14-012.00 Centurylink CorporationMEMORANDUM OF UNDERSTANDING BETWEEN THE CITY OF SPOKANE VALLEY AND CENTURYLINK CORPORATION FOR THE INSTALLATION OF COMMUNICATIONS CONDUITS AS PART OF THE CONSTRUCTION OF THE SULLIVAN ROAD WEST BRIDGE REPLACEMENT PROJECT THIS MEMORANDUM OF UNDERSTANDING (MOU) is between the City of Spokane Valley (the City) and CenturyLink Corporation (CenturyLink). The City and CenturyLink are sometimes referred to individually as a "Party" and collectively as the "Parties." Background and Purpose. As part of its Transportation Improvement Program, the City intends to construct the Sullivan Road West Bridge Replacement Project ( "Bridge Project ") over the Spokane River, which includes removing the existing southbound Sullivan bridge ( "SB Bridge ") and constructing a wider bridge at the same location. The Bridge Project also includes modifying the existing northbound Sullivan bridge ( "NB Bridge ") to provide for the re- routing of utilities and the temporary diversion of traffic and pedestrians. The City anticipates opening bids and beginning construction for the Bridge Project in 2014. CenturyLink currently has overhead fiber optic cables on the west side of the SB Bridge, which physically interfere with the Bridge Project. CenturyLink has agreed to relocate its cables across the Spokane River in one six -inch diameter fiberglass conduit on the existing NB Bridge. The conduit will be shared with Zayo Group, LLC. To accommodate the conduit, work to install trapeze hangers and drill holes through the concrete pier caps was performed as part of the City's Sullivan Road Bridge Drain Retrofit Project (CIP 0150). A prior MOU between CenturyLink and the City, executed on July 1, 2013 and amended on October 9, 2013 defined responsibilities and allocated costs for the NB Bridge hanger and drilling work. The Parties have determined additional work to be conducted on the NB Bridge related to the conduit installation. The Parties desire to provide for core drilling of the NB Bridge end abutment walls, installation of additional hanger support bracing, and installation of the fiberglass conduit and related appurtenances as part of the City's Bridge Project. The NB Bridge conduit - related work is referred to herein as the "Conduit Project ". The purpose of this MOU is to define the responsibilities of the Parties and allocate the costs of the Conduit Project, which include the design and construction of the conduit systems, between the Parties. NOW THEREFORE, the City and CenturyLink do hereby agree as follows: ARTICLE 1— RESPONSIBILITIES OF THE CITY The City or its consultants /contractors shall: 1.1 Develop the plans and specifications for the Bridge Project, including plans and specifications for the Conduit Project. Page 1 of 6 1.2 Place bid items associated with construction of the Conduit Project in a separate bid schedule ( "Schedule E - Utilities Bid Schedule ") for the following work: a. Core drilling of the NB Bridge abutment diaphragm walls, furnishing and installing additional support braces, and including excavation and backfill. b. Furnishing and installing the six -inch fiberglass conduit and associated appurtenances to 10 feet outside of the bridge abutments. 1.3 Review the Bridge Project bids and select the bidder with the lowest responsible bid for the entire project. 1.4 Upon awarding a contract for the Bridge Project, be fully responsible for the construction contract and shall be the administrator for the Bridge Project. 1.5 In the City's design for the construction of the NB Bridge modifications: a. Provide circular core holes at the abutment diaphragm walls, as detailed on the City's approved Bridge Project drawings and specifications; and b. Provide design for conduit hanger support system based on load information provided by CenturyLink's Representative; and c. Provide specifications for Conduit Project materials and construction requirements. 1.6 Provide core drilled holes in the NB Bridge abutment diaphragm walls. Furnish and install conduit support braces. Furnish and install one six -inch diameter fiberglass power conduit and associated expansion couplings under the NB Bridge on existing support hangers continuously through the abutments and 10 feet outside of both the north and south ends of the NB Bridge along with related excavation and backfill. 