Resolution 08-022 Amending Master Fee Schedule for 2009 CITY OF SPOKANE VALLEY
SPOKANE COUNTY,WASHINGTON
RESOLUTION NO 08-022
A RESOLUTION OF THE CITY. OF SPOKANE VALLEY, SPOKANE COUNTY,
WASHINGTON, AMENDING RESOLUTION 07-017, AND APPROVING AN AMENDED
MASTER FEE SCHEDULE
WHEREAS, it is the general policy of the City to establish fees that are reflective of the cost of
services provided by the City, and
WHEREAS, the City uses a resolution to establish fees for City programs permits and services
and periodically the fee resolution must be updated to Incorporate new or modified services,and
WHEREAS,Council desues to modify the Resolution and accompanying Fee Schedule
NOW THEREFORE, be it resolved by the City Council of the City of Spokane Valley, Spokane
County, Washington,as follows
Section 1 The changes needed at this time are incorporated into the attached schedules and
include(1)new fees (2)changes to existing fees, and (3) inflationary increases for 2009
Section 2 Repeal To the extent that previous fee schedules are inconsistent with those set
forth herein,they are repealed
Section 3 Effective Date This Resolution shall be in full force and effect on January 1,
2009
Approved this 9th day of December,2008
ATTEST CITY OF '• •NE VALLEY
•
Christine :ainbridge ity Clerk ' ich. s Munson, Mayor
Approved as to form
C
Office,of trki City Attorn
Resolution 08 022 Fec Resolution for 2009 Page 1 of 16
MASTER FEE SCHEDULE
Fee Schedule Page No
Schedule A Planning 3
Schedule B Building 5
Schedule C Fire Code 11
Schedule D Parks&Recreation 13
Schedule E Administrative 16
Schedule F Other Fees 16
Resolution 08 022 Fee Resolution for 2009 Page 2 of 16
MASTER TEE SCHEDULE
Schedule A—Pluming
AMENDMENTS
Comprehensive Plan amendment $1,500
Zoning or other code text amendment $1 500
APPEALS
Appeal of Administrative Decision $1,050
Appeal,of Hearing Examiner findings $315
1 ranscnpt/record deposit fee on appeals of Hearing $157
Examiner's decisions
ENVIRONMENTAL REVIEW
State Environmental Policy Act(SEPA)
Single dwelling(when requited) $100
All other developments $350
Environmental Impact Statement(EIS)Review mm $2,200
deposit
Addenda of existing EIS Review $350
Shoreline
Substantial Development Permit $840
Critical Areas
Floodplain Permit $315+ $52 Per lot
OTHER PERMITS
Home Occupation Permit&Acc Dwelling units $84
Conditional Use Permit $840
Temporary Use Permit $157
LAND USE ACTIONS
Subdivisions
Preliminary plat $2 324 Plus $40 00 per lot
final plat $1 424 Plus$10 00 per lot
Time extensions—file review and letter $80
Short Plats
Preliminary 2-4 lots $1,224
final Plat 2-4 Lots $924
Preliminary plat 5 9 Lots $1,424 Plus$25 per lot
Final Plat 5-9 Lots $1,224 Plus$10 per lot
Time extensions—file review and letter $80
Resolution 08 022 Fee Resolution for 2009 Page 3 of 16
Plat Alteration
Subdivision plat $682
Short plat $278
Binding Site Plan
Binding site plan alteration $1 474
Change of Conditions $650
Preliminary binding site plan $1,674
Final binding site plan $924
Aggregation/Segregation
Lot line adjustment $105
Lot line elimination $105
Zero lot line $105 Plus $10 per lot
Plat vacation $1,474
SIGNS
Review of permanent sign $50 Plus $25 if Public
Works revs v is
needed
Review of temporary sign $50
SITE PLAN REVIEW $550
STREET VACATION APPLICATION $1,365
OTHER
Admmistratne Exception $315
Variance $1,575
Preapplication Meetings $250
Deducted from land use application fee if application
is filed within 1 year of preapplication meeting
Administrative Interpretations $100
ZONING
Zoning map amendments(rezone)* $1,650
Planned resi development plan $1,575 Plus $26 per lot
Planned resi Development modification $525
Zoning letter $210
If rezone is combined with other action(s),cost of other
action(s) is additional
Resolution 08 022 Fee Resolution for 2009 Page 4 of 16
Schedule B-Building
Fee Payment
Plan review fees are collected at the time of application Such fees may be adjusted during plan review
Overages or under payments will be appropriately adjusted at the time of permit issuance
Plan review fees are separate fi om and additional to building permit fees
Permit fees and any other unpaid fees are collected prior to issuance of the permit
