Loading...
2010, 05-05 Permit App: 10001270 ShopSpokane Valley R q \t-' CITY OF SPOKANE VALLEY CE Community Development Department 0 ,j 2(' Permit Center 11703 East Sprague AVenuieE.-Suite B -3 Spokane Valley, WA 99 Tel: (509) 688 -0036 8ubmiital # Fax: (509) 688 -0037 permitcenter©spokanevalley.ora PERMIT NUMBER: PERMIT FEE: (Staff Use Only) /(.) 1210 RESIDENTIAL CONSTRUCTION PERMIT APPLICATION ❑ ADDITION /REMODEL ® ACCESSORY BUILDING ❑ OTHER ❑ NEW CONSTRUCTION ❑ DECK SITE ADDRESS:17416 E ALKI ASSESSORS PARCEL NO.: LEGAL DESCRIPTION: BUILDING OWNER NAME: DONALD AND DONNA GRAHAM NAME:DONALD AND DONNA GRAHAM ADDRESS:17416 E. ALKI CITY:SPOKANE VLLEY PHONE:509 922 7563 CONTACT NAME:DONALD GRAHAM PHONE:509 922 7563 FAX: STATE:WA ZIP:99016 CELL:509 3421063 FAX: CELL: 509 342 1063 CONTRACTOR NAME:NA MAILING ADDRESS:NA CITY:NA STATE:NA ZIP:NA PHONE:NA FAX:NA CELL:NA CONTRACTOR LICENSE NO.:NA EXPIRES:NA CITY BUSINESS LICENSE NO.:NA DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE: ADDING A 24'X36' SHOP BUILDING PROPOSED USE: NON COMERCIAL HOBBY SHOP Effective October 28, 2007 Page 1 of 2 r.\r...... ........ }.- �..A C.. }}:...- \n !`�.. L. 1 arni \AA., ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak:23' Dimensions:24 x 36 No. of Stories:2 Total Habitable Space:1296 Main Floor SQ FT:864 Upper Floor SQ Unfinished Basement Finished Basement 0 - FT:432 0,K, SQ FT:NA SQ FT:NA Garage SQ FT:NA Deck/Covered Patio Impervious Surface 30% Slopes on SQ FT:NA Area:864 Property:NA No. of Bedrooms:NA Construction Heat Source:GAs HOT Sewer or Type:FRAME WATER Septic:SEPTIC TOTAL COST OF PRO3ECT: $15000 DISCLAIMER The permitted verifies,acknowledges and agrees by their signature that: 1)if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner In this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is n. . permit or ap•roval for any location of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be requir d t, be submityan subseq ntly approved before this application can be processed. Signature zo /r �� Date:4-5-2010 Method of payment: ❑ Cash ❑ Check ❑ Visa ❑ Mastercard Bankcard #: EXP: VIN#: Authorized Signature: Page Effective October 28, 2007 Pa 9 r.�n.............F.. -....+ c,.��......�n rte..�....... inrnn ne..n........-.,...�.-�ca,...�......i..,..,.....n,...�r...,....�,.�,.a n....:a,...t:..� r.....-a-..,.�:.,.. n,.....,.:.. Spokane •Val ley For City Use Only PLUS Project Number / ' 1,- Project Address ] ' C 11703 E Sprague Ave Suite B -3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re- submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow.the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre - Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick -up. Information regarding fees and pre - construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE — APPLICANT PINK — BUILDING FILE REV 9/07 North 40' Alki Avenue Drain Feld 0/— 60' Existing Residence 1320 Sq.Ft. — Garage 616 Sq.Ft. 17416 E. Alki 13700 Sq.Ft. Patio Proposed Shop RECEIVED CSV PERMIT CENTER MAY 0 5 2010 Project # I ' 1 Name Submittal # 4'. 0 Septic Tank 36' 100' SCTTYok.ne p Valle y May 6, 2010 11703 E Sprague Ave Suite B -3♦ Spokane Valley WA 99206 ♦ 509.720.5240 ♦ Fax: 509.688.0037 D. W. Graham 17416 E. Alki Ave. Spokane Valley, WA 99016 -936 Re: Project # 10- 001270 Dear Mr. Graham: In order to complete the plans examination for your proposed project, additional information will be necessary. In our telephone conversation on May 5, 2010 you stated that the second floor of the structure would be used for a television and couch. This would be classified as a Residential Group 3 Occupancy recreation room. As such it would be habitable space and require heating per the International Residential Code Section R303.8. The 2006 Washington State Energy Code (WSEC) requires insulation in the roof, walls, and floor for conditioned spaces. If the second floor area is designated as unconditioned residential storage only, no insulation would be required. The heating source listed on the permit application is "gas hot water ". Is this a radiant floor heating for the main floor shop area or only a hot water heater for potable water? The WSEC would require insulation for radiant floor heating. The location of the gas heating appliance or hot water heater is not depicted on the plans and may require outside combustion air. In either situation a plumbing and mechanical permit would also be required and may be applied for separately. The plans also do not reflect completely the application of the gypsum wall board at the stairway. If there is enclosed accessible space under the stairway, the walls and under stair surface would require a minimum 1/2" gypsum wall board as well as fire blocking for fire separation. Your engineer may be able to address concerns on fire resistance separation, size and placement of insulation, and heating appliance location for the structure. If you have any questions, please feel free to contact me by telephone at (509) 720- 5315 or email at tmelbourn(a�spokanevalley.orq. Sincerely yours, Tom Melbourn, Plans Examiner City of Spokane Valley SI�kan' e�, jUalley Site Address: 17416 E ALKI AVE Parcel Number: 55183.0336 Zoning: R -3 Fire District: FD 01 Project Transmittal City of Spokane Valley Community Development Department 11703 E. Sprague Ave, Suite B3 Spokane Valley, WA 99206 Phone: 509.688.0036 New project ri Previous pre -app meeting ❑ Plan revisions 0 Transmittal Date: Wednesday, May 05, 2010 Project Number: 10001270 Water District: CONSOLIDATED ID #19 Applicant: GRAHAM, D W Owner: GRAHAM, D W 17416 E ALKI AVE 17416E ALKI AVE SPOKANE VALLEY, WA 99016 -936 SPOKANE VALLEY, WA 99016 -936 (509) 922 -7563 e -mail: e-mail: Contact: GRAHAM, D W Occupant: 17416E ALKI AVE SPOKANE VALLEY, WA 99016 -936 e-mail: (509) 922 -7563 e -mail: Contractor: OWNER ( ) - 0 Arch / Engineer: e -mail: Project Description: NEW 24 X 36 SHOP Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATIO CONSTRUCTION PLAN SITE PLA n t TD Please send all plan review and project comments via e-mail to the highlighted individuals.