2012, 10-24 Permit: SW-12002433 Sewer SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number:SW-12002433 10/24/2012
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: LAUER EXCAVATION&CONST
Project Name: GREEN HAVEN PH 3 Applicant: LAUER EXCAVATION&CONST
Permit Type: SEWER Address: PO BOX 11581
SPOKANE VALLEY,WA 99211
Phone: 509-981-7954
Email:
SITE INFORMATION:
Site Address: 18306 E ALKI AVE Owner: BADINGER,JENNIFER A
Parcel Number: 55184.1112 Address: 18306 E ALKI AVE
GREENACRES,WA 99016-9371
Subdivision: CORBIN ADDITION Phone:
Assessor's Description: CORBIN ADD TO GREEN ACRES E65FT OF Email:
FOLLOWING DESC;PTN BLK 11 &VAC ST ADJ
LT 1 < 2 BEG 33.30FT S&194FT E OF NW
COR LT 6,TH E ON LN PARA WITH LN OF LT 6&
SD LN EXTD El 36FT,TH N PARA WITH WL LT
Inspection Area:
Water District: Fire District:Spokane Valley Fire
Consolidated Irrigation
District#19
Zoning: Land Area: 11875 Square Feet
CONTRACTOR INFORMATION:
General Contractor
LAUEREC931DA
LAUER EXCAVATION&CONST
PO BOX 11581
SPOKANE VALLEY,WA 99211
509-981-7954
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $25.94
Utilities Permit $125.00
Total Fee: $150.94
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Date Printed:10/24/2012 13:29:03 Printed by:IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12002433 10/24/2012
Expiration Date:
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED.PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:10/24/2012 13:29:03 Printed by:IIS APPPOOL\ASP.NET v4.0