Loading...
2009,06-25 Permit App: 09001875 ResidenceSijokane jUalley CITY OF SPOKANE VALLEY Community Development Department Permit Center 11703 East Sprague Avenue, Suite B -3 Spokane Valley, WA 99206 Tel: (509) 688 -0036 Fax: (509) 688 -0037 permitcenter@spokanevallev.orq (Staff Use Only) (1 (C) I PERMIT NUMBER: PERMIT FEE: RED.. CITY CF ` YE vALLEY, JUN 25 2.6 �t^�cNMIT CENTER RESIDENTIAL CONSTRUCTION PERMIT APPLICATION NEW CONSTRUCTION ❑ ADDITION /REMODEL ❑ ACCESSORY BUILDING ❑ DECK ❑ OTHER SITE ADDRESS:17409 E ALKI ASSESSORS PARCEL NO.: LEGAL DESCRIPTION: BUILDING OWNER NAME: NAME:BILLY AND TERESA CARTER ADDRESS:11310 S STARR RD CITY: ROCKFORD STATE:WA ZIP:99030 PHON E:509- 495 -4442 FAX: CELL: CONTACT NAME:JEREMY GRAY PHON E:509- 868 -4905 Fax:866- 392 -6809 CELL:509- 868 -4905 CONTRACTOR NAME:GRAY HOMES LLC MAILING ADDRESS:PO Box 1197 CITY:SPOKANE VALLEY STATE:WA ZIP:99037 PH0NE:509- 868 -4905 FAx:866- 392 -6809 CELL:868 -4905 CONTRACTOR LICENSE No.:GRAYHHL946BP EXPIRES :JUN 2010 CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE: BUILD AN NEW HOUSE WITH A FINISHED BASEMENT AND 2 CAR ATTACHED GARAGE PROPOSED USE: SINGLE FAMILY DWELLING 9- / 7 S ** *YOU MUST COMPLETE THE FOLLOWING * * ** MARK N/A IF NOT APPLICABLE Height to Peak:18'6" Dimensions:72x38 No. of Stories:1 Total Habitable Space:2712 270 V Main Floor SQ FT:1356 .t 3 s-2_ Upper Floor SQ FT: Unfinished Basement SQ FT: /OS, Finished Basement SQ FT:1356- is ,r- Z Garage SQ FT:9.12- /p /g-' Deck /Covered Patio SQ FT: Impervious Surface Area: 30% Slopes on Property: No. of Bedrooms:2 Construction Type:STIcK FRAME Heat Source:GAS FORCED AIR /HEAT PUMP Sewer or Septic:sEPTIc TOTAL COST OF PROJECT: $130000 DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is /will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature Method of payment: ❑ Cash Bankcard #: Date:6 -25 -09 ❑ Check ❑ Visa ❑ Mastercard EXP: VIN #: Authorized Signature: Permit Center *Wane11703E Sprague Ave, Suite B -3 Spokane Valley, WA 992C�ECEIVED BY Valley® (509)688 -0036 FAX: f®�-: i`°` KANE VALLEY www.spokanevalley.org tA' 2009 Community Development JIJi� 2 Approach Permit Application it IT CENTER rz PERMIT NUMBER: PERMIT FEE: -5 PROJECT ADDRESS f l O Ci 111. START DA 1h ANTICIPATED COMPLETION DAZ'E Building Owner: Contractor: Name: -J.egt CAQ71' P Address: j 31 t3 S s-TA R Name: er0-1► bbe w. Address: ,-p j ?; t 1 City: iZo CjL t-4) State: IAA Zip: 19 Phone: liSS�-� l t" Fax: t y Contact Person Name: jr 1V-1 Phone: 5c,e9_ b - yr7t1S PROJECT DESCRIPTION (Provide site sketch) Residential Driveway Existing Curb & Gutter Culvert Installation Other Conditions City: S.6 \ State: i„.p.et Fax: Ph o ne: 501-13c - 'MS Zip GM /` Contractor Lic No( ju1 '`Exp Date: ,Jl i Ztijb City Business Lic. No: Commercial /Industrial Driveway Rural Road Section Sidewalk Repair /Construction Bond /Insurance certification must be on file with the city. DISCLAIMER The permittee verifies, acknowledges and agrees by their signatures that: 1) If this permit is for construction of or on a dwelling, the dwelling is /will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. Signature Method of Payment: ❑ Cash ❑ Check Bankcard #: Authorized Signature: REVISED 3/9/06 Date ❑ Mastercard ❑ VISA Expires: VIN #: SO 'lane� .000Valley Urban Driveway Approach Requirements ► Minimum of 7.5' from property line ■ Minimum of 5' from crosswalks or intersection curb arc ■ Minimum of 16' wide flat portion of approach ■ Maximum of 30' wide flat