Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2011, 11-23 Permit: 11003678 Smoke Damage Repair
1 Spa„okane Valleye 1 Permit Center 11703 E Sprague Ave Suite B3 Spokane Valley WA 99206 509.720 -5240 • Fax: 509.688.0037 • email: permitcenter @spokanevalley.org Site Information Project Information Site Address: 12509 E MISSION AVE Parcel Number: 45103.0258 Subdivision: Block: Lot: Zoning: 0 Office District Owner: OGLE, RONALD C & SANDRA J Address: 12509 E MISSION SPOKANE VALLEY WA 99216 Building Inspector: NORTH Water Dist: MODERN Project Number: 11003678 Inv: 1 Issue Date: 11/23/2011 Permit Use: EPR - TI - DENTAL PROFFESSIONAL REPAIR SMOKE DAMAGE Applicant: RAMEY CONSTRUCTION 5930 N FREYA SPOKANE, WA 99217 Contact: RAMEY CONSTRUCTION 5930 N FREYA SPOKANE, WA 99217 Setbacks - Front: Left: Right: Phone: (509) 483 -9000 Phone: (509) 483 -9000 Rear: Group Name: Project Name: EPR - 11/23/11 8:30am SUITE 203 - CONLON DENTAL Permits Buildittz Permit Group: B Contractor: RAMEY CONSTRUCTION COMPANY IN License #: RAMEYCC133D5 Type: II -B Total Area 1500 MEDICAL BLDG B Total Value: FOR BUILDING INSPECTIONS CALL (509) 688 -0054. VB $60,000.00 0 COMMERCIAL PERMIT FEE COMMERCIAL PLANS REVIE WSBCC SURCHARGE EXPRESS PERMIT REVIEW $713.75 $463.94 $4.50 $61.00 Total Permit Fee: $1,243.19 Mechanical Permit Contractor: RAMEY CONSTRUCTION COMPANY IN License #: RAMEYCC133D5 DUCT WORK SYSTEM 1 $11.00 GAS APPLIANCE< =100,000BT GAS PIPING 1 $1.00 FOR MECHANICAL INSPECTIONS CALL (509) 688 -0054. Total Permit Fee: 1 $13.00 $25.00 Payment Summary Total Fees AmountPaid AmountOwing $1,268.19 $1,268.19 $0.00 Tran Date 11/18/2011 11/23/2011 Receipt # 29164 29204 Payment Amt $524.94 $743.25 Notes / Conditions of Approval Plumbing and mechancial permits are required for alterations or additions to the existing systems. Deferred Submittals: NREC third party review and completed compliance forms for the mechanical and lighting systems must be submitted for review and approval pror to framing inspection. Processed By: BONDURANT, MICK Printed By: MORRIS, HEATHER Page 1 of 1 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permitee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may necessitate removal of certain parts of the construction are at the applicant's / permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by the Spokane Valley Municipal Code (SVMC): FOOTING - when forms and reinforcements are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structures setback from property lines. Minimum setbacks are established by SVMC. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permitee- neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's /permittee's expense. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. PLUMBING - after rough -in, before covering and final. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment and final. FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL - when complete and prior to occupancy and /or use; all permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as installation of fire hydrants, fire department access, on -site drainage (208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES - final inspection required when complete, stairs, handrails, skirting, etc. installed and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover RIGHT -OF- WAY /APPROACH - prior to placement of concrete / asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the Building department for special inspections in conjunction with commercial projects. State law RCW 19.122 requires that prior to any excavation the `CALL BEFORE YOU DIG' center must be notified. Call 411 at least 