2011, 08-01 Permit App: 11002335 Pole BldgSpokane
Valleyri
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B -3
Spokane Valley, WA 99206
Tel: (509) 688 -0036
Fax: (509) 688 -0037
Permitcenter(thsookanevalley.oro
(Staff Use Only) \
PERMIT NUMBER: L3)J
PERMIT FEE:
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
❑'' NEW CONSTRUCTION 0 ADDITION /REMODEL ACCESSORY BUILDING
DECK ❑ OTHER
SITE ADDRESS: iO I (Q £. Q\kA
ASSESSORS PARCEL NO.: 5 /g , �Ll3cJ LEGAL DESCRIPTION: 70. -9 /f— �..� Tract
BUILDING OWNER NAME: c.SO4l
NAME: ('y'\ e . 4 c1\ e_ r)
ADDRESS: I () I (S) E.. Al k/'
CITY: S n i< n_t_ \kaki STATE: qA
PHONE: Jrv�_ -79(--1-_,o i`37- Ce1 FAX: CELL:
it(A. 14315
CONTACT NAME: 3 0 - Nk.,n
PHONE: 7.0 -7011 -01 S. FAX: CELL:
CONTRACTOR NAME: --r- R ,.
ZIP: 9Qp / ('Q
MAILING ADDRESS:
CITY:
STATE: ZIP:
PHONE:
FAX:
CELL:
CONTRACTOR LICENSE No.:
EXPIRES: CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
Shop &X x /(Q. SDrp .Q AJ J- Ez)iSruiSS purpoS -e
poke br)116( "nfs
* ** *YOU MUST COMPLETE THE FOLLOWING * * **
MARK N/A IF NOT APPLICABLE
Height to Peak:
Dimensions:
No. of Stories:
Total Habitable
Space:
Main Floor SQ FT:
Upper Floor SQ FT:
Unfinished Basement SQ
FT:
Finished Basement SQ
FT:
Garage SQ FT: 0 L.
1 ®v C=+
Deck /Covered Patio SQ
FT:
Impervious Surface
Area:
30% Slopes on
Property:
No. of uedrooms:
Construction Type:
Heat Source:
Sewer or Septic:
TOTAL COST OF PROJECT: $
Z-q oao
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is /will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be rec)y.ir6d to be submitted and subsequently a proved before this application can be processed.
Signature
Date: ` '- — L (
Updated 1 -11 -11 Page 1 of 1
http: / /www.spokaneval ley.org /filestorage/ 124/938/210/948 / 1496 /Building_ Permit _- _Residential_11- 11- 11.doc
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
❑ SITE PLAN
❑ Property lines and dimensions
❑ Direction arrow pointing North and orientation to streets
❑ Proposed /existing buildings (footprint and dimensions)
❑ Utilities, septic tank /drain field locations and distances
❑ Setbacks to property lines
❑ Distance between buildings
❑ Right of way /easement location & sizes
❑ Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
❑ Elevations (Front/Rear /Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
❑ Footing sizes and locations
❑ Perimeter concrete foundation wall sizes
❑ Crawlspace ventilation
❑ Supporting wood cripple walls or beams
❑ Thickened concrete pads supporting
beams or girder trusses
❑ Floor Plan of each level (finished or unfinished) with dimensions:
❑ Floor Joist direction, size and spacing
❑ Header, beam or concrete lintel sizes
❑ Brace wall panel locations
❑ Water heater and furnace locations
❑ Exhaust fan locations
❑ Deck or concrete patio sizes and locations
❑ Roof Plan:
❑ Engineered truss direction and spacing
❑ Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
❑ Slope/ roofing material/ underlayment/ ice dam protection
❑ Sheathing size and type
Ceiling
❑ Joist size and spacing
Wall
❑ Height/ top plate/ stud size and spacing/ sole plate
❑ Exterior sheathing size and type
Floor
❑ Joist size and spacing.
