2012, 02-14 Permit: 12000218 Repair Fire DamageSpokane
flValley®
Permit Center
11703 E Sprague Ave Suite B3 Spokane Valley WA 99206
509.720 -5240 • Fax: 509.688.0037 • email: permitcenter@spokanevalley.org
Site Information
Project Information
Site Address: 12509 E MISSION AVE
Parcel Number: 45103.0258
Subdivision:
Block: Lot:
Zoning: 0 Office District
Owner: OGLE, RONALD C & SANDRA J
Address: 12509 E MISSION
SPOKANE VALLEY WA 99216
Building Inspector: NORTH
Water Dist: MODERN
Building Permit
Project Number: 12000218 Inv: 1 Issue Date: 02/14/2012
Permit Use: FIRE DAMAGE REPAIR
Applicant: RAMEY CONSTRUCTION
5930 N FREYA
SPOKANE, WA 99217
Contact: RAMEY CONSTRUCTION
5930 N FREYA
SPOKANE, WA 99217
Setbacks - Front:
Left: Right:
Group Name:
Project Name: SUITE 201
Phone: (509) 483 -9000
Phone: (509) 483 -9000
Rear:
Permits
Contractor: RAMEY CONSTRUCTION COMPANY IN License #: RAMEYCCI33D5
FIRE DAMAGE B 11 -B
REPAIR
Total Value: $160,000.00
FOR BUILDING INSPECTIONS CALL (509) 688 -0054.
0 COMMERCIAL PERMIT FEE $1,329.75
COMMERCIAL PLANS REVIE $864.34
WSBCC SURCHARGE $4.50
OTHER FIRE REVIEW $80.00
Total Permit Fee: $2,278.59
Payment Summary
Total Fees AmountPaid AmountOwing
$2,278.59 $2,278.59 $0.00
Tran Date
01/31/2012
02/14/2012
Receipt #
29737
29852
Payment Amt
$864.34
$1,414.25
Notes / Conditions of Approval
A deferred submittal & approval is required for NREC review of Mechanical and Electrical.
A deferred submittal & approval is required for mechanical ventilation design. Air flow design shall meet NREC and UMC
Section 403 (Washington State Amendments).
1. The fire suppression system will require revisions to accommodate new walls. A separate permit is required.
Processed By: DAVIS, JENNA
Printed By: MORRIS, HEATHER Page 1 of 1
PERMIT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the
property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permitee that the use described on
the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as
listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may
necessitate removal of certain parts of the construction are at the applicant's / permittee's or property owner's expense.
At a minimum, the following inspections ARE REQUIRED by the Spokane Valley Municipal Code (SVMC):
FOOTING - when forms and reinforcements are in place and prior to placement of concrete -all structures, including manufactured
homes.
NOTE: This inspection includes review of the structures setback from property lines. Minimum setbacks are established by SVMC.
Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback
provisions lies solely with the permitee- neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure.
Failure to properly locate the structure may require its relocation at the owner's /permittee's expense.
FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING - after rough -in, before covering and final.
MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment and final.
FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and
prior to concealing.
FINAL - when complete and prior to occupancy and /or use; all permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the
approved site plan) required by ordinance or as a condition of approval of this permit. Items such as installation of fire hydrants,
fire department access, on -site drainage (208' swales), road improvements, parking and landscaping are common requirements of
a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES - final inspection required when complete, stairs, handrails, skirting, etc. installed and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover
RIGHT -OF- WAY /APPROACH - prior to placement of concrete / asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc.,
must be inspected prior to cover. Check with the Building department for special inspections in conjunction with commercial projects.
State law RCW 19.122 requires that prior to any excavation the `CALL BEFORE YOU DIG' center must be notified. Call 411 at least 3
working days in advance.
PERMIT EXPIRATION AND REFUNDS
Expirations:
Building or other permits (regulated under SVMC Chapter 24) shall expire by limitation and be declared void if a) work is not started
within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the
date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for
half the permit fee based on the value of the remainder of the work required to finish the original permit.
Right -of -way permits (regulated under SVMC Chapter 22) issued between April 1, and September 30, are valid for 30 days after the
date of issuance, with a one -time 30 -day extension available. Right -of -way permits issued between October 1, and March 31, shall be
valid until the following April 30.