3 working days in advance. PERMIT EXPIRATION AND REFUNDS Expirations: Building or other permits (regulated under SVMC Chapter 24) shall expire by limitation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work required to finish the original permit. Right -of -way permits (regulated under SVMC Chapter 22) issued between April 1, and September 30, are valid for 30 days after the date of issuance, with a one -time 30 -day extension available. Right -of -way permits issued between October 1, and March 31, shall be valid until the following April 30. Refunds: All refund requests must be made in writing by the original permitee to the Building Official no later than 180 days after the date of fee payment. Full refunds will be granted for any permit issued in error. Rate of refund shall be as set forth in the City of Spokane Valley Master Fee Schedule in effect at the time of permit application. A copy of this schedule is available at Permit Center and also available for reference on the city website at: http: / /www.spokanevalley.orl and search for "fees" Owner /Agent � Date: // ( Staff Approval Date: Project Number: 11003678 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 11/18/2011 Page 1 of 2 Project Information: Permit Use: EPR - TI - DENTAL PROFFESSIONAL REPAIR SMOKE DAMAGE Setbacks: Front Site Information: Left Right: Rear: Contact: RAMEY CONSTRUCTION Address: 5930 N FREYA C - S - Z: SPOKANE, WA 99217 Phone: (509) 483 -9000 Group Name: Project Name: EPR - TI - DENTAL /PROFESSIONAL REPAIR SMOKE DAMAGE Plat Key: 000104 Name: ASSESSORS PLAT # 06 District: Nort Parcel Number: 45103.0258 Block: SiteAddress: 12509 E MISSION AVE Location:: CSV Zoning: 0 Office District Water District: 011 MODERN Lot: Owner: Name: OGLE, RONALD C & SANDRA J Address: 12509 E MISSION SPOKANE VALLEY WA 99216 Hold: ❑ Area: 60,291 Sq Ft Width: 346 Depth: 174 Right Of Way (ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Bldg Plan Review Released By: Fire District Review Released By Land Use Review Permits: Released By: Operator: MBB Printed By: MBB Print Date: 11/18/2011 Project Number: 11003678 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 11/18/2011 Page 2 of 2 Building Permit Contractor: RAMEY CONSTRUCTION Firm: RAMEY CONSTRUCTION COMPA Address: 5930 N FREYA ST Phone: (509) 483 -9000 SPOKANE, WA 99217 This Application: Total Project: Description Grp kpe Notes Sq Ft Valuation Sq Ft Valuation BUSINESS B VB MEDICAL 0 $60,000.00 0 $60,000.00 BLDG Item Description COMMERCIAL PERMIT FEE COMMERCIAL PLANS REVIEW WSBCC SURCHARGE EXPRESS PERMIT REVIEW Notes: Totals: 0 $60,000.00 0 $60,000.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT 1 SELECT Fee Amount $713.75 $463.94 $4.50 $61.00 Permit Total Fees: $1,243.19 Payment Summary: =. Permit Type Building Permit Fee Amount Invoice Amount Amount Paid Amount Owing $1,243.19 $1,243.19 $524.94 $718.25 $1,243.19 $1,243.19 $524.94 $718.25 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and /or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: MBB Printed By: MBB Print Date: 11/18/2011 Spokane . Valley Community Development Department Permit Center 11703 East Sprague Avenue, Suite B -3 Spokane Valley, WA 99206 Tel: (509) 688 -0036 Fax: (509) 688 -0037 permitcenter @spokanevalley.orq (Staff Use Only /) PERMIT NUMBER: / 1 _ 3t6 78 PERMIT FEE: COMMERCIAL (NON- RESIDENTIAL) CONSTRUCTION PERMIT APPLICATION NEW CONSTRUCTION g TENANT IMPROVEMENT SITE ADDRESS: /a5C)o( e • nisS° Cn"1 G,v StJ f e_ 02 03 0 OTHER ASSESSORS PARCEL NO.: /5y0 - z_ LEGAL DESCRIPTION: BUILDING OWNER NAME: Ro-y. 04 k MAILING ADDRESS: P D a o X `-/ g CITY: C \ c e- e �/ CONTACT PERSON NAME: Ro V\ O q I e, PHONE: ,r9 („ 17 STATE: 0-) ZIP: 9 ya 03 FAX: CELL: S %- 5 3- / LD CONTRACTOR NAME: Ro_vwejt Co y,s ±c, IC C0 INC. MAILING ADDRESS: c730 N FcEy� CITY: Sri k_6._ PHONE: 60G —Ve3 - 90 Otd FAX: STATE: (.t) 4- C© - `43 -90� ZIP:. 