Loading...
2012, 02-14 Permit: 12000218 Repair Fire DamageSpokane flValley® Permit Center 11703 E Sprague Ave Suite B3 Spokane Valley WA 99206 509.720 -5240 • Fax: 509.688.0037 • email: permitcenter@spokanevalley.org Site Information Project Information Site Address: 12509 E MISSION AVE Parcel Number: 45103.0258 Subdivision: Block: Lot: Zoning: 0 Office District Owner: OGLE, RONALD C & SANDRA J Address: 12509 E MISSION SPOKANE VALLEY WA 99216 Building Inspector: NORTH Water Dist: MODERN Building Permit Project Number: 12000218 Inv: 1 Issue Date: 02/14/2012 Permit Use: FIRE DAMAGE REPAIR Applicant: RAMEY CONSTRUCTION 5930 N FREYA SPOKANE, WA 99217 Contact: RAMEY CONSTRUCTION 5930 N FREYA SPOKANE, WA 99217 Setbacks - Front: Left: Right: Group Name: Project Name: SUITE 201 Phone: (509) 483 -9000 Phone: (509) 483 -9000 Rear: Permits Contractor: RAMEY CONSTRUCTION COMPANY IN License #: RAMEYCCI33D5 FIRE DAMAGE B 11 -B REPAIR Total Value: $160,000.00 FOR BUILDING INSPECTIONS CALL (509) 688 -0054. 0 COMMERCIAL PERMIT FEE $1,329.75 COMMERCIAL PLANS REVIE $864.34 WSBCC SURCHARGE $4.50 OTHER FIRE REVIEW $80.00 Total Permit Fee: $2,278.59 Payment Summary Total Fees AmountPaid AmountOwing $2,278.59 $2,278.59 $0.00 Tran Date 01/31/2012 02/14/2012 Receipt # 29737 29852 Payment Amt $864.34 $1,414.25 Notes / Conditions of Approval A deferred submittal & approval is required for NREC review of Mechanical and Electrical. A deferred submittal & approval is required for mechanical ventilation design. Air flow design shall meet NREC and UMC Section 403 (Washington State Amendments). 1. The fire suppression system will require revisions to accommodate new walls. A separate permit is required. Processed By: DAVIS, JENNA Printed By: MORRIS, HEATHER Page 1 of 1 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permitee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removal of certain parts of the construction are at the applicant's / permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by the Spokane Valley Municipal Code (SVMC): FOOTING - when forms and reinforcements are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structures setback from property lines. Minimum setbacks are established by SVMC. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permitee- neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's /permittee's expense. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. PLUMBING - after rough -in, before covering and final. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment and final. FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL - when complete and prior to occupancy and /or use; all permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as installation of fire hydrants, fire department access, on -site drainage (208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES - final inspection required when complete, stairs, handrails, skirting, etc. installed and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover RIGHT -OF- WAY /APPROACH - prior to placement of concrete / asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the Building department for special inspections in conjunction with commercial projects. State law RCW 19.122 requires that prior to any excavation the `CALL BEFORE YOU DIG' center must be notified. Call 411 at least 3 working days in advance. PERMIT EXPIRATION AND REFUNDS Expirations: Building or other permits (regulated under SVMC Chapter 24) shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work required to finish the original permit. Right -of -way permits (regulated under SVMC Chapter 22) issued between April 1, and September 30, are valid for 30 days after the date of issuance, with a one -time 30 -day extension available. Right -of -way permits issued between October 1, and March 31, shall be valid until the following April 30. Refunds: All refund requests must be made in writing by the original permitee to the Building Official no later than 180 days after the date of fee payment. Full refunds will be granted for any permit issued in error. Rate of refund shall be as set forth in the City of Spokane Valley Master Fee Schedule in effect at the time of permit application. A