1.7 Notify CenturyLink when portions of the Bridge Project have been completed by its contractor requisite for CenturyLink to perform work described in Article 2. Such notice shall be at least 14 consecutive calendar days prior to needing any work performed by CenturyLink. 1.8 Ensure CenturyLink has access to the NB Bridge and approaches at appropriate times to perform its responsibilities. The City shall provide for a specific period of time in the Bridge Project specifications for CenturyLink to perform work described in Article 2 as follows: Phase 1B — Thirty consecutive calendar days upon notification by the City. Page 2 of 6 ARTICLE 2 — RESPONSIBILITIES OF CENTURYLINK CenturyLink shall: 2.1 Provide the City with all conduit deadload, liveload and dimensional information necessary to design the hanger support systems. 2.2 Upon notification from the City and within the time period described in Section 1.8, complete work as shown on the City's approved Bridge Project drawings and in coordination with the Bridge Project construction phases as follows: Phase 1B: Furnish and install one six -inch buried conduit and connections with bridge - supported conduit within 10 feet of the north and south abutments of the NB Bridge, including associated excavation, backfill, compaction, pavement and sidewalk restoration and traffic control. Furnish and install fiber optic cable through the conduit across the NB Bridge and adjoining buried conduit system. Modify overhead facilities north of Flora Pit Road along the east side of and across Sullivan Road. Remove existing overhead fiber optic cable and facilities west of the SB Bridge. 2.3 CenturyLink shall complete the work specified in Section 2.2 and provide notification of such completion to the City within the allotted time period shown in Section 1.8. 2.4 Be responsible for inspecting and testing of the work and materials described above. CenturyLink shall perform backfill compaction tests and submit test reports to City at least 24 hours prior to placing asphalt pavement. 2.5 Obtain any necessary permits from the City to perform the work described above which is located within the City's rights -of -way. ARTICLE 3 — ALLOCATION OF COSTS 3.1 CenturyLink shall, within 30 days of invoice from the City, compensate the City for costs associated with the Conduit Project, including the cost of the consultant design, the Conduit Project - related bid items in Schedule E - Utilities Bid Schedule, applicable mobilization and sales tax, and associated change orders, if any, in an amount not to exceed $26,315.06 without the prior written approval of CenturyLink's representative. CenturyLink shall compensate the City for costs above $26,315.06 only with prior written approval of CenturyLink's representative, which approval shall not be unreasonably withheld. Costs shall include the following distribution of Conduit Project - related bid items: a. One quarter of the NB Bridge abutment core drilling, support braces, excavation and backfill costs; and b. One half of the NB Bridge- supported six -inch fiberglass communications conduit costs. Page 3 of 6 3.2 The probable cost of the Conduit Project shall be estimated by the City's consultant, broken out by bid item, including applicable sales tax, consultant design cost, mobilization, and a 15% contingency. The mobilization and consultant design costs shall each be established as 10% of the bid item value, excluding applicable sales tax and contingency. CenturyLink shall provide cash, a letter of credit, or other appropriate financial instrument acceptable to the City with a signed copy of this MOU, giving the City a unilateral right to access funds up to the "Estimate of Probable Cost" amount. 3.3 The City and CenturyLink acknowledge that the Estimate of Probable Cost of the Conduit Project is for planning purposes, and that the final cost shall be based upon final quantities, awarded unit bid item prices, mobilization, and associated change orders, if any. Final mobilization cost shall be calculated by multiplying the Conduit Project unit bid item prices by the actual percentage of which the Bridge Project mobilization bid item amount represents of the total Bridge Project bid amount. 