Refunds:
All refund requests must be made in writing by the original permitee to the Building Official no later than 180 days after the date of fee
payment. Full refunds will be granted for any permit issued in error. Rate of refund shall be as set forth in the City of Spokane Valley
Master Fee Schedule in effect at the time of permit application. A copy of this schedule is available at Permit Center and also available
for reference on the city website at: http: / /www.spokanevalley.orq and search for "fees"
Owner /Agent / Date: ,
VII
Staff Approval Date:
Project Number: 12000218 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: FIRE DAMAGE REPAIR Contact: RAMEY CONSTRUCTION
Address: 5930 N FREYA
C - S - Z: SPOKANE, WA 99217
Setbacks: Front Left: Right: Rear: Phone: (509) 483 -9000
Group Name:
Site Information:
Project Name: SUITE 201
Plat Key: 000104 Name: ASSESSORS PLAT # 06 District: Nort
Date: 2/10/2012 Page 1 of 2
Parcel Number: 45103.0258 Block:
SiteAddress: 12509 E MISSION AVE
Location:: CSV
Zoning: 0 Office District
Lot:
Owner: Name: OGLE, RONALD C & SANDRA J
Address: 12509 E MISSION
SPOKANE VALLEY WA 99216
Water District: 011 MODERN Hold: ❑
Area: 60,291 Sq Ft Width: 346 Depth: 174 Right Of Way (ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Review
Bldg Plan Review
Released By:
Fire District Review
Permits:
Originally Released: 2/10/2012 By: kjeffrey
Released By:
Originally Released: 2/8/2012 By: tharvey
Operator: JD Printed By: MBB
Print Date: 2/10/2012
Project Number: 12000218 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 2/10/2012 Page 2 of 2
Building Permit
Contractor: RAMEY CONSTRUCTION Firm: RAMEY CONSTRUCTION COMPA
Address: 5930 N FREYA ST Phone: (509) 483 -9000
SPOKANE, WA 99217
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
BUSINESS B II -B FIRE 0 $160,000.00 0 $160,000.00
DAMAGE
REPAIR
Item Description
COMMERCIAL PERMIT FEE
COMMERCIAL PLANS REVIEW
WSBCC SURCHARGE
OTHER FIRE REVIEW
Totals: 0 $160,000.00 0 $160,000.00
Units Unit Desc Fee Amount
1 SELECT $1,329.75
1 SELECT $864.34
1 SELECT $4.50
1 SELECT $80.00
Permit Total Fees: $2,278.59
Notes:
A deferred submittal & approval is required for NREC review of Mechanical and Electrical.
A deferred submittal & approval is required for mechanical ventilation design. Air flow design shall
meet NREC and UMC Section 403 (Washington State Amendments).
No structural alteration are proposed. A structural evaluation of the building was conducted after fire.
1. The fire suppression system will require revisions to accommodate new walls. A separate permit is
required.
CALL TRACY ASAP WHEN REVISIONS COME IN!!! !T
Payment Summary:
Permit Type
Building Permit
Fee Amount
$2,278.59
$2,278.59
Invoice Amount
$2,278.59
$2,278.59
Amount Paid
$864.34
$864.34
Amount Owing
$1,414.25
$1,414.25
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and /or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: MBB
Print Date: 2/10/2012
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B -3
Spokane Valley, WA 99206
Tel: (509) 688 -0036
Fax: (509) 688 -0037
permitcenter@spokanevallev.org
(Staff Use Only)
PERMIT NUMBER:
PERMIT FEE:
CO SNAarille
ii Ali E CIQLL (H OR\I- RIESIDENTIAL) CONSTRU1 CTI JEO L ° Ali ET A FIGMFON
❑ NEW CONSTRUCTION J TENANT IMPROVEMENT
SITE ADDRESS: / a5 0K F. /1'1,JS ;(721 a 2O'
ASSESSORS PARCEL NO.: LEGAL DESCRIPTION:
BUILDING OWNER NAME: Qy(e
MAILING ADDRESS: pa &)x t/ f
SV IINFttottfitIENTER
JAN 31 2012
I Project #_1.2
t Name
.uumittkli r/
CITY:
CONTACT PERSON NAME: /lice f, %s(- y 26
PHONE: 23r- 66/7
CONTRACTOR NAME:
MAILING ADDRESS:
CITY:
PHONE:
kfvfriA.T CO.
5�3O £
svq_ ye 3-
STATE: l�/4
ZIP:
FAX: CELL: C4-13— 6,2Q
riefrei
FAX:
STATE: 14,/f.
- q'a5;,2
ZYP: qt)(?_ / -/
CELL: �%l'! -3 cot
CONTRACTOR LICENSE NO.: CC EXPIRES: // ,/ /a , CITY BUSINESS LICENSE NO.: ,60/_(Xj%-O !1S
ARCHITECT /COMPANY_NAME A /4—( r
MAILING ADDRESS: /0_03 (A )
CITY: ,_700 eC
PHONE: cP36F-, d 2 L U
STATE:
FAX: e ,? (> f
NAME OF OCCUPANT OF STRUCTURE: S%pde ,.P r,,t36 'f /j%
PHONE:
FAX:
ZIP: 0.20/
CELL:
CELL:
CONTACT PERSON NAME:
PHONE:
FAX:
CELL:
DESCRIBE THE SCOPE OF WORK IN DETAIL
Fra-me /-o Fc"t 4
TYPE OF PROJECT: Tr
HEAT SOURCE: e/e 6rf- c
PRIMARY OCCUPANCY: 4
SECONDARY OCCUPANCY:
TOTAL COST OF PROJECT: $ 160('j-00
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is /will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
R.e/°a p- dim art, 6 ' fe 4i/ / -e
TOTAL BUILDING SQ FT:
FIRE SPRINKLERS: vei'
SQ FOOTAGE: fif 0-6O
SQ FOOTAGE:
t
CIZ7T'
Signature
Date: / -3 (- o2p1�
Updated 1 -10 -2011 Page 1 of 1