Fees for outside professional services required during the permit process will be paid by the applicant
Examples of outside professional ser%ices include review by contract reviewers, special inspection or
construction services,consultant services for special topics surveying or other services required to
determine compliance with applicable codes
Fee Refund Policy
Plan review fees are non refundable once any plan review work has been started
Permit fees are non-refundable once work authorized by the permit has begun
Applicants/permit holders of projects eligible for refund must request a refund in writing v‘'thin 180
calendar days of application submittal or permit issuance
Requests received after 180 calendar days are not eligible for refund
Plan review fees will be refunded at a rate of 100% less $35 00 administrative fee when eligible for
refund
Permit fees will be refunded at the rate of 95% with at least one hour of staff time retained (as designated
in this schedule)whichever is greatest when eligible and requested within calendar 180 days of permit
issuance
FEES
GENERAL
1-hourly rate for City Employees $61
Overtime rate for City Employees(1 5 times regular rate) $92
Investigation fee Work commenced without required permits Equal to permit fee
Replacement of lost permit documents Hourly rate 1 hr min
Revisions to plans requested by the applicant or permit holder will be charged the hourly rate with a
minimum of one hour (Revised plans submitted in response to reviewer correction letters are not subject
to the hourly assessment)
Washington State Building Code Council Surcharge(WSBCC) $4 50/permit
WSBCC Surcharge(Multi-Family) $4 50 first dwelling
unit+$2 00 each
additional unit
Resolution 08 022 Fee Resolution for 2009 Page 5 of 16
BUILDING PERMIT
Building permit fees for each project ale set by the following fee schedule The table below is to be used
to determine the building permit fees and plans check fees based on the value of the construction work as
stated by the applicant or the value calculated by the Building Official using the latest valuation data
published in the Building Safety Joutnal by the International Code Council, whichever value is greatest
Valuations not listed in the Building Safety Journal
Building Type Valuation per square foot
Residential garages/storage buildings(wood frame) $ 19 sf
Residential garages(masonry) $22 sf
Misc residential pole buildings $ 19 sf
Residential carports decks,porches $ 15 sf
Building Permit Fee Calculation Table
Total Valuation Building Permit Fe
$1 to$25,000 $69 25 for the first$2,000 plus$14 for each additional $1,000,or
fraction thereof, up to and including$25,000
$25 001 to$50 000 $391 25 for the first$25,000 plus$10 10 for each additional $1 000
or fraction thereof, up to and including$50,000
$50,001 to$100,000 $643 75 for the first$50,000 plus$7 for each additional $1,000,or
fraction thereof, up to and including$100 000
$100,001 to $500,000 $993 75 for the first$100,000 plus$5 60 for each additional $1,000,
or fraction thereof, up to and including$500,000
$500,001 to$1,000,000 $3,233 75 for the first$500,000 plus $4 75 for each additional$1,000
or fraction thereof, up to and including$1 000 000
$1,000,000 and up $5,608 75 for the First$1 000,000 plus$3 15 for each additional
$1,000, of fraction thereof
Plan Review Fee Calculation Table
Plans review fee(general) 65% Of bldg permit fee
Plans review fee—Group R-3 occupancies(single family less than 40% Of bldg permit fee
7,999 sq ft)
Plans review fee—Group R-3 occupancies(single family 8,000 sq 65% Of bldg permit fee
ft or greater)
Plans review fee—U 1 or U-2 occupancies(sheds,barns,etc) 25% Of bldg permit fee
Initial Plan Review Fees are capped at$35,000 not including pass through expensts for outside review as
noted in the"Fee Payment section of this schedule
Resolution 08 022 Fee Resolution for 2009 Page 6 of 16
OTHER BUILDING PERMITS
Over the Counter Service $61 (flat fee)
Demolition Permit
Single Family Residence $46(flat fee)
Commercial buildings $131 (flat fee)
Garage or accessory building associated with a residence or $21 (flat fee)
commercial building
Foundation Only 25%of bldg permit fee
Swimming Pools,over 5,000 gallons $52 plus plumbing fees
