2012, 05-03 Permit: BU12000330 Buildingr �•
cITYokane
p
Valley®
Permit Center
11703 E Sprague Ave Suite B3 Spokane Valley WA 99206
509.720 -5240 • Fax: 509.688.0037 • email: permitcenter @spokanevalley.org
BU- 12000330 BLD -COMM
PROJECT NAME: SUITE 101
SITE ADDRESS: 12509 E MISSION AVE SPOKANE VALLEY
ISSUED: 05/03/2012
EXPIRES: 05/03/2014
PARCEL: 45103.0258
APPLICANT: RAMEY CONSTRUCTION
5930 N FREYA
SPOKANE, WA 99217
509 - 483 -9000
GENERAL CONTRACTOR:
OWNER: RAMEY CONSTRUCTION
12509 E MISSION AVE
SPOKANE VALLEY, WA 99206
RAMEY CONSTRUCTION COMPANY INC
5930 N FREYA ST
SPOKANE, WA 99217
509 -483 -9000
License: RAMEYCC133D5
Expires: 10/14/2013
VALUATIONS:
Entered Valuation 210000.00 $210,000.00
Total:
$210,000.00
FEES: Paid Due
Building Permit $1,609.75 $0.00
Building Plan Review - General $1,046.34 $0.00
Washington State Building Code $4.50 $0.00
Council Surcharge
Plan Check and Review by the $80.00 $0.00
Bureau of Fire Prevention
Total Due: $0.00
Qty Mechanical Fixtures
FIXTURES
Qty Plumbing Fixtures
Qty Electrical Fixtures
REQUIRED INSPECTIONS
CONDITIONS
* Lighting Non Residential Energy Compliance (NREC) form due prior to framing inspection.
* 1. Revisions to the fire suppression system require a separate permit. (Permit received.)
2. Provide a copy of final testing and installation forms for Medical Gas System per NFPA 99.
Printed: 05 -03 -2012 13:55:43
Page 1 of 2
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the
property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permitee that the use described on
the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as
listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may
necessitate removal of certain parts of the construction are at the applicant's /permittee's or property owner's expense.
At a minimum, the following inspections ARE REQUIRED by the Spokane Valley Municipal Code (SVMC):
FOOTING - when forms and reinforcements are in place and prior to placement of concrete -all structures, including manufactured
homes.
NOTE: This inspection includes review of the structures setback from property lines. Minimum setbacks are established by SVMC.
Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback
provisions lies solely with the permitee- neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure.
Failure to properly locate the structure may require its relocation at the owner's /permittee's expense.
FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING - after rough -in, before covering and final.
MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment and final.
FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and
prior to concealing.
FINAL - when complete and prior to occupancy and /or use; all permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the
approved site plan) required by ordinance or as a condition of approval of this permit. Items such as installation of fire hydrants,
fire department access, on -site drainage (208' swales), road improvements, parking and landscaping are common requirements of
a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES - final inspection required when complete, stairs, handrails, skirting, etc. installed and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover
RIGHT -OF- WAY /APPROACH - prior to placement of concrete / asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc.,
must be inspected prior to cover. Check with the Building department for special inspections in conjunction with commercial projects.
State law RCW 19.122 requires that prior to any excavation the 'CALL BEFORE YOU DIG' center must be notified. Call 411 at least 3
working days in advance.
PERMIT EXPIRATION AND REFUNDS
Expirations:
Building or other permits (regulated under SVMC Chapter 24) shall expire by limitation and be declared void if a) work is not started
within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the
date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for
half the permit fee based on the value of the remainder of the work required to finish the original permit.
Right -of -way permits (regulated under SVMC Chapter 22) issued between April 1, and September 30, are valid for 30 days after the
date of issuance, with a one -time 30 -day extension available. Right -of -way permits issued between October 1, and March 31, shall be
valid until the following April 30.
Refunds:
All refund requests must be made in writing by the original permitee to the Building Official no later than 180 days after the date of fee
payment. Full refunds will be granted for any permit issued in error. Rate of refund shall be as set forth in the City of Spokane Valley
Master Fee Schedule in effect at the time of permit application. A copy of this schedule is available at Permit Center and also available
for reference on the city website at: http: / /www.spokanevalley.orq and search for "fees"
Owner /Agent Date: 3 ~
Staff Approval Date:
Spokane
jValleym
Permit Center
11703 E Sprague Ave Suite B3 Spokane Valley WA 99206
509.720 -5240 • Fax: 509.688.0037 ♦ email: permitcenter @spokanevalley.org
BU- 12000330
PROJECT NAME: SUITE 101
SITE ADDRESS: 12509 E MISSION AVE SPOKANE VALLEY
BLD -COMM
ISSUED: 05/03/2012
EXPIRES: 05/03/2014
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state /local law regulating construction or the performance of construction.
Issued By:
Contractor or Authorized Agent: Date:
Printed: 05 -03 -2012 13:55:43
Page 2of2
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the
property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permitee that the use described on
the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as
listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may
necessitate removal of certain parts of the construction are at the applicant's / permittee's or property owner's expense.
At a minimum, the following inspections ARE REQUIRED by the Spokane Valley Municipal Code (SVMC):
FOOTING - when forms and reinforcements are in place and prior to placement of concrete -all structures, including manufactured
homes.
NOTE: This inspection includes review of the structures setback from property lines. Minimum setbacks are established by SVMC.
Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback
provisions lies solely with the permitee- neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure.
Failure to properly locate the structure may require its relocation at the owner's /permittee's expense.
FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING - after rough -in, before covering and final.
MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment and final.
FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and
prior to concealing.
FINAL - when complete and prior to occupancy and /or use; all permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the
approved site plan) required by ordinance or as a condition of approval of this permit. Items such as installation of fire hydrants,
fire department access, on -site drainage (208' swales), road improvements, parking and landscaping are common requirements of
a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES - final inspection required when complete, stairs, handrails, skirting, etc. installed and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover
RIGHT -OF- WAY /APPROACH - prior to placement of concrete / asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc.,
must be inspected prior to cover. Check with the Building department for special inspections in conjunction with commercial projects.
State law RCW 19.122 requires that prior to any excavation the 'CALL BEFORE YOU DIG' center must be notified. Call 411 at least 3
working days in advance.
PERMIT EXPIRATION AND REFUNDS
Expirations:
Building or other permits (regulated under SVMC Chapter 24) shall expire by limitation and be declared void if a) work is not started
within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the
date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for
half the permit fee based on the value of the remainder of the work required to finish the original permit.
Right -of -way permits (regulated under SVMC Chapter 22) issued between April 1, and September 30, are valid for 30 days after the
date of issuance, with a one -time 30 -day extension available. Right -of -way permits issued between October 1, and March 31, shall be
valid until the following April 30.
Refunds:
All refund requests must be made in writing by the original permitee to the Building Official no later than 180 days after the date of fee
payment. Full refunds will be granted for any permit issued in error. Rate of refund shall be as set forth in the City of Spokane Valley
Master Fee Schedule in effect at the time of permit application. A copy of this schedule is available at Permit Center and also available
for reference on the city website at: http: / /www.spokanevalley.org and search for "fees"
Owner /Agent
Date: `j — 3
Staff Approval Date:
CITY OFD
Spokane
�Valley��
community Development Department
rmit Center
1703 East Sprague Avenue, Suite B -3
Spokane Valley, WA 99206
Tel: (509) 688 -0036
Fax: (509) 688 -0037
0ermitcenter (aspokanevallev.orq
(Staff Use Only)
�� -336
ERMIT NUMBER:
PERMIT FEE:
COMMERCIAL (NON- RESIDENTIAL) CONSTRUCTION PERMIT APPLICATION
NEW CONSTRUCTION E1 TENANT IMPROVEMENT 0 OTHER
SITE ADDRESS: Ia Ct e sS ci i 10 (
ASSESSORS PARCEL NO.: (-1sjn , Oz_56LEGAL DESCRIPTION:
BUILDING OWNER NAME: Rat CA /e
MAILING ADDRESS: 1 D 'Q o . '- g
CITY: c c c_ t o STATE: () A
CONTACT PERSON NAME: o 0 o, (e. /j- 1 1/c. . /4/,
PHONE:
FAx:
ZIP: 9 %003
CELL: S7- /53 -t,0
CONTRACTOR NAME: l�6__vv•Qy Co
Cc t V\C .
MAILING ADDRESS: .5-6)30 /V
CITY:
PHONE:
SPc lcc ne,.
— I a ad
STATE: W 4-
FAX:
50 `i-4 3 -90
ZIP: 1 9 /
CELL: 0 9— 9'39 -- 3 6.Q
CONTRACTOR LICENSE NO.: , vv1 1331 _ EXPIRES: /i l /i c) CITY BUSINESS LICENSE NO.: 1 O / - o6/46
ARCHITECT /COMPANY NAME: Sc ,k4 Nei"
MAILING ADDRESS: 3`0.
CITY: 5 eS
PHONE: /C/ 16301
STATE: k/,4 ZIP: .fr ZL >l (i
FAX:
•
CELL:
NAME OF OCCUPANT OF STRUCTURE: Ce>14
PHONE:
FAX:
716ry Iii l c r-f ioittod S44 -.5t y
CELL:
CONTACT PERSON NAME:
PHONE:
FAX:
CELL:
DESCRIBE THE SCOPE OF WORK IN DETAIL ' "'/ k',- CJvk FI,-c 4., 41 J%kvie ,044,105- e
TYPE OF PROJECT: y
TOTAL BUILDING Si F e UOU
HEAT SOURCE: t let
L f6+n Ce/I‘
FIRE SPRINKLERS:
PRIMARY OCCUPANCY:
S i FOOTAGE:
Ys
_ RECEIVED
SECONDARY OCCUPANCY: (j
SQ FOOTAGE:
ERNT CENTER
TOTAL COST OF PROJECT: $ Iv/ (Jv FED 15 2012
DISCLAIMER Project # /
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for constr £tion or on a dietttrrg --tFe tiag_ is /will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the prope 'tfv'Jr1L2..3)The•si f�"ato y is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to, be done in full compliance with the-City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spok6?i�Tf&l161Pe rn t_jenter. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances . — 6) Piansoitioal_
information may be required to be submitted and subsequently approved before this application can be processed.
Signature .Z
Date: ,)
Updated 1 -10 -2011
Page 1 of 1
Target Date sheet
For City Use Only
PLUS Project
Project Address
11703 E Sprague Ave Suite B -3 • Spokane Valley WA 99206
509.720 -5240 • Fax: 509.688.0037 • permitcenter @spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project application, we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
D Submit complete, accurate plans and documents.
Extra time may be required for re- submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
D Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
D Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your
target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre - Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick -up. Information regarding fees and pre - construction meetings (if required) will be provided by the Permit Specialist at
that time.
CD -003 V -7/ 06 -21 -11 Page 1 of 1