)`t c-\(.4,1
/`024. 1 --,.�
Ow
Address: 7� 12
o_ V
Address:
City: 1(A�r,9 -Q
State: WA, Zip:
--/
Phone: cy.i 92".7 •
3� Fax: 2 _C-) OS
State:
Contact Person
Name:
Phone:
Describe the scope of work in detail:
►c ry �� i�ec tccm
Contractor:.
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
Name: �,g� vkE cv�
Ow
e
IMPERVIOUS SURFACE
AREA:
Address:
GARAGE SQ. FTG:
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
PROPERTY:
City:
CONSTRUCTION TYPE:
State:
Zip:
Phone:
Fax:
Contractor Lic No:
Exp Date:
City Business Lic. No:
Cost of Project: $ -_> coo ° ° o
_12 ocxitr\ c,t_olziolvvvki r1-1
Proposed Use:
* * * * * * * * * * * ** *The following MUST be complete: (write N/A if not applicable ) * * * * * * * * * * * * * * * * * * * * **
HEIGHT TO PEAT
n;
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
2"" FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
' .
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT
SQ. FTG: , 2) t e 0 V
GARAGE SQ. FTG:
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is /will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE:
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
❑ Check
❑ Mastercard
Expires:
DATE: I V C) RECEIVED
SV
PERMIT CENTER
El
VISA OCT 0 8
2009
Project # Ob _ z_
Name
Submittal #
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
❑ SITE PLAN
❑ Property lines and dimensions
❑ Direction arrow pointing North and orientation to streets
❑ Proposed /existing buildings (footprint and dimensions)
❑ Utilities, septic tank/drain field locations and distances
❑ Setbacks to property lines
❑ Distance between buildings
❑ Right of way /easement location & sizes
❑ Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
❑ Elevations (Front/Rear /Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawispace, basement or slab on grade):
❑ Footing sizes and locations
❑ Perimeter concrete foundation wall sizes
❑ Crawlspace ventilation
❑ Supporting wood cripple walls or beams
❑ Thickened concrete pads supporting
beams or girder trusses
❑ Floor Plan of each level (finished or unfinished) with dimensions:
❑ Floor Joist direction, size and spacing
❑ Header, beam or concrete lintel sizes
❑ Brace wall panel locations
❑ Water heater and furnace locations
❑ Exhaust fan locations
❑ Deck or concrete patio sizes and locations
❑ Roof Plan:
❑ Engineered truss direction and spacing
❑ Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
❑ Slope/ roofing material/ underlayment/ ice dam protection
❑ Sheathing size and type
Ceiling
❑ Joist size and spacing
Wall
❑ Height/ top plate/ stud size and spacing/ sole plate
❑ Exterior sheathing size and type
Floor
❑ Joist size and spacing
Foundation Wall
❑ Concrete or Masonry unit width
❑ Earth to wood separation distance
Footing
❑ Size
Radon
❑ Passive system with 6mil vapor barrier
Miscellaneous Construction Details
❑ Deck:
❑ Floor plan/ side view/ dimensions
❑ Floor Joist/ decking direction, size and spacing
❑ Stairway tread rise & run and nosing
❑ Window and door location and sizes
❑ Window well locations if applicable
❑ Room usage labels
❑ Smoke detector locations
❑ Attic and crawl space access locations
❑ Fire Wall construction
❑ Ridge, eave and valley lines
❑ Beam and girder size and location
❑ Truss or rafter size, spacing & connection
❑ Attic insulation/ air space baffle/ ventilation
❑ Size of ceiling gypsum wall board
❑ Siding/ exterior house wrap/ anchor bolts
❑ Insulation, vapor barrier, gypsum wall board
❑ Sheathing or concrete floor size/ insulation
❑ Footing bottom to finished ground level depth
❑ Horizontal & vertical reinforcement if any
❑ Reinforcement if any
❑ Active system with 6 mil vapor barrier
❑ Footings/ post/ and beam size and locations
❑ Handrail / Guard height & spacing
Si k
valley
Community Development
Permit Center
11703 E Sprague Ave, Suite B -3
Spokane Valley, WA 99206
(509)688 -0036 FAX: (509)688 -0037
www.spokanevallev.org.