3.4 The City shall prepare monthly pay estimates for the Bridge Project. CenturyLink shall have two working days to review Conduit Project pay item quantities for each pay estimate prior to the City presenting the estimate to the Contractor for payment. 3.5 Upon completion of the Bridge Project, the City shall tabulate all final costs associated with the Conduit Project. This final cost will be compared to the Estimate of Probable Cost described in Section 3.3, above. If the final cost exceeds the Estimate of Probable Cost, CenturyLink agrees to pay the City the difference within 30 days. If the final cost is less than the Estimate of Probable Cost, the City shall either reimburse CenturyLink the difference (if CenturyLink paid cash) or request from the letter of credit or other appropriate financial instrument only the final cost of the Conduit Project. 3.6 CenturyLink shall provide all work in Article 2 at its own cost. 3.7 Any additional construction or modification beyond the scope set forth in the Conduit Project, or costs or amounts beyond those described above, shall be agreed to in writing by the Parties prior to any additional work beginning. ARTICLE 4 — DELAYS If the City's contractor is delayed as a result of CenturyLink not completing its responsibilities within the timeframe set forth under Article 1, and such condition is in CenturyLink or its contractor's direct control, then CenturyLink shall indemnify, defend and hold the City, its officers, officials, and employees harmless from any and all claims, injuries, damages, losses or suits, including attorneys' fees, to the extent arising out of or in connection with such delays, except for delays and damages caused by the City or its contractor. This provision may not be waived by the Parties except in writing. Page 4 of 6 ARTICLE 5 — PERFORMANCE 5.1 The City or its contractor shall promptly and satisfactorily correct Conduit Project work in Schedule E - Utilities Bid Schedule that CenturyLink deems to be defective or not in compliance with the City's approved Bridge Project drawings or specifications. 5.2 Unless otherwise specified in writing by both Parties, all materials used by the Parties to perform their respective obligations under this MOU shall be new and in accordance with the City's approved Bridge Project drawings and specifications. ARTICLE 6 — DURATION; AMENDMENT 6.1 This MOU shall become effective upon signature by the last party to sign, and remain in effect until all work has been performed. This MOU may only be terminated early by written mutual agreement of the Parties. 6.2 This MOU may only be amended by written agreement of the Parties. ARTICLE 7 — PARTY REPRESENTATIVES 7.1 For purposes of this Agreement, CenturyLink's representative is Kevin Goltz. CenturyLink's Representative shall represent CenturyLink's interest during the construction of the Conduit Project, and shall coordinate any modifications or changes needed by CenturyLink in conjunction with the work. 7.2 For purposes of this Agreement, the City's representative is Jim Dingfield, the Bridge Project Senior Engineer — Project Manager. ARTICLE 8 — INDEMNIFICATION 8.1 The City shall indemnify and hold harmless CenturyLink and its officers, agents, and employees, from any and all claims, actions, suits, liability, loss, costs, expenses, and damages of any nature whatsoever, by any reason of or arising out of any negligent or intentional act or omission of the City, its officers, agents and employees, relating to or arising out of performance of this MOU. In the event that any suit based upon such claim, action, loss, or damages is brought against CenturyLink, the City shall defend the same at its sole cost and expense; provided that CenturyLink reserves the right to participate in said suit; and if final judgment in said suit be rendered against CenturyLink, and its officers, agents, and employees, or jointly against CenturyLink and the City and their respective officers, agents, and employees, the City shall satisfy the same. 8.2 CenturyLink shall indemnify and hold harmless the City and its officers, agents, and employees, from any and all claims, actions, suits, liability, loss, costs, expenses, and damages of any nature whatsoever, by any reason of or arising out of any negligent or intentional act or omission of CenturyLink, its officers, agents and employees, relating to or arising