Loading...
2009, 09-18 Permit Application: 08003728 Deck RoofCITY OF 00" Spokane jV�lley Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B -3 Spokane Valley, WA 99206 (509)688 -0036 FAX: (509)688 -0037 www.spokanevalley.org PERMIT NUMBER: 31 PERMIT FEE: New Construction (� Addition/Remodel Other: Accessory Bldg Deck SITE ADDRESS: u- lo• C-sA ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: DIMENSIONS: I -'� a' # OF STORIES: N A Name: MAIN FLOOR TO SQ. FTG: Namel`c_eJJ Address: IMPERVIOUS SURFACE AREA: n' ri FINISHED BASEMENT SQ. FTG: Pi City: State: Address: Phone: 11-7 i G - ask' ;Mkt._.‘ Exp Date: City: I State: ice; ,� Zip: 9,i c. Phone: S '1, lc -7-1 Fax: Contact Person Name: D ��'1 r`1 Phone: Sur g=12 1e:1‘1 Describe the scope of work in detail: c� ^, Contractor: �4r►E DIMENSIONS: I -'� a' # OF STORIES: N A Name: MAIN FLOOR TO SQ. FTG: 2Nu FLOOR SQ. FTG: N Address: IMPERVIOUS SURFACE AREA: n' ri FINISHED BASEMENT SQ. FTG: Pi City: State: Zip: Phone: Fax: HEAT SOURCE: n c 1z Contractor Lic No: Exp Date: City Business Lic. No: Cost of Project: $ SbC u W P.. .� \\ cif Proposed Use: d2 cX * * * * * * * * * * * ** *The following MUST be complete: (write N/A if not applicable ) * * * * * * * * * * * * * * * * * * * * ** HEIGHT TO PEAK: aav DIMENSIONS: I -'� a' # OF STORIES: N A TOTAL HABITABLE SPACE: N A- MAIN FLOOR TO SQ. FTG: 2Nu FLOOR SQ. FTG: N UNFIN BASEMENT SQ. FTG: N IMPERVIOUS SURFACE AREA: n' ri FINISHED BASEMENT SQ. FTG: Pi GARAGE SQ. FTG: N A DECK/COV. PATIO SQ. FTG: 3,- 7 -1 s,; 30% SLOPES ON PROPERTY: AJ A # OF BEDROOMS: N A CONSTRUCTION TYPE: s4:.4.. I.-. -_ HEAT SOURCE: n c 1z SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is /will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: Method of Paymen ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 ❑ Check ❑ Mastercard Expires: DATE: 9 ❑ VISA VIN #: 15,g RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. ❑ SITE PLAN ❑ Property lines and dimensions ❑ Direction arrow pointing North and orientation to streets ❑ Proposed /existing buildings (footprint and dimensions) ❑ Utilities, septic tank/drain field locations and distances ❑ Setbacks to property lines ❑ Distance between buildings ❑ Right of way /easement location & sizes ❑ Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear /Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): ❑ Footing sizes and locations ❑ Perimeter concrete foundation wall sizes ❑ Crawlspace ventilation ❑ Supporting wood cripple walls or beams ❑ Thickened concrete pads supporting beams or girder trusses ❑ Floor Plan of each level (finished or unfinished) with dimensions: ❑ Floor Joist direction, size and spacing ❑ Header, beam or concrete lintel sizes ❑ Brace wall panel locations ❑ Water heater and furnace locations ❑ Exhaust fan locations ❑ Deck or concrete patio sizes and locations ❑ Roof Plan: ❑ Engineered truss direction and spacing ❑ Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof ❑ Slope/ roofing material/ underlayment/ ice dam protection ❑ Sheathing size and type Ceiling ❑ Joist size and spacing Wall ❑ Height/ top plate/ stud size and spacing/ sole plate ❑ Exterior sheathing size and type Floor ❑ Joist size and spacing Foundation Wall ❑ Concrete or Masonry unit width ❑ Earth to wood separation distance Footing ❑ Size Radon ❑ Passive system with 6mil vapor barrier Miscellaneous Construction Details ❑ Deck: ❑ Floor plan/ side view/ dimensions ❑ Floor Joist/ decking direction, size and spacing ❑ Stairway tread rise & run and nosing ❑ Window and door location and sizes ❑ Window well locations if applicable ❑ Room usage labels ❑ Smoke detector locations ❑ Attic and crawl space access locations ❑ Fire Wall construction ❑ Ridge, eave and valley lines ❑ Beam and girder size and location ❑ Truss or rafter size, spacing & connection ❑ Attic insulation/ air space baffle/ ventilation ❑ Size of ceiling gypsum wall board ❑ Siding/ exterior house wrap/ anchor bolts ❑ Insulation, vapor barrier, gypsum wall board ❑ Sheathing or concrete floor size/ insulation ❑ Footing bottom to finished ground level depth ❑ Horizontal & vertical reinforcement if any ❑ Reinforcement if any ❑ Active system with 6 mil vapor barrier ❑ Footings/ post/ and beam size and locations ❑ Handrail / Guard height & spacing Spokane Valley Site Address: 11710 E ALKI AVE Parcel Number: 45164.0293 Zoning: UR-3.5 Fire District: FD 01 Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 New proJey n Previous pre -app meeting —Q Plan revisions ❑ Transmittal Date: Friday, September 19, 2008 Water District: Project Number: 08003728 td Applicant: MCLEOD, DARRYL Ow LE D, DARRYL 11710 E ALKI AVE 10 E ALKI AVE SPOKANE VALLEY, WA 99206 S KANE VALLEY, WA 99206 (509) 892 -1024 e -mail: Contact: MCLEOD, DARRYL 11710 E ALKI AVE SPOKANE VALLEY, WA 99206 (509) 892 -1024 e -mail: Contractor: OWNER ( ) - 0 e- ail: Occupant: e -mail: Arch / Engineer: e -mail: Project ENCLOSE DECK Description: APPLICATION SITE PLAN PLANS ECEOWEn SEP 2 moos OL Please send all plan review and project comments via e-mail to the highlighted individuals. Spokane jUalley. For City Use Only PLUS Project Number CJ 7---;12% Project Address \fli v E 7\ 11703 E Sprague Ave Suite B -3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter @spokanevalley.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target d te. \ -Z-- ()% Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re- submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre - Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick -up. Information regarding fees and pre - construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE - APPLICANT PINK - BUILDING FILE REV 9/07 PL N ku* \s“' NING DEPT. APPR • ED PLANNING Dr BY: DATE: PLANNING DEPT. APPROVED DATE 7//ilme7 % N \,/ nto- E SV-to2,.4 j r. * 1Oie 1 tr 1 0. &C.' k . b, t+e. fkl C• As it 7, .,. s J 241 jeit �,.ryut 1 It lzcr. 0 V C_!t, 0overeS tea. 4. 4 •1 4 < r cif 4 ONO POST $ESIGNED FOR NEW HOME CONSTRUCTION •AIIitteel •Adjustable`•Easy To Install latt •Mfg. per B.O.C.A.'ICC :Standards • Refer to B.O.C.A./ICC Rep`ort'98.60 • Top Plate - M Series: 1 Pla le: 4 "x 6 ",3 Gauge Top Plate - B Series: I Plate. 4'9'x7 x3Gauge • Bottom Swivel Plate 1 Plate (Swivel/ 4 "x 6 "x 3 Gauge n Stock Size Specifications Model Number M -203* M -204 M -205 M -207 M -208 Adjustment Range 6'9 " -7'1" Safe Allowable Load 14,960 lbs. 7' 0" -T. —14,710 lbs. 7'3 "•7'7" 14,451 lbw: 7' 9" • IT 1" —13,908 Ibs. 8'0 " -8'4" 13,612 Ibs. ('May be special order in some stores) 2 Plates 1 Plate (Swivel) 4" x 6" x 3 Gauge, l Plate 4" x 6" x 3 Gauge 1 Tube 3" O.D., 11 Gauge (Also Available in 31/2" and 4" Diameter) 1 Screw 11/2" 0.D. 7 Pitch "V" Thread With 4" Adjustment 1 Nut 3" 0.0. Tapped for 11/2" 7 Pitch Thread $ Coating Corrosion Resistant Primer Scratch Tested to 200 Hrs., in Accordance with ASTMS -117 i Allowable Load . Refer to Current BOCA/ICC Report OSTE INDIVIDUAL' ISENADO PARA LA CONSTRUCCION DE CASAS NUEVAS •Todo de Acero •Ajustable • Facii de Instalar Placa Superior -Serie M: 1 placa: 4 "x 6 ", calibre 3 Placa Superior -Serie B: I place: 41/2"x 7'S" calibre 3 • Fabricado seg-n los est•ndares de B:O.C.A.IICC •Refierase al Informe 98.60 de BTC :A.I�ICC Placa Inferior Giratoria 1 placa (giralorla ): 4 "x 6 ", calibre Especificaciones de los Tamanos en Existencia Numero de Modelo M -203* M -204 M -205 M -207 M -208 Rango de Aiuste 2.06 - 2.16m. 2.13 - 2.24m. 2.21 - 2.31m. 2.36. 2.46m. 2.44. 2.51 m. Carga Segura Permisible 14,960 Ibs. 14,710 Ibs. 14,451 lbs. 13,908 Ibs. 13,612 lbs. *Puede ser la orden especial en algunos almacenes) 2 Placa: 1 placa (giratoria) de 4" x 6 ", calibre 3 y 1 placa de 4"1 6 ", calibre 3 1 Tuba 3" de diametro exterior, calibre 11 (tambien disponible con diametros de 31/2" y 4 ") 1 Tornillo 155° de diametro exterior. rosca en V de paso 7 con ajuste de 4" 1 Tuerca 3" de diametro exterior, rosca de paso 7 de 1'R' RecubrimientoPintura base anticorrosiva sometida a prueba de aranazos por 200 horas segun ASTMB -117 Carga PermislbleRefierase al informe actual de BOCA Approved by Lowe's I The Akron Products Company It( t <J (`2.) Z 3C 1 C 1-4 (ati� M t) z x ,u (N (2) i x Cn Min. 4 ft Brace Wall Panel per R602.10.3 & R602.10.4 Min. 2 ft 8 in. Alternate Brace Wall Panel per R602.10.6 Min. 16, 18 or 20 in. APA Portal Frame Bracing Engineered Shear Wall Bracing 1' � _ ! r7 1 9 1 r.) SY• 1 7 J N t* F-1 .!4 ..L.) F i J ) 6 , v. V 1 '4' t -; U u p' '. v t n ° _ J PI b V1 1 i' 1 ,rg e c s 1 'UM 1A J 80L ; s. T y T U n