Loading...
2012, 03-14 Permit: SVFD-2012-0009 Sprinkler Supervision8filikane p Valle ° Y Permit Center 11703 E Sprague Ave Suite B3 Spokane Valley WA 99206 509.720 -5240 • Fax: 509.688.0037 • email: permitcenter @spokanevalley.org SVFD- 2012 -0009 PROJECT NAME: VALLEY MISSION PROFESSIONAL BUILDING SITE ADDRESS: 12509 E MISSION AVE SPOKANE VALLEY SVFD -ALARM ISSUED: 03/14/2012 EXPIRES: 09/10/2012 PARCEL: 45103.0258 APPLICANT: FIRE SYSTEMS WEST INC 933 N LAKE ST SPOKANE VALLEY, WA 99212 509 - 534 -5180 GENERAL CONTRACTOR: OWNER: OGLE, RONALD C & SANDRA J PO BOX 489 CHATTAROY, WA 99003 FIRE SYSTEMS WEST INC 933 N LAKE ST SPOKANE VALLEY, WA 99212 509 - 534 -5180 License: FIRESWI140B1 Expires: 10/13/2013 VALUATIONS: Total: FEES: Paid Due Sprinkler Supervision Only $95.00 $0.00 Fire District 1 Processing Fee $37.00 $0.00 Total Due: $0.00 Qty Mechanical Fixtures FIXTURES Qty Plumbing Fixtures Qty Electrical Fixtures REQUIRED INSPECTIONS Final Fire CONDITIONS * 1. Provide connection to tamper switch on PIV at street (future). Printed: 03 -14 -2012 13:15:59 Page 1 of 2 NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permitee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removal of certain parts of the construction are at the applicant's /permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by the Spokane Valley Municipal Code (SVMC): FOOTING - when forms and reinforcements are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structures setback from property lines. Minimum setbacks are established by SVMC. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permitee- neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's /permittee's expense. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. PLUMBING - after rough -in, before covering and final. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment and final. FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL - when complete and prior to occupancy and /or use; all permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as installation of fire hydrants, fire department access, on -site drainage (208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES - final inspection required when complete, stairs, handrails, skirting, etc. installed and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover RIGHT -OF- WAY /APPROACH - prior to placement of concrete / asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the Building department for special inspections in conjunction with commercial projects. State law RCW 19.122 requires that prior to any excavation the 'CALL BEFORE YOU DIG' center must be notified. Call 411 at least 3 working days in advance. PERMIT EXPIRATION AND REFUNDS Expirations: Building or other permits (regulated under SVMC Chapter 24) shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work required to finish the original permit. Right -of -way permits (regulated under SVMC Chapter 22) issued between April 1, and September 30, are valid for 30 days after the date of issuance, with a one -time 30 -day extension available. Right -of -way permits issued between October 1, and March 31, shall be valid until the following April 30. Refunds: All refund requests must be made in writing by the original permitee to the Building Official no later than 180 days after the date of fee payment. Full refunds will be granted for any permit issued in error. Rate of refund shall be as set forth in the City of Spokane Valley Master Fee Schedule in effect at the time of permit application. A copy of this schedule is available at Permit Center and also available for reference on the city website at: http: / /www.spokanevalley.orq and search for "fees" Owner /Agent Date: Staff Approval Date: CITY OF°' S p okane Valle ° y Permit Center 11703 E Sprague Ave Suite B3 Spokane Valley WA 99206 509.720 -5240 • Fax: 509.688.0037 • email: permitcenter @spokanevalley.org SVFD- 2012 -0009 PROJECT NAME: VALLEY MISSION PROFESSIONAL BUILDING SITE ADDRESS: 12509 E MISSION AVE SPOKANE VALLEY SVFD -ALARM ISSUED: 03/14/2012 EXPIRES: 09/10/2012 I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of Laws and Ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state /local law regulating construction or the performance of construction. Issued By: Contractor or Authorized Agent: Date: Printed: 03 -14 -2012 13:15:59 Page 2 of 2 NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permitee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removal of certain parts of the construction are at the applicant's /permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by the Spokane Valley Municipal Code (SVMC): FOOTING - when forms and reinforcements are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structures setback from property lines. Minimum setbacks are established by SVMC. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permitee- neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's /permittee's expense. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. PLUMBING - after rough -in, before covering and final. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment and final. FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL - when complete and prior to occupancy and /or use; all permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as installation of fire hydrants, fire department access, on -site drainage (208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES - final inspection required when complete, stairs, handrails, skirting, etc. installed and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover RIGHT -OF- WAY /APPROACH - prior to placement of concrete / asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the Building department for special inspections in conjunction with commercial projects. State law RCW 19.122 requires that prior to any excavation the 'CALL BEFORE YOU DIG' center must be notified. Call 411 at least 3 working days in advance. PERMIT EXPIRATION AND REFUNDS Expirations: Building or other permits (regulated under SVMC Chapter 24) shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work required to finish the original permit. Right -of -way permits (regulated under SVMC Chapter 22) issued between April 1, and September 30, are valid for 30 days after the date of issuance, with a one -time 30 -day extension available. Right -of -way permits issued between October 1, and March 31, shall be valid until the following April 30. Refunds: All refund requests must be made in writing by the original permitee to the Building Official no later than 180 days after the date of fee payment. Full refunds will be granted for any permit issued in error. Rate of refund shall be as set forth in the City of Spokane Valley Master Fee Schedule in effect at the time of permit application. A copy of this schedule is available at Permit Center and also available for reference on the city website at: http: / /www.spokanevalley.orq and search for "fees" Owner /Agent Date: "( z" Staff Approval Date: Spokane ValleyR Community Developm Permit Center 11703 East Sprague A Spokane Valley, WA 9 Tel: (509) 720 -5240 Fax: (509) 688 -0037 ermitcenter • ssokan nt DepartmpCEIVI enue, Suite B -3 206 'AAR 01 2 .• ; e Valley Pe (Stff Use Only) 1PERMIT NU BER: PE IT FEE mlit Center 5J D- 12-1 FIRE SAFETY PERMIT APPLICATION SITE ADDRESS:12509 E. MISSION AVE SPOKANE VALLEY, WASHINGTON 99216 ASSESSORS PARCEL NO.: LEGAL DESCRIPTION: BUILDING OWNER NAME:Valley Mission Professional Bldg MAILING ADDRESS:12509 E. MISSION AVE CITY:SPOKANE VALLEY Zxp:99216 STATE: WA CONTACT PERSON NAME:SCOTT FRY PHONE:509- 534 -5180 Fax:509- 534 -5221 CELL: CONTRACTOR NAME:FIRE SYSTEMS WEST MAILING ADDRESS:933 N. LAKE RD. CITY:SPOKANE STATE: WA ZIP:99212 PHONE:509- 534 -5180 CONTRACTOR LICENSE No.:FIREESWI055LW No.:01459 FAX:509- 534 -5221 CELL: EXPIRES:6 /16/13 CITY BUSINESS LICENSE NAME OF OCCUPANT OF STRUCTURE:6 DIRRERENT SPACES PHONE: FAX: CELL: CONTACT PERSON NAME: PHONE: FAX: CELL: FIRE SPRINKLERS: FIRE ALARM:YES TENT: DATE /TIME: ABOVE /UNDERGROUND STORAGE TANK SIZE: DESCRIBE THE SCOPE OF WORK IN DETAIL: INSTALATION OF A NEW FIRE ALARM PANEL FOR SPRINKLER MONITORING AND ELEVATOR RECALL NUMBER OF HEADS: PAINT BOOTH: BLASTING: OTHER: TOTAL COST OF PROJECT: $4,010.00 DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is /will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required ubmitted and sub -..-ntly approved before this application can be processed. Signature /"'"P Date: / /-6"<�� Updated 1 -11 -11 Page 1 of 1 C: \Documents and Settings \Scott Fry \Desktop \fire Alarm Permit Applications \Spokane Valley\Fire_Safety_Permit_1-11- 11.doc Fire Alarm System — New Installation Control Panel With Up to 4 Devices ($188.00) Control Panel With 5 to 100 Devices ($313.00) 7 Per Additional Groupings of 100 Devices ($63.00) Per Additional Panel ($50.00) Per Additional Floor ($50.00) Sprinkler Supervision System ($95.00) i ` Fire Alarm — Modifications to Existing System 1 to 5 New Devices (no battery calculations) ($40.00) 1 to 5 New Devices (with battery calculations) ($80.00) Additional 6 to 20 New Devices ($40.00) 20+ New Devices Refer to New Installation Control Panel Replacement (no device revisions) ($188.00) Sprinkler Supervision Panel Replacement (no device revisions) ($95.00) . rezs �l Total SPOKANE VALLEY FIRE DEPARTMENT Est. 1940 Mike Thompson, Fire Chief 10319 E. Sprague Avenue Spokane Valley, WA 99206 Phone (509) 928 -1700 FAX (509) 892 -4125 www.spokanevalleyfire.com March 8, 2012 Permit #: SVFD- 2012 -0009 Project Address: 12509 E. Mission Avenue Project Description: Sprinkler Monitoring & Elevator Recall Contractor: Fire Systems West 933 N. Lake Road Spokane, WA 99212 534 -5180 RE: Fire Alarm Shop Drawing Review Comments Attn: Scott Fry The Spokane Valley Fire Department has completed a review of the Fire Alarm shop drawing submittal for the above referenced project and approves the issuance of the permit with the following conditions: 1. Provide connection to tamper switch on PIV at street (future). Call 892 -4153 to schedule an inspection. Provide a minimum of 24 hours notice. If there are any questions please do not hesitate to call. Sincerely, i Ci� / ESC 1 Traci Harvey Fire Protection Engineer Spokane Valley Fire Department Cc Spokane Valley Permit Center Q: \Dept Data Unshared \Prevention Unshared \Building Files \M - Master Property \MISSION \Mission E 12509 \Mission E 12509 Monitoring -Fire Alarm.docx