SVFD- 2012 -0009
PROJECT NAME: VALLEY MISSION PROFESSIONAL BUILDING
SITE ADDRESS: 12509 E MISSION AVE SPOKANE VALLEY
SVFD -ALARM
ISSUED: 03/14/2012
EXPIRES: 09/10/2012
PARCEL: 45103.0258
APPLICANT: FIRE SYSTEMS WEST INC
933 N LAKE ST
SPOKANE VALLEY, WA 99212
509 - 534 -5180
GENERAL CONTRACTOR:
OWNER: OGLE, RONALD C & SANDRA J
PO BOX 489
CHATTAROY, WA 99003
FIRE SYSTEMS WEST INC
933 N LAKE ST
SPOKANE VALLEY, WA 99212
509 - 534 -5180
License: FIRESWI140B1
Expires: 10/13/2013
VALUATIONS:
Total:
FEES: Paid Due
Sprinkler Supervision Only $95.00 $0.00
Fire District 1 Processing Fee $37.00 $0.00
Total Due: $0.00
Qty Mechanical Fixtures
FIXTURES
Qty Plumbing Fixtures
Qty Electrical Fixtures
REQUIRED INSPECTIONS
Final Fire
CONDITIONS
* 1. Provide connection to tamper switch on PIV at street (future).
Printed: 03 -14 -2012 13:15:59
Page 1 of 2
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the
property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permitee that the use described on
the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as
listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may
necessitate removal of certain parts of the construction are at the applicant's /permittee's or property owner's expense.
At a minimum, the following inspections ARE REQUIRED by the Spokane Valley Municipal Code (SVMC):
FOOTING - when forms and reinforcements are in place and prior to placement of concrete -all structures, including manufactured
homes.
NOTE: This inspection includes review of the structures setback from property lines. Minimum setbacks are established by SVMC.
Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback
provisions lies solely with the permitee- neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure.
Failure to properly locate the structure may require its relocation at the owner's /permittee's expense.
FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING - after rough -in, before covering and final.
MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment and final.
FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and
prior to concealing.
FINAL - when complete and prior to occupancy and /or use; all permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the
approved site plan) required by ordinance or as a condition of approval of this permit. Items such as installation of fire hydrants,
fire department access, on -site drainage (208' swales), road improvements, parking and landscaping are common requirements of
a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES - final inspection required when complete, stairs, handrails, skirting, etc. installed and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover
RIGHT -OF- WAY /APPROACH - prior to placement of concrete / asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc.,
must be inspected prior to cover. Check with the Building department for special inspections in conjunction with commercial projects.
State law RCW 19.122 requires that prior to any excavation the 'CALL BEFORE YOU DIG' center must be notified. Call 411 at least 3
working days in advance.
PERMIT EXPIRATION AND REFUNDS
Expirations:
Building or other permits (regulated under SVMC Chapter 24) shall expire by limitation and be declared void if a) work is not started
within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the
date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for
half the permit fee based on the value of the remainder of the work required to finish the original permit.
Right -of -way permits (regulated under SVMC Chapter 22) issued between April 1, and September 30, are valid for 30 days after the
date of issuance, with a one -time 30 -day extension available. Right -of -way permits issued between October 1, and March 31, shall be
valid until the following April 30.
Refunds:
All refund requests must be made in writing by the original permitee to the Building Official no later than 180 days after the date of fee
payment. Full refunds will be granted for any permit issued in error. Rate of refund shall be as set forth in the City of Spokane Valley
Master Fee Schedule in effect at the time of permit application. A copy of this schedule is available at Permit Center and also available
for reference on the city website at: http: / /www.spokanevalley.orq and search for "fees"
Owner /Agent Date:
Staff Approval Date:
CITY OF°'
S p okane
Valle °
y
Permit Center
11703 E Sprague Ave Suite B3 Spokane Valley WA 99206
509.720 -5240 • Fax: 509.688.0037 • email: permitcenter @spokanevalley.org
SVFD- 2012 -0009
PROJECT NAME: VALLEY MISSION PROFESSIONAL BUILDING
SITE ADDRESS: 12509 E MISSION AVE SPOKANE VALLEY
SVFD -ALARM
ISSUED: 03/14/2012
EXPIRES: 09/10/2012
I hereby certify that I have read and examined this application and know the same to be true and correct.
All provisions of Laws and Ordinances governing this type of work will be complied with whether
specified herein or not. The granting of a permit does not presume to give authority to violate or cancel
the provisions of any other state /local law regulating construction or the performance of construction.
Issued By:
Contractor or Authorized Agent: Date:
Printed: 03 -14 -2012 13:15:59
Page 2 of 2
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the
property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permitee that the use described on
the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as
listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may
necessitate removal of certain parts of the construction are at the applicant's /permittee's or property owner's expense.
At a minimum, the following inspections ARE REQUIRED by the Spokane Valley Municipal Code (SVMC):
FOOTING - when forms and reinforcements are in place and prior to placement of concrete -all structures, including manufactured
homes.
NOTE: This inspection includes review of the structures setback from property lines. Minimum setbacks are established by SVMC.
Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback
provisions lies solely with the permitee- neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure.
Failure to properly locate the structure may require its relocation at the owner's /permittee's expense.
FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING - after rough -in, before covering and final.
MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment and final.
FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and
prior to concealing.
FINAL - when complete and prior to occupancy and /or use; all permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the
approved site plan) required by ordinance or as a condition of approval of this permit. Items such as installation of fire hydrants,
fire department access, on -site drainage (208' swales), road improvements, parking and landscaping are common requirements of
a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES - final inspection required when complete, stairs, handrails, skirting, etc. installed and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover
RIGHT -OF- WAY /APPROACH - prior to placement of concrete / asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc.,
must be inspected prior to cover. Check with the Building department for special inspections in conjunction with commercial projects.