Foundation Wall
❑ Concrete or Masonry unit width
❑ Earth to wood separation distance
Footing
❑ Size
Radon
❑ Passive system with 6mil vapor barrier
Miscellaneous Construction Details
❑ Deck:
❑ Floor plan/ side view/ dimensions
❑ Floor Joist/ decking direction, size and spacing
❑ Stairway tread rise & run and nosing
❑ Window and door location and sizes
❑ Window well locations if applicable
❑ Room usage labels
❑ Smoke detector locations
❑ Attic and crawl space access locations
❑ Fire Wall construction
❑ Ridge, eave and valley lines
❑ Beam and girder size and location
❑ Truss or rafter size, spacing & connection
❑ Attic insulation/ air space baffle/ ventilation
❑ Size of ceiling gypsum wall board
❑ Siding/ exterior house wrap/ anchor bolts
❑ Insulation, vapor barrier, gypsum wall board
❑ Sheathing or concrete floor size/ insulation
❑ Footing bottom to finished ground level depth
❑ Horizontal & vertical reinforcement if any
❑ Reinforcement if any
❑ Active system with 6 mil vapor barrier
❑ Footings/ post/ and beam size and locations
❑ Handrail / Guard height & spacing
ldJa UNINNVld
(so'
1200
10
Heather Morris
From: Halsey, Lance [LHalsey @spokanecounty.org]
Sent: Wednesday, August 10, 2011 8:54 AM
To: Permit Center
Subject: RE: 18016 E ALKI - 11002335 - POLE BLDG
Signed off in PLUS- Thanks, Lance.
From: Jenna Davis Lmailto jdavis@spokanevalley.org] On Behalf Of Permit Center
Sent: Tuesday, August 09, 2011 1:06 PM
To: Meyer, Eric; Warne, Patty; Halsey, Lance; Hemken, Tom
Cc: Mike Turbak; Permit Center
Subject: RE: 18016 E ALKI - 11002335 - POLE BLDG
H i,
The customer came in wondering the status on this permit and we have yet to hear back from you guys. Could
you please call the applicant Jaime @ 208 -704 -0137 if there are conflicts, thanks!
Jenna Davis, CUT
!Permit Specialist
City of Spokane valley
11703E Sprague ,Ave ST C -3
Spokane vallev, Wa 120C
(5C1)720 -530)
.iclavis spckanevallev.orQ
From: Jenna Davis
Sent: Thursday, August 04, 2011 3:31 PM
To: Meyer, Eric; (PWarne @spokanecounty.orq); (LHalsey@spokanecounty.orq); Tom Hemken
(THemken @spokanecounty.org)
Subject: 18016 E ALKI - 11002335 - POLE BLDG
Hello there!
Please review the attached application and notify us once your review is complete. Thanks O
Jenna Davis, CUT
Uermit Specialist
City of Spokane Valley
11703E Sprague ,Ave ST U -3
Spokane
Val1ey
Site Address: 18016 E ALKI AVE
Parcel Number: 55184.1439
Zoning: R -3
Fire District: FD 01
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
New project
Previous pre -app meeting ❑
Plan revisions ❑
Transmittal Date:
Thursday, August 04, 2011
Project Number: 11002335
Water District: CONSOLIDATED ID #19
Applicant:
e -mail:
Contact:
e -mail:
ALLEN, JAMIE C & MELISSA M
18016 E ALKI AVE
GREENACRES, WA 99016
(000) 000 -0000
ALLEN, JAMIE C & MELISSA M
18016 E ALKI AVE
GREENACRES, WA 99016
(000) 000 -0000
Contractor: OWNER
( ) - 0
Owner: ALLEN, JAMIE C & MELISSA M
18016 E ALKI AVE
GREENACRES, WA 99016
e -mail:
Occupant:
e -mail:
Arch / Engineer:
e -mail:
Project 30 X 40 STORAGE BUILDING
Please send all plan review and project comments via e-mail to the
highlighted individuals.
Building
Landuse
Engineer
Utilities
Health
Fire Dist
Assessor
APPLICATION
SITE PLAN
PLANS
/tom/
Please send all plan review and project comments via e-mail to the
highlighted individuals.
Splikane
4,0Valleye
Target Date sheet
For City Use Only,
PLUS Project 1 1 C )
Project Address ^^ fr
11703 E Sprague Ave Suite B -3 • Spokane Valley WA 99206
509.720 -5240 • Fax: 509.688.0037 • permitcenter®spokanevalley.org
As part of our on -going commitment to customer service during the review process of your project application, we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
> Submit complete, accurate plans and documents.
Extra time may be required for re- submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your
target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre - Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review.
Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick -up. Information regarding fees and pre - construction meetings (if required) will be provided by the Permit Specialist at
that time.
CD -003 V -7/ 06 -21 -11 Page 1 of 1