portion of approach ■ Combined approach width not to exceed 50% of total frontage ► Minimum of 15' of separation between any two approaches ** All driveway approaches to be constructed per the Spokane County Standards as adopted by the City of Spokane Valley ** Walley Permit Center 11703 E Sprague Ave, Suite B -3 Spokane Valley, WA 99206 (509)688 -0036 FAX: (509)688 -0037 permiteenter (d?spokanevalley.org Community Development Plumbing Permit Application PERMIT NUMBER: PERMIT FEE: Commercial ® Residential SITE ADDRESS: l Oct E 14 LI -L Building Owner Name: Billy and Teresa Carter Phone:509 -495 -4442 Fax: Address: 11310 S Starr Rd City: Rockford State: wa Zip: 99030 Contractor Name: Gray Homes LLC Phone: 509- 868 -4905 Fax: 866 - 392 -6809 Address: PO Box 1197 City: Spokane Valley State: WA Zip: 99016 License No: grayhhl946bp City Business Lic: Contact/Project Manager: Name: Jeremy Gray Phone: 509- 868 -4905 # OF UNITS PLUMBING FIXTURE ON A TRAP TOILETS 3 URINALS TUBS 1 SHOWERS (per trap) 1 SINKS Lav /Basins, Bar, Floor, Kitchen, Laundry, Utility, Janitor, Photo, X -ray, Food, Prep /Culinary Meat 5 DISHWASHER 1 CLOTHES WASHER 1 GARBAGE DISPOSAL 1 WATER SOFTNER 1 FLOOR DRAIN Area, Case, Coil, Trench, Condensate 1 ROOF DRAIN /OVERFLOW DRAINS FOUNTAIN, DRINKING WATER PIPING /DRAIN -IN WASTE Installation, Alterations, Repair, Reversals WATER USING DEVICE Ice and /or Coffee maker, hose bib, steamer proofer, carbonator, swamp cooler 3 PRIVATE SEWAGE DISPOSAL SYSTEM WATER HEATER If Gas, See Mechanical INDUSTRIAL WASTE PRETREATEMENT INCEPTORS Including traps, vents except kitchen type grease interceptors functioning as fixture traps REPAIR OR ALTERATION Water piping, drainage or vent piping ATMOSPHERIC TYPE VACUUM BREAKER BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers MEDICAL GAS INCEPTORS ❑CASH ❑ CHECK ❑ VISA ❑ MC EXPIRES: Card# VIN: SIGNATURE: CURRENT FEES AVAILABLE AT: http: / /www.sookanevallev.orq/ under the quick links for Forms, Master Fee Schedule. 111 14 ne Val ley Community Development Mechanical Permit Application Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688 -0037 perm itcenter(u,spokanevalley.org PERMIT NUMBER: PERMIT FEE: (] Commercial ►1 Residential SITE ADDRESS: ("}L4 ©9 AL1(-L Building Owner Name: Teresa and Billy Carter Phone:509 -495-4442 Fax: Address: Contractor City: Rockford State: WA Zip: 99030 Name: Gray Homes LLC Phone: 509- 868 -4905 Fax: 866-392-6809 Address: PO Box 1197 City: Spokane Valley State: WA Zip: 99016 License No: grayhhl946bp City Business Lic: Contact/Project Manager. Name: Jeremy Gray Phone: 509- 868 -4905 ❑CASH ❑ CHECK ❑ VISA ❑ MC CARD #: EXPIRES: SIGNATURE CURRENT FEES AVAILABLE AT: htto: / /www.sookanevallev.orq Quick link to forms, then Master Fee Schedule AAnn;ntncl, 1ill•1 loo. c•; nrnm., n. n .r•r1ACLrnn•11.iPn{.on:ro Marvin ;r A,.nr;rot;nnnnnl no .Inn #UNITS FURNACES & SUSPENDED HEATERS - INSTALLATION OR RELOCATION Up to & including 100,000 BTU 1 FURNACES & SUSPENDED HEATERS - INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM HEAT PUMP /AIR CONDITIONER 0-3 TON AIR CONDITIONER Over 3 -15 TON 1 AIR CONDITIONER Over 15 -30 TON AIR CONDITIONER Over 30-50 TON AIR CONDITIONER Over 50 TON GAS WATER HEATER 1 GAS PIPING SYSTEM (each outlet) 3 GAS LOG, FIREPLACE, & GAS INSERT APPLIANCE VENTS INSTALLATION, RELOCATION, REPLACEMENT REPAIRS OR ADDITIONS BOILER, COMPRESSORS, ABSORPTIONS SYSTEM 0 to 3 hp- 100,000 BTU or less BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 3 - 