HomeMy WebLinkAbout2010, 10-06 Permit App: 10003264 Finish BasementSpokane
_ VaHey�
Community Development
Permit Center
11703 E Sprague Ave, Suite B -3
Spokane Valley, WA 99206
(509)688 -0036 FAX: (509)688 -0037
www.spokanevalley.org
PERMIT NUMBER:
PERMIT FEE:
Residential Construction 1 1 New Construction Accessory Bldg
Permit Application Addition /Remodel n Deck
Other:
SITE ADDRESS:
r752o E poW SprXf t v�11� ti �� 99'0I (
ASSESSORS PARCEL NO: 551 aJ O y (D LEGAL DESCRIPTION: Co c %1 n Green 0 i 1p
E X35 ff- LT1 gi 1C I
Building Owner:
DIMENSIONS:
Name: :1-705h) S pt -E C) e S
TOTAL HABITABLE SPACE:
Address: 1 --� 5 20 a Al i
Address:
City: S oyfA /i� \)411,7 State: Zip:
i %O /la
`
Phone: -) 2 / p _o r Fax:
State:
Contact Person
Name: 5-05h i1 �
Phone: Z� $ — O9 (p v
Describe the scope of work in detail:
fCaf Ir)4 to Pict. W4.lIS /A,
J
Contractor: I'll ,1 aer
:J ill
DIMENSIONS:
Name:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
Address:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
AREA:
City:
State:
Zip:
Phone:
Fax:
CONSTRUCTION TYPE:
Contractor Lic No:
Exp Date:
City Business Lic. No:
Cost of Project:
nu -HP is OAc)
$' n,50lo1--t'014
f pro t
2,a'o
/ t' Ieam/I
Proposed Use:
* * * * * * * * * * * ** *The following MUST be complete: (write N/A if not applicable ) * * * * * * * * * * * * * * * * * * * * **
HEIGHT TO PEAK:
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ.
FTG:
2Nu FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
AREA:
FINISHED BASEMENT 7
SQ. FTC;r: 2.% opL
GARAGE SQ. FTG:
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
PROPERTY:
# OF BEDJ OOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:
SEWER OR SEPTIC?
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is /will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be pressed.
SIGNATURE:
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
❑ Check
DATE: /O/ 20(0
❑ Mastercard ❑ VISA
Expires: VIN #:
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
❑ SITE PLAN
❑ Property lines and dimensions
❑ Direction arrow pointing North and orientation to streets
❑ Proposed /existing buildings (footprint and dimensions)
❑ Utilities, septic tank /drain field locations and distances
❑ Setbacks to property lines
❑ Distance between buildings
❑ Right of way /easement location & sizes
❑ Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
❑ Elevations (Front/Rear /Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
❑ Footing sizes and locations
❑ Perimeter concrete foundation wall sizes
❑ Crawlspace ventilation
❑ Supporting wood cripple walls or beams
❑ Thickened concrete pads supporting
beams or girder trusses
❑ Floor Plan of each level (finished or unfinished) with dimensions:
❑ Floor Joist direction, size and spacing ❑ Window and door location and sizes
❑ Header, beam or concrete lintel sizes ❑ Window well locations if applicable
❑ Brace wall panel locations ❑ Room usage labels
❑ Water heater and furnace locations ❑ Smoke detector locations
❑ Exhaust fan locations ❑ Attic and crawl space access locations
❑ Deck or concrete patio sizes and locations ❑ Fire Wall construction
❑ Roof Plan:
❑ Engineered truss direction and spacing
❑ Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
❑ Slope/ roofing material/ underlayment/ ice dam protection
❑ Sheathing size and type
Ceiling
❑ Joist size and spacing
Wall
❑ Height/ top plate/ stud size and spacing/ sole plate
❑ Exterior sheathing size and type
Floor
❑ Joist size and spacing
Foundation Wall
❑ Concrete or Masonry unit width
❑ Earth to wood separation distance
Footing
❑ Size
Radon
❑ Passive system with 6mil vapor barrier
Miscellaneous Construction Details
❑ Deck:
❑ Floor plan/ side view/ dimensions
❑ Floor Joist/ decking direction, size and spacing
❑ Stairway tread rise & run and nosing
❑ Ridge, eave and valley lines
❑ Beam and girder size and location
❑ Truss or rafter size, spacing & connection
❑ Attic insulation/ air space baffle/ ventilation
❑ Size of ceiling gypsum wall board
❑ Siding/ exterior house wrap/ anchor bolts
❑ Insulation, vapor barrier, gypsum wall board
❑ Sheathing or concrete floor size/ insulation
❑ Footing bottom to finished ground level depth
❑ Horizontal & vertical reinforcement if any
❑ Reinforcement if any
❑ Active system with 6 mil vapor barrier
❑ Footings/ post/ and beam size and locations
❑ Handrail / Guard height & spacing
