2012, 07-03 Permit: SW-12001666 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW- 12001666
Permit Issued Date:
07/03/2012
Expiration Date:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
GREENHAVEN PHASE III
SEWER
Primary Contact:
Applicant:
Address:
Phone:
Email:
BOUCHER CONSTRUCTION LLC
BOUCHER CONSTRUCTION LLC
10 N HARMONY RD
GREENACRES, WA 99016
509 - 953 -3274
SITE INFORMATION:
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
Zoning:
18518 E ALKI AVE
55184.0709
CORBIN ADDITION
CORBIN ADD GRNACRS PRT OF B7 -9 BEG 350FT
W OF EL &223FT S OF PROD NL OF B7 N223FT
W195FT S223FT E195FT TO POB
Water District:
Consolidated Irrigation
District #19
Owner:
Address:
Phone:
Email:
CLARK, ALISON S
18518 E ALKI AVE
GREENACRES, WA 99016 -9505
Fire District: Spokane Valley Fire
Land Area: 43485 Square Feet
CONTRACTOR INFORMATION:
General Contractor
BOUCHC *954P5
BOUCHER CONSTRUCTION LLC
10 N HARMONY RD
GREENACRES, WA 99016
509 - 953 -3274
DETAILS:
Class
SEWER
Type
Quantity Unit Charge Value
SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
CALL 1- 800 - 424 -5555 BEFORE YOU DIG - -AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 07/03/2012 08:22:08
Printed by: IIS APPPOOLASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW- 12001666 07/03/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477 -3604 FROM 8:30 -5:00 MONDAY - FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30- MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 07/03/2012 08:22:08
Printed by: IIS APPPOOL\ASP.NET v4.0