copy of this schedule is available at Permit Center and also available for reference on the city website at: http: / /www.spokanevalley.orq and search for "fees" Owner /Agent / Date: , VII Staff Approval Date: Project Number: 12000218 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: FIRE DAMAGE REPAIR Contact: RAMEY CONSTRUCTION Address: 5930 N FREYA C - S - Z: SPOKANE, WA 99217 Setbacks: Front Left: Right: Rear: Phone: (509) 483 -9000 Group Name: Site Information: Project Name: SUITE 201 Plat Key: 000104 Name: ASSESSORS PLAT # 06 District: Nort Date: 2/10/2012 Page 1 of 2 Parcel Number: 45103.0258 Block: SiteAddress: 12509 E MISSION AVE Location:: CSV Zoning: 0 Office District Lot: Owner: Name: OGLE, RONALD C & SANDRA J Address: 12509 E MISSION SPOKANE VALLEY WA 99216 Water District: 011 MODERN Hold: ❑ Area: 60,291 Sq Ft Width: 346 Depth: 174 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Bldg Plan Review Released By: Fire District Review Permits: Originally Released: 2/10/2012 By: kjeffrey Released By: Originally Released: 2/8/2012 By: tharvey Operator: JD Printed By: MBB Print Date: 2/10/2012 Project Number: 12000218 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 2/10/2012 Page 2 of 2 Building Permit Contractor: RAMEY CONSTRUCTION Firm: RAMEY CONSTRUCTION COMPA Address: 5930 N FREYA ST Phone: (509) 483 -9000 SPOKANE, WA 99217 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation BUSINESS B II -B FIRE 0 $160,000.00 0 $160,000.00 DAMAGE REPAIR Item Description COMMERCIAL PERMIT FEE COMMERCIAL PLANS REVIEW WSBCC SURCHARGE OTHER FIRE REVIEW Totals: 0 $160,000.00 0 $160,000.00 Units Unit Desc Fee Amount 1 SELECT $1,329.75 1 SELECT $864.34 1 SELECT $4.50 1 SELECT $80.00 Permit Total Fees: $2,278.59 Notes: A deferred submittal & approval is required for NREC review of Mechanical and Electrical. A deferred submittal & approval is required for mechanical ventilation design. Air flow design shall meet NREC and UMC Section 403 (Washington State Amendments). No structural alteration are proposed. A structural evaluation of the building was conducted after fire. 1. The fire suppression system will require revisions to accommodate new walls. A separate permit is required. CALL TRACY ASAP WHEN REVISIONS COME IN!!! !T Payment Summary: Permit Type Building Permit Fee Amount $2,278.59 $2,278.59 Invoice Amount $2,278.59 $2,278.59 Amount Paid $864.34 $864.34 Amount Owing $1,414.25 $1,414.25 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and /or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: MBB Print Date: 2/10/2012 Community Development Department Permit Center 11703 East Sprague Avenue, Suite B -3 Spokane Valley, WA 99206 Tel: (509) 688 -0036 Fax: (509) 688 -0037 permitcenter@spokanevallev.org (Staff Use Only) PERMIT NUMBER: PERMIT FEE: CO SNAarille ii Ali E CIQLL (H OR\I- RIESIDENTIAL) CONSTRU1 CTI JEO L ° Ali ET A FIGMFON ❑ NEW CONSTRUCTION J TENANT IMPROVEMENT SITE ADDRESS: / a5 0K F. /1'1,JS ;(721 a 2O' ASSESSORS PARCEL NO.: LEGAL DESCRIPTION: BUILDING OWNER NAME: Qy(e MAILING ADDRESS: pa &)x t/ f SV IINFttottfitIENTER JAN 31 2012 I Project #_1.2 t Name .uumittkli r/ CITY: CONTACT PERSON NAME: /lice f, %s(- y 26 PHONE: 23r- 66/7 CONTRACTOR NAME: MAILING ADDRESS: CITY: PHONE: kfvfriA.T CO. 5�3O £ svq_ ye 3- STATE: l�/4 ZIP: FAX: CELL: C4-13— 6,2Q riefrei FAX: STATE: 14,/f. - q'a5;,2 ZYP: qt)(?_ / -/ CELL: �%l'! -3 cot CONTRACTOR LICENSE NO.: CC EXPIRES: // ,/ /a , CITY BUSINESS LICENSE NO.: ,60/_(Xj%-O !1S ARCHITECT /COMPANY_NAME A /4—( r MAILING ADDRESS: /0_03 (A ) CITY: ,_700 eC PHONE: cP36F-, d 2 L U STATE: FAX: e ,? (> f NAME OF OCCUPANT OF STRUCTURE: S%pde ,.P r,,t36 'f /j% PHONE: FAX: ZIP: 0.20/ CELL: CELL: CONTACT PERSON NAME: PHONE: FAX: CELL: DESCRIBE THE SCOPE OF WORK IN DETAIL Fra-me /-o Fc"t 4 TYPE OF PROJECT: Tr HEAT SOURCE: e/e 6rf- c PRIMARY OCCUPANCY: 4 SECONDARY OCCUPANCY: TOTAL COST OF PROJECT: $ 160('j-00 DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is /will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. R.e/°a p- dim art, 6 ' fe 4i/ / -e TOTAL BUILDING SQ FT: FIRE SPRINKLERS: vei' SQ FOOTAGE: fif 0-6O SQ FOOTAGE: t CIZ7T' Signature Date: / -3 (- o2p1� Updated 1 -10 -2011 Page 1 of 1