Re roof Permit No plan review fee v‘ill be charged unless Based on project valuation
plans are submitted for review
Change of Use or Occupancy Classification permit Hourly
Towers, EleN ated tanks antennas 1-Hourly
GRADING PERMIT
Cubic Yards Grading Permit Fee
100 or less $21
101 to 1 000 $21 for the first 100 Cu Yd, plus$7 00 for each additional 100 Cu Yd
1 001 to 10,000 $88 for the first 1,001 Cu Yd , plus$6 00 for each additional 1,000 Cu
Yd
10 001 to 100 000 $154 for the first 10,000 Cu Yd plus$15 00 for each additional 10 000
Cu Yd
100,001 to 200 000 $386 for the fii st 100,000 Cu Yd plus$15 00 for each additional 100,000
Cu Yd
200,000 or more $528 for the first 200,000 Cu Yd plus$15 00 for each additional 200,000
Cu Yd
GRADING PLAN REVIEW FEE
Cubic Yards Plan Checking Fee
50 or less No fee
SIto100 $12
101 to 1,000 $21
1,001 to 10,000 $27
10 001 to 100,000 $27 for the first 10,000 Cu Yd plus$7 for each additional 10,000 Cu Yd
100,001 to 200,000 $104 for the first 100,000 Cu Yd plus$6 for each additional 100,000 Cu
Yd
200,001 or more $166
Land Clearing only(without earth being moved) $68
Paving Permit(greater than 5,000 SF—new paving only) $263
Resolution 08 022 Fee Resolution for 2009 Page 7 of 16
MECHANICAL PERMIT
Plan review fees for mechanical permits will be collected at application as noted in the `Fee Payment"
section of this schedule Permit fees will be collected when the permit is issued If submitted as part of a
building permit application, the unit costs are added,but not the `basic fee for issuing the permit
Mechanical Permit Fees
A Basic fees
1) Basic fee for issuing each permit $37
2) Basic for each supplemental permit $8
Unit fees(in addition to the basic fee)
B
I) Furnaces&suspended heaters-Installation or relocation
a up to and including 100,000 btu $13
b over 100,000 btu $16
2) Duct work system $11
3) Heat pump&air conditioner
a Oto3tons $13
b over 3 to 15 tons $21
c over 15 to 30 tons $26
d over 30 to 50 tons $37
e over 50 tons $63
4) Gas water heater $11
5) Gas piping system $1 Per outlet
6) Gas log, fireplace,and gas insert installation $11
7) Appliance vents installation, relocation, replacement $10 Each
8) Repairs or additions $16
9) Boi lei s,compressors,and absorption systems
a 0 to 3 hp— 100,000 btu or less $13
b Over 3 to 15 hp— 100,001 to 500,000 btu $21
c Over 15—30 hp—500,001 to 1,000,000 btu $26
d over 30 hp— 1 000 001 to 1,750 000 btu $37
e over 50 hp—over 1 750 000 btu $63
10) Air Handlers
a Each unit up to 10 000 cfm including ducts $13
b Each unit over 10 000 cfm $16
11) Evaporative Coolers(other than portable) $11
12) Ventilation and exhaust
a Each fan connected to a single duct $11
b Each ventilation system $13
c Each hood served by mechanical exhaust $13
Resolution 08-022 Fee Resolution for 2009 Page 8 of 16
13) Incinerators
a Installation or relocation of residential $21
b Installation or relocation of commercial $23
14) Appliances,each $11
1 S) Unlisted appliances
a under 400,000 btu $52
b 400,000 btu or over $105
16) Hood
a Type I $52
b Type ll $11
17) L P Storage tank $11
18) Wood or Pellet stove insert $11
19) Wood stove system—free standing $26
PLUMBING PERMIT
Plan review fees for mechanical permits will be collected at application as noted in the Tee Payment'
section of this schedule Permit fees will be collected when the permit is issued If submitted as part of a
building perriiit application,the unit costs are added, but not the"basic"fee for issuing the permit
A Basic fees
1) Basic fee for issuing each permit $37
2) Basic for each supplemental permit $8
Unit fees(in addition to the basic fee)
B
1) For each plumbing fixture on a trap(including garbage disposals,dish washers, $6
back flow device, drainage, hot tubs,built in water softener,water closets,
lavatories,sinks,drains,etc)
2) Private sewage disposal system $21
3) Water heater $6 Each
4) Industrial waste pretreatment interceptor including its trap and vent,except kitchen $16
type grease interceptors functioning as fixture traps
5) Repair or alteration of water piping drainage or vent piping $6 Each
fixture
6) Atmospheric type vacuum breaker $6 Each
7) Backflow protective device other than atmospheric type vacuum breakers $6 Each
8) Medical gas $6 Per
outlet