out of the performance of this MOU. In the event that any suit based upon such claim, action, loss, or damages is brought against the City, CenturyLink shall defend the same at its sole cost and expense; Page 5 of 6 provided that the City reserves the right to participate in said suit if any principle of governmental or public law is involved; and if final judgment in said suit be rendered against the City, and its officers, agents, and employees, or jointly against the City and CenturyLink and their respective officers, agents, and employees, CenturyLink shall satisfy the same. 8.3 If the comparative negligence of the Parties and their officers and employees is a cause of such damage or injury, the liability, loss, cost, or expense shall be shared between the Parties in proportion to their relative degree of liability and the right of indemnity shall apply to such proportion. 8.4 Where an officer or employee of a Party is acting under the direction and control of the other Party, the Party directing and controlling the officer or employee in the activity and/or omission giving rise to liability shall accept all liability for the other Party's officer or employee's negligence. 8.5 Each Party's duty to indemnify shall survive the termination or expiration of the MOU. 8.6 The foregoing indemnity is specifically intended to constitute a waiver of each Party's immunity under Washington's Industrial Insurance Act, chapter 51 RCW, respecting the other party only, and only to the extent necessary to provide the indemnified Party with a full and complete indemnity of claims made by the indemnitor's employees. The Parties acknowledge that these provisions were specifically negotiated and agreed upon by them. ARTICLE 9 — Integration This MOU is the entire agreement between the Parties and supersedes all prior agreements and understandings between the Parties concerning its subject matter, whether or not written. CITY OF SP I KANE VALLEY: .../ 4 _ City Manager B Mike Jac istine Bainbridge, City Clerk By: C, Office ■ orney CENTURYLINK CORPORATION: Date: 2013: Date: /' /-?/ /47 , 2(}13: By: {Ce.c, a-az, Date: 1/10/2014 , 2043. CenturyLink Corporation Page 6 of 6 Sullivan Road West Bridge Replacement Century Link MOU Calculation of Probable Cost Bid Item Engineer's Estimated Quantity Units Unit Cost Subtotal Consultant Design (10% Sales Tax Mobilization Contingency of Pretax (8.7 %) (10 %) (15 %) Subtotal) Total Cost CenturyLink Percent Apportioned Cost NB Bridge Abutment Core Drilling, Support Braces, Excavation and Backfill 1 LS $ 15,400.00 $ 15,400.00 NB Bridge- Supported 6 -inch Fiberglass Avista Conduit 1 LS $ 28,925.00 $ 28,925.00 NB Bridge- Supported 6 -inch Fiberglass Communications Conduit 1 LS $ 28,925.00 $ 28,925.00 SB Bridge - Supported 8 -Inch Steel Gas Main 1 LS $ 47,840.00 $ 36,715.00 SB Bridge Conduit Support System 1 LS $ 65,380.00 $ 65,380.00 SB Bridge- Supported 6 -Inch Fiberglass Avista Conduits 1 LS $ 57,850.00 $ 57,850.00 SB Bridge- Supported 4 -Inch Fiberglass Zayo Conduit 1 LS $ 22,250.00 $ 22,250.00 SB Bridge - Supported 4 -Inch Fiberglass Comcast Conduit 1 IS $ 22,250.00 $ 22,250.00 1,339.80 $ 1,540.00 $ 2,310.00 $ 1,540.00 $ 22,129.80 $ 2,516.48 $ 2,892.50 $ 4,338.75 $ 2,892.50 $ 41,565.23 $ 2,516.48 $ 2,892.50 $ 4,338.75 $ 2,892.50 $ 41,565.23 $ 3,194.21 $ 3,671.50 $ 5,507.25 $ 3,671.50 $ 52,759.46 $ 5,688.06 $ 6,538.00 $ 9,807.00 $ 6,538.00 $ 93,951.06 $ 5,032.95 $ 5,785.00 $ 8,677.50 $ 5,785.00 $ 83,130.45 $ 1,935.75 $ 2,225.00 $ 3,337.50 $ 2,225.00 $ 31,973.25 $ 1,935.75 $ 2,225.00 $ 3,337.50 $ 2,225.00 $ 31,973.25 25% $ 5,532.45 0% $ 50% $ 20,782.61 0% $ 0% $ 0% $ 0% $ 0% $ $ 277,695.00 $ 24,159.47 $ 27,769.50 $ 41,654.25 $ 27,769.50 $ 399,047.72 $ 26,315.06 0155 - Sullivan Rd W Bridge Replacement #4508 All Activity as of Jan 27 2014 EXPENDITURES Original . Project Adjusted Prior Years 2012 2013 Life. To Date Encumbered Available REVENUES Budget - Budget Actual Actual Actual Actual Encumbered Funds BRM - 26,876.31 8,000,000.00 42,707.84 759,511.78 603,890.23 1,406,109.85 0.00 6,593,890.15 TIB -46.56 3,500,000.00 0.00 0.00 0.00 0.00 0.00 3,500,000.00 FMSIB - 9,334.58 1,583,333.00 0.00 0.00 0.00 0.00 0.00 1,583,333.00 Utility Reimbursement -1.29 430,000.00 0.00 0.00 0.00 0.00 0.00 430,000.00 302 - 15,811.55 146,161.00 0.00 0.00 176,956.41 