Loading...
2011, 12-12 Plan Review Summary: 11003710FILE Commercial /Multi - Family Plan Review Summary Permit Center Out - Processing Information PLUS Project #: 11003710 Project Name: Valley Mission Professional Bldg. Phased Submittal: ❑ Yes .0 No Site Address: 12509 E Mission Project Description: Fire damage repair to existing medical office building — shell only. Manual Valuation: ❑ Yes .0 No Valuation: $ 600,000.00 Occupancy Group: Group B (Existing B -2 Occupancy based on existing certificate of occupancy) Type of Construction: II -B Assembly Only (OL for room and room locat on (each assembly room): Floor Area 1st floor: 11,705 sq. ft. Other floors (specify each floor sq. ft.): 2 nd 'Floor:. 11,101 sq. ft. Conditions on Permit (list): 1. Pre - construction Meeting Required ❑ Yes .0 No 2. Special Inspections Required: ❑ Yes ' No 3. Project #11003710 is for fire damage repairs to the existing building shell -only and existing public restroom accessible upgrade. Tenant build -out permits are required for future tenant fire damage repairs. 4. Project #11003710 was reviewed under Chapter 5 Repairs, 2009 International Existing Building Code. 5. Automatic sprinkler system is not required under the 1979 Uniform Building Code that the building was constructed under. An Automatic sprinkler system is being installed under Section 104.11 Alternate material, design and method of construction, IBC. Refer to "Request for Building Official Consideration" in address file. Other Technical Information Code(s) used for review: 2009 Building Codes as adopted by Washington State Occupancy Reviewed as: ' Single Occupancy ❑ Separated ❑ Non - separated Phased Submittal: ❑ Yes .0 No Occupant load (OL) 1st Floor: N/A (Shell -Only) other floors (specify each floor occ. load): Assembly Only (OL for room and room locat on (each assembly room): File Location: Revised: February 12, 2010 Page 1 of 2 Plan Reviewer: Doug Powell Date: 12/07/2011 File Location: Page 2 of 2 Revised: February 12, 2010 NREC Provided: N/A ❑ Envelope ❑ Mechanical ❑ Electrical /Lighting Building Envelope Design (HB1848): ❑ Provided ' Not required Plan Reviewer: Doug Powell Date: 12/07/2011 File Location: Page 2 of 2 Revised: February 12, 2010 Doug Powell From: Michael Spuler [Michael @rameyco.com] Sent: Wednesday, December 07, 2011 9:40 AM To: Doug Powell Subject: Valley Mission Professional Doug, $600,000 is the number without the demo and fire sprinklers included. Thanks Mike Spuler Ramey Co. office: 509- 483 -9000 cell: 509- 939 -3626 email: michael@rameyco.com www.rameyco.com SPOKANE VALLEY FIRE DEPARTMENT Est. 1940 Mike Thompson, Fire Chief 10319 E. Sprague Avenue Spokane Valley, WA 99206 Phone (509) 928 -1700 FAX (509) 892 -4125 www.spokanevalleytire.com December 6, 2011 Permit #: 11003710 Project Address: 12509 E. Mission Avenue Project Description: Fire & Smoke Damage Repair — Valley Mission Professional Building Applicant: Ramey Construction 5930 N. Freya Spokane, WA 99217 michael @rameyco.com RE: Permit Acceptance The Spokane Valley Fire Department approves the issuance of the permit for the fire & smoke damage repair for 12509 E. Mission Avenue (Valley Mission Professional Building). For inspections call 928 -1700. Provide a minimum of 24 hours notice. If there are any questions please do not hesitate to call. Sincerely, Traci Harvey Fire Protection Engineer Spokane Valley Fire Department. Cc Spokane Valley Permit Center Q: \Dept Data Unshared \Prevention Unshared \Building Files \M - Master Property \MISSION \Mission E 12509 \Mission E 12509 Fire Repair Permit Acceptance.docx