15 hp — 100,001 to 500,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 15 — 30 hp - 500,001 to 1,000,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 30 hp- 1,000,001 to 1,750,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 50 hp — over 1750,000 BTU AIR HANDLER (DOES NOT include ducting) Each unit up to 10,000 cfm, including ducts AIR HANDLER (DOES NOT include ducting) Each unit over 10,000 cfm EVAPORATIVE COOLERS(other than portables) VENTILATION AND EXHAUST Each fan connected to a singe duct 5 VENTILATION AND EXHAUST Each ventilation system VENTILATION AND EXHAUST Each hood served by mechanical exhaust INCINERATORS Installation or relocation of residential INCINERATORS Installation or relocation of commercial APPLIANCES Range, Clothes Washer 1 UNLISTED APPLIANCES Under 400,000 BTU UNLISTED APPLIANCES Over 400,000 BTU HOOD Type I HOOD Type II L P STORAGE TANK WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM — FREE STANDING ❑CASH ❑ CHECK ❑ VISA ❑ MC CARD #: EXPIRES: SIGNATURE CURRENT FEES AVAILABLE AT: htto: / /www.sookanevallev.orq Quick link to forms, then Master Fee Schedule AAnn;ntncl, 1ill•1 loo. c•; nrnm., n. n .r•r1ACLrnn•11.iPn{.on:ro Marvin ;r A,.nr;rot;nnnnnl no .Inn NV -Id RlIS uoI6uit{snm `fta21nn aum ods 0_(V ?NW aOi7L I :Jo./ pauIrsaa a '°H srrLL 8au'o i 9/8A? QY'Qilb'o JOfSF+�9'OJ u isa4 9WOH tin ;ua� ;s4Z 17-3 ,.94/6 6-,014 ROPERTY LINE PROPERTY LINE w w wr ll. ti N 7 N 1P.m, 0 o } WUQ� (e-. d0 0 O -I ':) 0_ozW .�_ 0_ 03 ¢0 - -r� PROPERTY LINE 0 0 r• V CO O) M 215' -5 11/16" .94/6 6-,06 (0 co E a)0_ O O) = N t O (A • • (A N '- O L = N N • C ((• A A _c N E a) a) E m �E$oo) •E y m w a) Y N > .9., N N N Q O • VN U 2 ° N « w (0 C °s W ( 0(I) 7 a m M N L N a N 0 y > N 7 N N • o - ▪ cn 7 N :C > (0 O i N — N to -ct N N w n H C 7 C a) .L N N O E /. NV-1d 31IS �uol6unusn i `fia11nv aun cods a(r 60i7Z -1 's-IN '44f paaBrsaQ awoH srrL 1.575`155.5173 91958 at -4vP m.ro 013Em9'Od 7676.5.01.01.4 AinW90 ;sLZ ..9U6 6-,01. U W 0 � w w Xa_ wr -TI Z m AA sr 0 O ROPERTY LINE w w ° Q—z z W - w W < CCI) � W 0w °. C7 z Zg ELT:, PROPERTY LINE O O 0 ”0-.9£ 0aw z-. .0 ,r,� - -- ------ - - - - -- a m <a - - - -- --7 PROPERTY LINE co c 216-5 11/16" „9L16 6-,06 Scale 1/32" = 1'-0" J Project Number: 09001875 Inv: 1 Application Date: 7/2/2009 Page 1 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: NEW SFR- SEPTIC Setbacks: Front Site Information: Plat Key: Left: Right: Rear: Name: Range Contact: GRAY HOMES, LLC Address: PO BOX 1197 C - S - Z: SPOKANE VALLEY WA 99037 Phone: (509) 868 -4905 Group Name: Project Name: District: East Parcel Number: 55183.0203 Block: SiteAddress: 17409 E ALKI AVE Location:: CSV Lot: Owner: Name: CARTER, TERESA J & WILLIAM Address: 11310 S STARR RD ROCKFORD, WA 99030 Zoning: R -3 SF Res District Water District: 134 CONSOLIDATED ID #19 Area: 23,345 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Hold: ❑ Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released By: Driveway /Approach Originally Released: 6/25/2009 By: tmelbourn Released By: APPROACH NOT REQUIRED Originally Released: 6/25/2009 By: WMCGAV Septic Sys Review Released By: Originally Released: 7/2/2009 By: LHALSEY Operator: jmm Printed By: jmm Print Date: 7/2/2009 Project Number: 09001875 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 7/2/2009 Page 2 of 3 Landuse /Zoning/HE Conditions Permits: Released By: Approved with conditions Originally Released: 6/30/2009 By: lbarlow Contractor: GRAY HOMES LLC Address: 18621 E 