State law RCW 19.122 requires that prior to any excavation the 'CALL BEFORE YOU DIG' center must be notified. Call 411 at least 3
working days in advance.
PERMIT EXPIRATION AND REFUNDS
Expirations:
Building or other permits (regulated under SVMC Chapter 24) shall expire by limitation and be declared void if a) work is not started
within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the
date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for
half the permit fee based on the value of the remainder of the work required to finish the original permit.
Right -of -way permits (regulated under SVMC Chapter 22) issued between April 1, and September 30, are valid for 30 days after the
date of issuance, with a one -time 30 -day extension available. Right -of -way permits issued between October 1, and March 31, shall be
valid until the following April 30.
Refunds:
All refund requests must be made in writing by the original permitee to the Building Official no later than 180 days after the date of fee
payment. Full refunds will be granted for any permit issued in error. Rate of refund shall be as set forth in the City of Spokane Valley
Master Fee Schedule in effect at the time of permit application. A copy of this schedule is available at Permit Center and also available
for reference on the city website at: http: / /www.spokanevalley.orq and search for "fees"
Owner /Agent Date: "( z"
Staff Approval Date:
Spokane
ValleyR
Community Developm
Permit Center
11703 East Sprague A
Spokane Valley, WA 9
Tel: (509) 720 -5240
Fax: (509) 688 -0037
ermitcenter • ssokan
nt DepartmpCEIVI
enue, Suite B -3
206 'AAR 01 2
.• ; e Valley Pe
(Stff Use Only)
1PERMIT NU BER:
PE IT FEE
mlit Center
5J D- 12-1
FIRE SAFETY PERMIT APPLICATION
SITE ADDRESS:12509 E. MISSION AVE SPOKANE VALLEY, WASHINGTON 99216
ASSESSORS PARCEL NO.: LEGAL DESCRIPTION:
BUILDING OWNER NAME:Valley Mission Professional Bldg
MAILING ADDRESS:12509 E. MISSION AVE
CITY:SPOKANE VALLEY
Zxp:99216
STATE: WA
CONTACT PERSON NAME:SCOTT FRY
PHONE:509- 534 -5180
Fax:509- 534 -5221
CELL:
CONTRACTOR NAME:FIRE SYSTEMS WEST
MAILING ADDRESS:933 N. LAKE RD.
CITY:SPOKANE
STATE: WA
ZIP:99212
PHONE:509- 534 -5180
CONTRACTOR LICENSE No.:FIREESWI055LW
No.:01459
FAX:509- 534 -5221
CELL:
EXPIRES:6 /16/13
CITY BUSINESS LICENSE
NAME OF OCCUPANT OF STRUCTURE:6 DIRRERENT SPACES
PHONE:
FAX:
CELL:
CONTACT PERSON NAME:
PHONE:
FAX:
CELL:
FIRE SPRINKLERS:
FIRE ALARM:YES
TENT:
DATE /TIME:
ABOVE /UNDERGROUND STORAGE TANK SIZE:
DESCRIBE THE SCOPE OF WORK IN DETAIL:
INSTALATION OF A NEW FIRE ALARM PANEL FOR SPRINKLER MONITORING AND ELEVATOR RECALL
NUMBER OF HEADS:
PAINT BOOTH:
BLASTING:
OTHER:
TOTAL COST OF PROJECT: $4,010.00
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is /will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required ubmitted and sub -..-ntly approved before this application can be processed.
Signature /"'"P Date: / /-6"<��
Updated 1 -11 -11 Page 1 of 1
C: \Documents and Settings \Scott Fry \Desktop \fire Alarm Permit Applications \Spokane Valley\Fire_Safety_Permit_1-11-
11.doc
Fire Alarm System — New Installation
Control Panel With Up to 4 Devices ($188.00)
Control Panel With 5 to 100 Devices ($313.00)
7
Per Additional Groupings of 100 Devices ($63.00)
Per Additional Panel ($50.00)
Per Additional Floor ($50.00)
Sprinkler Supervision System ($95.00)
i `
Fire Alarm — Modifications to Existing System
1 to 5 New Devices (no battery calculations) ($40.00)
1 to 5 New Devices (with battery calculations) ($80.00)
Additional 6 to 20 New Devices ($40.00)
20+ New Devices Refer to New Installation
Control Panel Replacement (no device revisions) ($188.00)
Sprinkler Supervision Panel Replacement (no device revisions)
($95.00)
.
rezs
�l
Total
SPOKANE VALLEY
FIRE DEPARTMENT
Est. 1940
Mike Thompson, Fire Chief
10319 E. Sprague Avenue
Spokane Valley, WA 99206
Phone (509) 928 -1700
FAX (509) 892 -4125
www.spokanevalleyfire.com
March 8, 2012
Permit #: SVFD- 2012 -0009
Project Address: 12509 E. Mission Avenue
Project Description: Sprinkler Monitoring & Elevator Recall
Contractor: Fire Systems West
933 N. Lake Road
Spokane, WA 99212
534 -5180
RE: Fire Alarm Shop Drawing Review Comments
Attn: Scott Fry
The Spokane Valley Fire Department has completed a review of the Fire Alarm shop drawing submittal
for the above referenced project and approves the issuance of the permit with the following conditions:
1. Provide connection to tamper switch on PIV at street (future).
Call 892 -4153 to schedule an inspection. Provide a minimum of 24 hours notice.
If there are any questions please do not hesitate to call.
Sincerely,
i Ci�
/ ESC 1
Traci Harvey
Fire Protection Engineer