9) Interceptors $6 Each
Resolution 08 022 Fee Resolution for 2009 Page 9 of 16
RIGHT-OF-WAY PERMIT
A traffic plan and traffic plan revieu is required if more than 50%of the width of any street IS closed or if
a single arterial lane is closed A minimum plan review fee of $61 (hourly rate for city employees)
applies to all ROW permits that require a traffic plan If additional staff time is required, it will be
charged at the hourly rate
Category
1 Non cut obstruction without clean-up $73
2 Non cut obstruction with clean-up $110
3 Pavement cut obstruction non-winter $168
4 Pavement cut obstruction,winter $210
5 Approach Permit $52
SIGN PERMIT
Sign permits aie subject to assessment of planning division review fees as found in Schedule A-
Development Sign Permits are also subject to the assessment of the WSBCC fee as noted in General"
section of Schedule B
Signs mounted on buildings $48 per sign(flat fee)
Sign and pole mounting $68 per sign(flat fee)
Resolution 08 022,Fee Resolution for 2009 Page 10 of 16
Schedule C-FIRE CODE
FIRE ALARM,SPRINKLER AND OTHER PROTECTION SYSTEMS
City processing fee of$37 is added to these Fire District 1 fees
Plans check and review fees, inspections, and permit for installation of separate fire alarm system or
sprinkler system applications,and other fire protection systems
Fire Alarm System
New installation
1-4 devices $165
5 100 devices $275
Additional 100 devices $ 55
Each additional panel $44
Sprinkler supervision only $ 83
Each additional floor $44
Fire Sprinkler Systems
1 9 heads $ 58
10-49 $182
50-100 $303
101-200 $358
201-300 $385
301 400 $413
401 500 $468
500+ $550+$36 per head
For hydraulically designed systems multiply the above fee by 2
Ne» Suppression Systems
Range hoods baton,CO2,dry chemical, FM 200, intergen spray booths,etc
Unit 1-5 nozzles $110
Over 5 nozzles $110+$11 per nozzle
Bottle(s) $33 per bottle
Fire Pump Installation
Plan review& inspection fee $550
Underground Fire Mains—Plan review and inspect $165
Standpipes not a part of automatic suppression system
Plan review and inspection $165
Resolution 08 022 Fee Resolution for 2009 Page 11 of 16
Other Protection Systems
Fire extinguishing system (other than sprinklers) $ 55
plus$1 50 per nozzle
Standpipe installation
Class I and Class iI $64
Class III $ 77
Tank installation-per tank
flammable and combustible liquids-storage
tanks installation $ 70
Hazardous materials—storage tanks installation $ 70
Liquefied petroleum $ 70
Gaseous oxygen systems $70
Nitrous systems $ 70
Medical gas systems $ 70
Hazardous material recycling systems $ 70
Vapor recovery system $ 70
Cryogenic $ 70
Removal,abandonment or any combination
thereof of flammable or combustible
liquid storage tanks $ 105
Emergency or standby commercial power generator install $ 70
PERMITS
Conditional Use Permit $ 70
Temporary Use Permit $ 70
Tents/canopy Permit $ 70
Event Permit TBD
PLANS CHECK AND REVIEW BY THE BUREAU OF FIRE PREVENTION
New commercial plans check and inspection(for projects not mentioned elsewhere) $ 60
LAND USE
Subdivision/PUD
Preliminary $140
renal $ 70
Short Plat
Preliminary $140
Final $ 70
Resolution 08 022,Fee Resolution for 2009 Page 12 of 16
Schedule D—PARKS&RECREATION
ADMINISTRATIVE FEES
Basic fees to be considered when applying rates
Administrative Fee $32
Refuse Fee $52
AQUATICS
Pool admission (age 5 and under) free
Pool admission(age older than 5) $1
Pool punch pass(25 swims) $20
Weekend family discount 1 child under 13 free
with paying adult
Swimming Lessons $30
Swim Team Fee $35
Reservation(less than 50 people) $105 Per hour*
Food fee(if applicable) $25
Reservation(50— 100 people) $131 Per hour*
Food fee(if applicable) $52
Reservation (101 — 150 people) $157 Per hour*
Food fee(if applicable) $79
*Minimum 2 hour s
ALCOHOLIC BEVERAGE PERMIT
Alcoholic Beverage Permit Fee $10
CENTERPLACE
Conference Center Wing
Auditorium $79 Per hour
Auditorium $475 Per day
Auditorium $236 Per half day
Auditorium w/Presentation System $52 Per hour *
Auditorium w/Presentation System $315 Pei day *
Auditorium w/Presentation System $158 Per half day *
Auditorium Deposit $52
Executive Conference Room $52 Per hour
Executive Conference Room Deposit $52
Meeting Room (Day& Evening Use) $42 Per hour