4TH Phone: (000) 000 -0000 SPOKANE VALLEY, WA 99016 Building Permit Firm: GRAY HOMES LLC This Application: Total Project: Description Grp Type Notes Su Ft Valuation Su Ft Valuation 1 &2 FAMILY R -3 VB 1,352 $130,914.16 1,352 $130,914.16 BASEMENT F R -3 VB 1,352 $27,040.00 1,352 $27,040.00 BASEMENT U R -3 VB 108 $1,620.00 108 $1,620.00 GARAGE U -1 VB 1,018 $19,342.00 1,018 $19,342.00 Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Totals: 3,830 $178,916.16 3,830 $178,916.16 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: Mechanical Permit Fee Amount $1,436.15 $4.50 $574.46 $2,015.11 Contractor: GRAY HOMES LLC Firm: GRAY HOMES LLC Address: 18621 E 4TH Phone: (000) 000 -0000 SPOKANE VALLEY, WA 99016 Item Description GAS WATER HEATER GAS APPLIANCE <= 100,000BTU GAS PIPING HEAT PUMP OR A/C 0 -3 TONS RANGE VENTILATION SYSTEM Units Unit Desc 1 NUMBER OF 1 NUMBER OF 3 # OF UNITS 1 NUMBER OF 1 NUMBER OF 5 NUMBER OF Fee Amount $11.00 $13.00 $3.00 $13.00 $10.00 $65.00 Permit Total Fees: $115.00 Manufactured Home Park Firm: Phone: Operator: jmm Printed By: jmm Print Date: 7/2/2009 Project Number: 09001875 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 7/2/2009 Plumbing Permit Contractor: GRAY HOMES LLC Firm: GRAY HOMES LLC Address: 18621 E 4TH Phone: (000) 000 -0000 SPOKANE VALLEY, WA 99016 Item Description TOILETSBIDETS SINKS SHOWERS TUBS DISH WASHERS GARBAGE DISPOSAL CLOTHES WASHER FLOOR DRAINS WATER SOFTENER MISCELLANEOUS FIXTURES Units Unit Desc 3 NUMBER OF 5 NUMBER OF 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF 3 NUMBER OF Page 3 of 3 Fee Amount $18.00 $30.00 $6.00 $6.00 $6.00 $6.00 $6.00 $6.00 $6.00 $18.00 Permit Total Fees: $108.00 Septic Designed for 2 bedrooms only. Pursuant to SHP 22 -07 Plat dedication language, each new building shall be double plumbed with a dry side sewer for connection to future area -wide wastewater collection systems. Plans acceptable to the Division of Utilities may be required. The structure shall be setback a minimum of 20' from the north edge of the fire access easement. This is required since the garage faces the access easement, so that adequate room is provided to park a car, while leaving the fire access clear. The driveway shall be hardpaved from the north edge of the gravel fire lane easement up to the garage and must be a minimum of 17' wide in order to satisfy the requirement for two off - street parking spaces. Payment Summary: Permit Type Building Permit Mechanical Permit Plumbing Permit Fee Amount Invoice Amount $2,015.11 $115.00 $108.00 $2,015.11 $115.00 $108.00 Amount Paid $507.26 $0.00 $0.00 Amount Owing $1,507.85 $115.00 $108.00 $2,238.11 $2,238.11 $507.26 $1,730.85 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and /or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 7/2/2009 Spokane jUalley° For City Use nly, PLUS Project Number 5� Project Address / NO e 11703 E Sprague Ave Suite B -3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter®spokanevalley.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is 7/005 The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re- submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre - Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received,. a Permit Specialist will process the application and contact the person specified on your application for permit pick -up. Information regarding fees and pre - construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE — APPLICANT PINK — BUILDING FILE REV 9/07