Loading...
2013, 03-14 Permit: SW-13000222 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW- 13000222 Permit Issued Date: 03/14/2013 Project Description: SEWER CONNECTION Project Name: GREEN HAVEN Primary Contact: ACME EXCVT & SEWER BORING CO Applicant: ACME EXCVT & SEWER BORING CO Phone: (509)228 -0691 Address: 6808 S. LINKE RD. GREENACRES, WA 99016 Phone: (509)228 -0691 Email: SITE INFORMATION: Site Address: Parcel Number: Assessor's Description: Inspection Area: Zoning: 18003 E ALKI AVE 55184.1313 CORBIN ADD TO GREENACRES S195' OF W75' OF LT 3 BLK 13 : (509)- 477 -3675 Owner: Address: Phone: Email: BENGE, KENNETH L 18003 E ALKI AVE GREENACRES, WA 99016 -9368 Water District: Consolidated Irrigation Fire District: Spokane Valley Fire District #19 Land Area: 14625 Square Feet CONTRACTOR INFORMATION: ACMEEES963LD, Exp. 06/04/2014 ACME EXCVT & SEWER BORING CO 6808 S. LINKE RD. GREENACRES, WA 99016 (509)228 -0691 DETAILS: Class SEWER FEE DETAIL: Processing - Utilities Utilities Permit Type Quantity Unit Charge Value SEWER CONNECTION Total Fee: $26.32 $125.00 $151.32 1 $125.00 $125.00 $125.00 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1- 800 - 424 -5555 BEFORE YOU DIG - -AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477 -3604 FROM 8:30 -5:00 MONDAY - FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30- MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. Date Printed: 03/14/2013 10:27:23 Project Coordinator Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW- 13000222 Permit Issued Date: 03/14/2013 SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 03/14/2013 10:27:23 Project Coordinator: Kathy Cummings