Plumbing Permit Application n Commercial
PERMIT NUMBER:
PERMIT FEE:
Residential
SITE ADDRESS:
Building Owner
Name: , 1 1 1 n
kGn� r � `i L �I.LI ./4�+'1L�� ��
Phone:
� Z-% "ti�' � �--�
Fax:
�l Z -� 7 ��
Address: )..3 `Z ..6
City: s�p�r -=e �a Qua_
LA '
Zip: ct
toy -7
Contractor
Name:
Phone:
Fax:
Address:
City:
State:
Zip:
License No:
City Business Lic:
Contact
Name:
Phone:
DESCRIPTION OF WORK
# OF UNITS
X
COST
TOTAL AMOUNT
1
TOILETS
WATER CLOSET, BIDETS
X
$6.00
2
URINALS
X
$6.00
3
TUBS
X
$6.00
4
SHOWERS PER TRAP
5
SINKS
6
7
DISHWASHER
CLOTHES WASHER
BATH, STALL, ON -SITE BUILT
LAVS /BASINS, BAR, FLOOR, KITCHEN,
LAUNDRY, UTILITY, JANITOR, PHOTO,
X -RAY, FOOD, PREP /CULINARY MEAT
1
X
X
$6.00
$6.00
$6.00
X
$6.00
8
GARBAGE DISPOSAL
X
$6.00
9
WATER SOFTENER
X
$6.00
10
ELECTRIC WATER HEATER
11
12
13
FLOOR DRAINS
ROOF DRAINS /OVERFLOW DRAINS
FOUNTAINS, DRINKING
NOTE: IF GAS, SEE MECHANICAL
AREA, CASE, COIL, TRENCH,
CONDENSATE
X
$6.00
X
$6.00
X
$6.00
X
$6.00
14
15
16
17
WATER PIPING /DRAIN -IN WASTE,
VENT, PLUMBING, REVERSAL
SEWAGE EJECTOR
WATER USING DEVICE
CROSS CONNECTION DEVICE
NSTALLATION, ALTERATION, REPAIR,
REVERSALS
X
$6.00
GRINDER, SUMP PUMP
ICE AN /OR COFFEE MAKER, HOSE BIB,
STEAMER
PROOFER, CARBONATOR, SWAMP
COOLER
VACUUM BREAKER, CHECK VALVE,
AND R.P.B.P.D. FOR: VATS, TANKS,
BOILERS
18
INTERCEPTORS
GREASE TRAP, SAND TRAP,
CHEMICAL HOLDING TANK
19
MEDICAL GAS (per outlet)
NITROUS, OXYGEN
X
$6.00
$6.00
X
$6.00
$6.00
$6.00
20
MISCELLANEOUS PLUMBING FIXTURE
X
$6.00
21
PRIVATE SEWAGE DISPOSAUSYS
X
$20.00
22
INDUSTRIAL WASTE INTERCEPTOR
X
$15.00
METHOD OF PAYMENT:
['CASH ❑ CHECK ❑ VISA ❑ MC
Card#
AUTHORIZED SIGNATURE:
REVISED 8/26/05
EXPIRES:
VIN:
SUBTOTAL
PROCESSING FEE
TOTAL PERMIT FEE DUE:
$35.00
DELVED
CSV PERMIT CENTER
OCT 0 8 2009
Project #
Name
Submittal #
Spoke e
Valleyo
For City Use Only
PLUS Project Number
Project Address
11703 E Sprague Ave Suite B -3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 • permitcenter®spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
D Submit complete, accurate plans and documents.
Extra time may be required for re- submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
D Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre - Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick -up. Information regarding fees and pre - construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE - APPLICANT PINK - BUILDING FILE
REV 9/07