9-9 / 7 CELL: .570- 9- 39- CONTRACTOR LICENSE No.: E? 4/1 .,/cc, 133 '3 . EXPIRES: 0// /I CITY BUSINESS LICENSE NO.: 10 / - 067-k, ARCHITECT /COMPANY NAME: ,S01,`4/11 Wpy/ry .OS MAILING ADDRESS: 3 %0 / J hie-my (RcQ, Grceriac,res CITY: STATE: W4 ZIP: g7o/6 PHONE: 5C7- 7i Y- 63°1 FAX: CELL: NAME OF OCCUPANT OF STRUCTURE: PHONE: Sod - clac' -6Y`/ CONTACT PERSON NAME: TOM ( 4,M PHONE: 7Cj- 6933 FAX: CELL: Scx . q7 !3J FAX: CELL: DESCRIBE THE SCOPE OF WORK IN I i U c 1-(,wr/ it.5 4Ce. ( ‘S/ Cfr��at ( TYPE OF PROJECT: 14.11 4 F( r, lIUAC Act', Ce bt TOTAL BUILDING S FT:, . HEAT SOURCE: %/ / FIRE SPRINKLERS: yes SQ OF SPOKANE VALLEY F� ��f PRIMARY OCCUPANCY: Q L-,L SQ FOOTAGE: NOV + f 2011 SECONDARY OCCUPANCY: SQ FOOTAGE: TOTAL COST OF PROJECT: $ 6D k t'LRMI I C;ENI tK DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is /will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature j 2eL, Date: 11_4) _ j Updated 1 -10 -2011 Page 1 of 1 Spr�1 ' Walley• CoMmunity Development 11703 E Sprague Ave, Suite B -3 Spokane Valley, WA 99206 (509)688 -0036 FAX: (509)688 -0037 permitcenter(a sookanevalley.org Mechanical Permit Application Commercial PERMIT NUMBER: / '36 7g PERMIT FEE: Residential SITE ADDRESS: j �J(� f( L- /111c» Building Owner Name: ge1 Address: p o n- Y (rq Contractor Phone: 622‘._ C 7 Fax: City: C. / c, State: I v Name: / p, _ C-4( Address: c 2 ,// Fr License No: R 4 Ai rcc 133 t 5 Contact/Project Manager: Phone: ((G - City: Fax: e� State: 14/4 City Business Lic: 6oi _ i I , f'6 J Zip: c -NR17 Name: /1 c Phone: cf _ 36� i #UNITS FURNACES & SUSPENDED HEATERS - INSTALLATION OR RELOCATION Up to & including 100,000 BTU ;1, FURNACES & SUSPENDED HEATERS - INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM y.�s HEAT PUMP /AIR CONDITIONER 0 -3 TON AIR CONDITIONER Over 3 -15 TON AIR CONDITIONER Over 15 -30 TON AIR CONDITIONER Over 30 -50 TON AIR CONDITIONER Over 50 TON GAS WATER HEATER GAS PIPING SYSTEM (each outlet) GAS LOG, FIREPLACE, & GAS INSERT APPLIANCE VENTS INSTALLATION, RELOCATION, REPLACEMENT REPAIRS OR ADDITIONS BOILER, COMPRESSORS, ABSORPTIONS SYSTEM 0 to 3 hp- 100,000 BTU or less BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 3 -15 hp — 100,001 to 500,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 15 — 30 hp - 500,001 to 1,000,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 30 hp — 1,000,001 to 1,750,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 50 hp — over 1,750,000 BTU AIR HANDLER (DOES NOT include ducting) Each unit up to 10,000 cfm, including ducts AIR HANDLER (DOES NOT include ducting) Each unit over 10,000 cfm EVAPORATIVE COOLERS(otherthan portables) VENTILATION AND EXHAUST Each fan connected to a singe duct VENTILATION AND EXHAUST Each ventilation system VENTILATION AND EXHAUST Each hood served by mechanical exhaust INCINERATORS Installation or relocation of residential INCINERATORS Installation or relocation of commercial APPLIANCES Range, Clothes Washer UNLISTED APPLIANCES Under 400,000 BTU UNLISTED APPLIANCES Over 400,000 BTU HOOD Type I HOOD Type II L P STORAGE TANK WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM — FREE STANDING ❑CASH ❑ CHECK ❑ VISA ❑ MC CARD #: EXPIRES: SIGNATURE IN: • CITY OF SPOKANIF VAI -LEY NOV 18 2011 c� BY1 ��'�/� MIT �;ttv I d='e�.=X. http : / /www.spokanevalley.org/uploads /Community Development/Documents/ Forms / Building/ MechanicalPermitApplication040309 .doc