176,956.41 0.00 - 30,795.41 312 0.00 1,800,881.00 0.00 0.00 0.00 0.00 0.00 1,800,881.00 302 0.00 372,958.00 11,678.18 292,957.63 - 25,769.92 278,865.89 0.00 94,092.11 Total Revenue 0.00 15,833,333.00 54,386.02 1,052,469.41 755,076.72 1,861,932.15 0.00 13,971,400.85 EXPENDITURES Original Budget Adjusted . Budget Prior Years 2012 Actual 2013 Actual Life To Date Encumbered Available Funds Preliminary Engineering Salaries & Wages 30,000.00 30,000.00 3,396.94 11,497.15 41,982.22 56,876.31 0.00 - 26,876.31 Overtime 0.00 0.00 0.00 46.56 46.56 0.00 -46.56 Employee Benefits 10,500.00 10,500.00 1,727.59 3,344.75 14,762.24 19,834.58 0.00 - 9,334.58 Employee Benefits 0.00 0.00 0.00 1.29 1.29 0.00 -1.29 Engineering & Architectural 800,000.00 1,575,000.00 49,261.49 931,937.28 559,337.59 1,540,536.36 50,275.19 - 15,811.55 Prof. Svcs - Survey 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Prof. Svcs. - Geotech 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Advertising 2,000.00 2,000.00 0.00 2,610.55 169.60 2,780.15 0.00 - 780.15 Printing & Binding 2,000.00 2,000.00 0.00 0.00 481.92 481.92 0.00 1,518.08 Miscellaneous Services 5,000.00 5,000.00 0.00 0.00 17,450.00 17,450.00 0.00 - 12,450.00 Aquatic Use Authorizations 0.00 0.00 0.00 1,688.00 1,688.00 0.00 - 1,688.00 PE Contingency 150,500.00 70,000.00 0.00 0.00 0.00 0.00 0.00 70,000.00 Total Prelim. Engineering 1,000,000.00 1,694,500.00 54,386.02 949,389.73 635,919.42 1,639,695.17 50,275.19 4,529.64 Right of Way Salaries & Wages 0.00 2,480.00 0.00 0.00 1,166.74 1,166.74 0.00 1,313.26 Employee Benefits 0.00 870.00 0.00 0.00 497.69 497.69 0.00 372.31 Employee Benefits 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Professional Services 0.00 101,192.00 0.00 0.00 262.00 262.00 0.00 100,930.00 ROW Acquisition 0.00 184,716.00 0.00 0.00 61,458.00 61,458.00 0.00 123,258.00 RW - Land Improvements 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 RW Contingency 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total Right of Way 0.00 289,258.00 0.00 0.00 63,384.43 63,384.43 0.00 225,873.57 Construction Salaries & Wages 149,550.00 0.00 0.00 0.00 0.00 0.00 149,550.00 Overtime 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Employee Benefits 52,341.00 0.00 0.00 0.00 0.00 0.00 52,341.00 Employee Benefits 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Prof. Svcs. Mat. Testing 60,000.00 0.00 0.00 0.00 0.00 0.00 60,000.00 Prof. Svcs. - Consulting 575,000.00 0.00 0.00 0.00 0.00 0.00 575,000.00 Advertising 5,000.00 0.00 0.00 0.00 0.00 0.00 5,000.00 Temporary Easement 0.00 0.00 0.00 1,287.50 1,287.50 0.00 - 1,287.50 Printing & Binding 5,000.00 0.00 0.00 0.00 0.00 0.00 5,000.00 Construction 11,818,000.00 0.00 0.00 0.00 0.00 0.00 11,818,000.00 CN Contingency 559,176.00 0.00 0.00 0.00 0.00 0.00 559,176.00 Const. paid by outside agency 430,000.00 0.00 0.00 0.00 0.00 0.00 430,000.00 Total Construction 0.00 13,654,067.00 0.00 0.00 1,287.50 1,287.50 0.00 13,652,779.50 Other Construction Salaries & Wages 12,450.00 0.00 0.00 6,336.17 6,336.17 0.00 6,113.83 Overtime 0.00 0.00 0.00 507.00 507.00 0.00 - 507.00 Employee Benefits 4,358.00 0.00 0.00 1,576.32 1,576.32 0.00 2,781.68 Employee Benefits 0.00 0.00 0.00 17.34 17.34 0.00 -17.34 Professional Services 3,700.00 0.00 0.00 59.68 59.68 0.00 3,640.32 Vehicle Rental 0.00 0.00 0.00 504.51 504.51 0.00 - 504.51 Building and Structures 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Construction 175,000.00 0.00 0.00 107,012.14 107,012.14 58,772.29 9,215.57 Total Other Construction 0.00 195,508.00 0.00 0.00 116,013.16 116,013.16 58,772.29 20,722.55 Total Ex•enditures 1,000,000.00 15,833,333.00 54,386.02 949,389.73 816,604.51 1,820,380.26 109,047.48 13,903,905.26 ►�®.M Centur Link- July 25, 2014 City of Spokane Valley 11707 East Sprague Avenue,Suite 106 Spokane Valley,WA 99206 Attn: Jim Dingfield RE: Phase 2—Sullivan Road West Bridge Replacement Project#0155 Dear Mr. Dingfield, Centurylink approves the apportioned cost of$26, 671.80 which is$356.74 above the $26,315.06 not-to exceed amount specified in the MOU. We approve the anticipated cost that is in excess of the amount shown in the MOU. If you have any questions or concerns, please contact me at 509-623-0304. Sincerely, 4,44 itli Kevin Goltz l� Engineer II 904 N Columbus Spokane,WA 99202 www.centurylink.com CA)\L\-o12