2011, 12-12 Plan Review Summary: 11003710FILE
Commercial /Multi - Family Plan Review
Summary
Permit Center Out - Processing Information
PLUS Project #: 11003710
Project Name: Valley Mission Professional Bldg.
Phased Submittal: ❑ Yes .0 No
Site Address: 12509 E Mission
Project Description: Fire damage repair to existing medical office building — shell only.
Manual Valuation: ❑ Yes .0 No
Valuation: $ 600,000.00
Occupancy Group: Group B (Existing B -2
Occupancy based on existing certificate of
occupancy)
Type of Construction: II -B
Assembly Only (OL for room and room locat
on (each assembly room):
Floor Area
1st floor: 11,705 sq. ft.
Other floors (specify each floor sq. ft.):
2 nd 'Floor:. 11,101 sq. ft.
Conditions on Permit (list):
1. Pre - construction Meeting Required ❑ Yes .0 No
2. Special Inspections Required: ❑ Yes ' No
3. Project #11003710 is for fire damage repairs to the existing building shell -only and
existing public restroom accessible upgrade. Tenant build -out permits are required for
future tenant fire damage repairs.
4. Project #11003710 was reviewed under Chapter 5 Repairs, 2009 International
Existing Building Code.
5. Automatic sprinkler system is not required under the 1979 Uniform Building Code
that the building was constructed under. An Automatic sprinkler system is being
installed under Section 104.11 Alternate material, design and method of construction,
IBC. Refer to "Request for Building Official Consideration" in address file.
Other Technical Information
Code(s) used for review: 2009 Building Codes as adopted by Washington State
Occupancy Reviewed as: ' Single Occupancy ❑ Separated ❑ Non - separated
Phased Submittal: ❑ Yes .0 No
Occupant load (OL)
1st Floor: N/A (Shell -Only)
other floors (specify each floor occ. load):
Assembly Only (OL for room and room locat
on (each assembly room):
File Location:
Revised: February 12, 2010
Page 1 of 2
Plan Reviewer: Doug Powell
Date: 12/07/2011
File Location: Page 2 of 2
Revised: February 12, 2010
NREC Provided: N/A ❑ Envelope ❑ Mechanical ❑ Electrical /Lighting
Building Envelope Design (HB1848): ❑ Provided ' Not required
Plan Reviewer: Doug Powell
Date: 12/07/2011
File Location: Page 2 of 2
Revised: February 12, 2010
Doug Powell
From: Michael Spuler [Michael @rameyco.com]
Sent: Wednesday, December 07, 2011 9:40 AM
To: Doug Powell
Subject: Valley Mission Professional
Doug,
$600,000 is the number without the demo and fire sprinklers included. Thanks
Mike Spuler
Ramey Co.
office: 509- 483 -9000 cell: 509- 939 -3626
email: michael@rameyco.com
www.rameyco.com
SPOKANE VALLEY
FIRE DEPARTMENT
Est. 1940
Mike Thompson, Fire Chief
10319 E. Sprague Avenue
Spokane Valley, WA 99206
Phone (509) 928 -1700
FAX (509) 892 -4125
www.spokanevalleytire.com
December 6, 2011
Permit #: 11003710
Project Address: 12509 E. Mission Avenue
Project Description: Fire & Smoke Damage Repair — Valley Mission Professional Building
Applicant: Ramey Construction
5930 N. Freya
Spokane, WA 99217
michael @rameyco.com
RE: Permit Acceptance
The Spokane Valley Fire Department approves the issuance of the permit for the fire & smoke damage
repair for 12509 E. Mission Avenue (Valley Mission Professional Building).
For inspections call 928 -1700. Provide a minimum of 24 hours notice.
If there are any questions please do not hesitate to call.
Sincerely,
Traci Harvey
Fire Protection Engineer
Spokane Valley Fire Department.
Cc Spokane Valley Permit Center
Q: \Dept Data Unshared \Prevention Unshared \Building Files \M - Master Property \MISSION \Mission E 12509 \Mission E 12509 Fire