Spokane
Walley
Permit Center
11703 E Sprague Ave, Suite B -3
Spokane Valley, WA 99206
(509)688 -0036 FAX: (509)688 -0037
permitcenter@spokanevalley.org
Community Development
Plumbing Permit Application
PERMIT NUMBER:
PERMIT FEE:
Commercial 1/I Residential
SITE ADDRESS:
75� fit', s /akal \c►lQy; witi 79D/
Building Owner
Name: j—r Phone: (c) / / t� ,� og�/ Fax:
by �n� /� O 4
Address: City: State: Zip:
Contractor
Name: Phone: Fax:
Address: City: State: Zip:
License No: City Business Lic:
Contact/Project Manager:
Name: Phone:
# OF UNITS
PLUMBING FIXTURE ON A TRAP
TOILETS
URINALS
TUBS
SHOWERS (per trap)
SINKS
Lav /Basins, Bar, Floor, Kitchen, Laundry, Utility, Janitor, Photo, X -ray, Food,
Prep /Culinary Meat
DISHWASHER
CLOTHES WASHER
GARBAGE DISPOSAL
WATER SOFTNER
FLOOR DRAIN
Area, Case, Coil, Trench, Condensate
ROOF DRAIN /OVERFLOW DRAINS
FOUNTAIN, DRINKING
WATER PIPING /DRAIN -IN WASTE
Installation, Alterations, Repair, Reversals
I
WATER USING DEVICE
Ice and /or Coffee maker, hose bib, steamer proofer, carbonator, swamp cooler
PRIVATE SEWAGE DISPOSAL SYSTEM
WATER HEATER
If Gas, See Mechanical
INDUSTRIAL WASTE PRETREATEMENT
INCEPTORS
Including traps, vents except kitchen type grease interceptors functioning as fixture traps
REPAIR OR ALTERATION
Water piping, drainage or vent piping
ATMOSPHERIC TYPE VACUUM BREAKER
BACK FLOW PROTECTIVE DEVICE
Other than atmospheric type vacuum breakers
MEDICAL GAS
INCEPTORS
❑CASH ❑ CHECK ❑ VISA ❑ MC EXPIRES:
Card# VIN:
SIGNATURE:
CURRENT FEES AVAILABLE AT: http: / /www.spokanevalley.orq/ under the quick links for Forms, Master Fee Schedule.
http: / /www.spokanevalley.orgf uploads /Community_Development/ Documents / Forms / Building/ PlumbingPermitApplication040309. doc
Project Number: 10003264 Inv: 1
Application
Date: 10/7/2010 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: FINISH BASEMENT, 3 EGRESS WINDOWS &
REPLACE 1 WATER PIPING
Contact: INGELS, JOSHUA H & CINDY D
Address: 17520 E ALKI AVE
C - S - Z: SPOKANE VALLEY, WA 99016
Setbacks: Front Left: Right: Rear: Phone: (509) 921 -1053
Group Name:
Site Information:
Project Name:
Plat Key: 001357 Name: KATHRINES SUB
Parcel Number: 55183.0410 Block: Lot:
SiteAddress: 17520 E ALKI AVE
Location:: CSV
District: East
Owner: Name: INGELS, JOSHUA H & CINDY D
Address: 17520 E ALKI AVE
SPOKANE VALLEY, WA 99016
Zoning: R -4 SF Res Urban District
Water District: 134 CONSOLIDATED ID #19 Hold: U
Area: 14,280 Sq Ft Width: 100 Depth: 168 Right Of Way (ft): 40
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review
Permits:
Released By:
Originally Released: 10/7/2010 By: tmelbourn
Contractor: OWNER
Building Permit
Firm: OWNER
Phone: (000) 000 -0000
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
BASEMENT R R -3 VB 528 $2,640.00 528 $2,640.00
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 528 $2,640.00 528 $2,640.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Fee Amount
$83.25
$4.50
$33.30
Permit Total Fees: $121.05
Operator: JD Printed By: JD Print Date: 10/7/2010
Project Number: 10003264 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 10/7/2010 Page 2 of 2
Contractor: OWNER
Item Description
WATER PIPING - DWV
Notes:
Issued home occupation affidavit of exemption 8/25/2008 - Joshua Ingels, "J &C Woodcutting"
Firewood collection and sales. Firewood will not be stored on premises
Plumbing Permit
Firm: OWNER
Phone: (000) 000 -0000
Units Unit Desc
1 NUMBER OF
Permit Total Fees:
Fee Amount
$6.00
$6.00
Payment Summary:
Permit Type
Building Permit
Plumbing Permit
Fee Amount Invoice Amount Amount Paid Amount Owing
$121.05 $121.05 $33.30 $87.75
$6.00 $6.00 $0.00 $6.00
$127.05 $127.05
$33.30 $93.75
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and /or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD Print Date: 10/7/2010
Spokane
jUalle3',
For City Use Only
PLUS Project Number f)( (rid
Project Address
11703 E Sprague Ave Suite B -3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re- submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revisedy information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown a t the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre - Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick -up. Information regarding fees and pre - construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE — APPLICANT PINK — BUILDING FILE REV 9/07