Meeting Room $263 Per day
Large Meeting Room $75 Per hour
$225 Per half day
$450 Per 9 hr day
Meeting Room $131 Per half day
Meeting Room Deposit $52
* Requires rental of presentation system on page 14
Resolution 08 022 Fee Resolution for 2009 Page 13 of 16
Great Room
Kitchen w/Dining Room Rental $105 Per use
Kitchen—Commercial Use(2 hour min ) $52 Per hour
Kitchen Deposit $52
Multi-Use/Banquet Hall $105 Per hour
Multi-Use/Banquet Hall $840 9 hr session
Multi Use/Banquet Hall $1 575 All day(6am-lam)
Small Dining Area $52 Per hour
Deposit $210
Stage $21 Per section per day
Stage Removal $150
Table Settings(linens&tableware) $3 Per place setting
Senior Center Wing
Lounge with Dance Floor $105 Per hour
Lounge with Dance Floor $840 Per day
Lounge Deposit $210
Meeting Room (Evening Use) $42 Per hour
Meeting Room(Evening Use) $131 4 hr session
Meeting Room(Weekend Use) $262 Per day
Meeting Room (Weekend Use) $131 Per half day
Meeting Room Deposit $52
Private Dining Room $52 Per hour
Private Dining Room Deposit $52
Wellness Center $105 Per hour
Miscellaneous
Cleanup fee $52-315 Per event
Host/Hostess(after hours) $16 Per hour
Presentation System (includes projector/podium/ $262 Per day
DVDNCR/sound system/camera system)
Room Setup $26 Per hour
Satellite Video Conferencing $262 Per hour
Sound System $42 Per day
Technical Support $42 Per hour
Television/VCR $79 Per day
Touch Pad Voting System $121 Base station per day
+$16 Per keypad per day
Per hour
LCD Projector $25 Per day
$100 Service
Coffee Service $25 Table
Linens only $5 Per Glass
Wine glass only rental $ 50
Resolution 08 022 fee Resolution for 2009 Page 14 of 16
EVENTS—includes Pavilion
Events include but are not limited to activities such as car shows, tournaments and activities involving
200 or more people The Director of Parks and Recreation will make the final determination
General Fee $157
Non-profit applications $84 Or free with
sponsorship*
SPECIAL EVENTS
Per Spokane Valley Municipal Code 5 15 010,1 e National Night Out $5
FIELD RENTAL
Use Fee $26 First hour plus$15
each additional hour
INDOOR USE
Open gym admission $2
Playground program admission(10 entries) $21
MIRABEAU
Mirabeau Springs
Small shelter and waterfall $157 Maximum 4 hours
Refundable deposit(less than 200 people) $52
Mirabeau Meadows
Shelter(less than 200 people) $84
Shelter(200 or more people) $157
Refundable deposit(less than 200 people) $52
Refundable deposit(200 or more people) $257
PICNIC SHELTERS
Picnic Shelter(less than 200 people) $50
Picnic Shelter(200 or more people) $157
Refundable deposit(less than 200 people) $52
Refundable deposit(200 or more people) $257
PROFESSIONAL PHOTOGRAPHY
Permit Fee $26 Annual
RECREATION
Recreation program fees are set to recover costs as specified in the Parks and Recreation revenue policy
VALLEY MISSION ARENA
Rental* $105 Per weekend
Refundable deposit $52
'`Renter i esponsible fat on-site pi eparation Rental requires liability nnsui ance
Resolution 08 022 Fee Resolution for 2009 Page of 16
Schedule E-ADMINISTRATIVE
COPY FEES
Cop) of audio tapes, video tapes, photos maps or other At cost
records needing reproduction
Copy of written records(per SVMC 2 75 070) $0 15 Per page
Copy—Large format $3 Per page
Copy of full documents At cost
OTHER ADMINISTRATIVE FEES
NSF Check $26
Schedule F-OTHER FEES
ADULT ENTERTAINMENT FEES
Establishment Licenses
Live Adult Entertainment $1,575
Adult Arcade $1,575
Other Adult Entertainment Licenses
Adult Arcade Device License $157
Manager License $157
Entertainer License $157
Late License Fee—Charged in addition to license fee
Percent of
Past Due Calendar Days License Fee
7-30 25%
31 —60 50%
61 and over 75%
BUSINESS REGISTRATION FEES
Business registration $13 each year
Nonprofit registration $ 3 each year
SECURITY FALSE ALARM FEES
Repeated malfunctioning security false alarms in a given six month period
First alarm No charge
Second alarm $32
Third alarm $74
Fourth and subsequent alarms $126
STORM WATER UTILITY CHARGE ON DEVELOPED PARCELS
Each single-family unit each year $21
All other properties each $21 Per 3,160 square feet
of impervious surface
TOW OPERATOR ANNUAL REGISTRATION FEE $105
OVERSIZED LOAD PERMIT FEE $26
Resolution 08 022 Fee Resolution for 2009 Page 16 of 16