Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2009, 04-28 Permit App: 09001104 Deck
crry or Spokane Valley Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B -3 Spokane Valley, WA 99206 / KANE VALLEY (509)688 -0036 FAX: () �$$ -000 www.spokanevalley.org APR 2 8 2009 PERMIT NUMBER: l —if 04 PERMIT FEE: VLI�ii91j II*' 0v Ionstruction Accessory Bldg Addition/Remodel j1 Deck Other: SITE ADDRESS: RIO 2 / /V �� R C ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: g DIMENSI S: # OF STORIES: Name: S3`tt.4i U % i /eel 4A/ 21 FL 40g-SQ. SQ. FTG: /Y / Address: iy6 ////, C— l.." City: S J State: Wfi Zip: 9,90/4/ Phone: Fax: CONSTRUCTION TYPE: �`-' f' Contact Person A.� OV�'Pi)p "`P Name: Phone: ,2,2‘- 0213 Describe the scope of work in detail: Contractor: g DIMENSI S: # OF STORIES: Name: MAIN FLOOR TO SQ. FTG: 21 FL 40g-SQ. SQ. FTG: /Y / Address: IMPERVIOUS SURFACE AREA: 4( /9 l.." City: - State: Zip: Phone: -'r Fax: CONSTRUCTION TYPE: �`-' f' Contractor is No: Exp Date: Cityusiness Lic. No: Cost of Project: $ / ©D D i Proposed Use:it.A,o -- >�v/ * * * * * * ** *The followin MUST be complete: (write N/A if not applicable ) * * * * * * * * * * * * * * * * * * * * ** HEIGHT TO EAK: g DIMENSI S: # OF STORIES: TOTAL HAI7 BLE SPACE: MAIN FLOOR TO SQ. FTG: 21 FL 40g-SQ. SQ. FTG: /Y / UNFIW ASEMENT SQ. FTG: IMPERVIOUS SURFACE AREA: 4( /9 l.." ■" FINISH BASEMENT SQ. FTG: GARAG S!@. FTG: A? i ' Q- CK/C`OV. PATIOS TG.. / 2 )C /6" f' S 30% SLOPES ON 30 /o PROPERTY: # OF BEDRQQ1S: /V/ CONSTRUCTION TYPE: �`-' f' HEAT SOU E: �� SEWER OR PTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is /will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinance . 6) P - or additional information may be required to be submitted, and subsequently approved before this application can be.p(oc se' SIGNATURE: DATE: Method of Payme t: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 ❑ Check ❑ Mastercard Expires: ❑ VISA VIN #: • RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. ❑ SITE PLAN ❑ Property lines and dimensions ❑ Setbacks to property lines ❑ Direction arrow pointing North and orientation to streets ❑ Distance between buildings ❑ Proposed/existing buildings (footprint and dimensions) ❑ Right of way/easement location &sizes ❑ Utilities, septic tank/drain field locations and distances ❑ Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear/Sides)with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): ❑ Footing sizes and locations ❑ Supporting wood cripple walls or beams ❑ Perimeter concrete foundation wall sizes ❑ Thickened concrete pads supporting ❑ Crawlspace ventilation beams or girder trusses ❑ Floor Plan of each level (finished or unfinished)with dimensions: ❑ Floor Joist direction, size and spacing ❑Window and door location and sizes ❑ Header, beam or concrete lintel sizes ❑ Window well locations if applicable ❑ Brace wall panel locations ❑ Room usage labels ❑Water heater and furnace locations ❑ Smoke detector locations ❑ Exhaust fan locations ❑ Attic and crawl space access locations ❑ Deck or concrete patio sizes and locations ❑ Fire Wall construction ❑ Roof Plan: ❑ Engineered truss direction and spacing ❑ Ridge, eave and valley lines ❑ Rafter and over frame direction, size and spacing ❑ Beam and girder size and location ❑ Wall Section Detail including: Roof ❑ Slope/roofing material/underlayment/ice dam protection ❑ Truss or rafter size, spacing &connection ❑ Sheathing size and type ❑Attic insulation/air space baffle/ventilation Ceiling ❑ Joist size and spacing ❑ Size of ceiling gypsum wall board Wall ❑ Height/top plate/stud size and spacing/sole plate ❑ Siding/exterior house wrap/anchor bolts ❑ Exterior sheathing size and type ❑ Insulation, vapor barrier, gypsum wall board Floor ❑ Joist size and spacing ❑ Sheathing or concrete floor size/insulation Foundation Wall ❑ Concrete or Masonry unit width ❑ Footing bottom to finished ground level depth ❑ Earth to wood separation distance ❑ Horizontal &vertical reinforcement if any Footing ❑ Size ❑ Reinforcement if any Radon ❑ Passive system with 6mil vapor barrier ❑ Active system with 6 mil vapor barrier Miscellaneous Construction Details ❑ Deck: ❑ Floor plan/side view/dimensions ❑ Footings/post/and beam size and locations ❑ Floor Joist/decking direction, size and spacing ❑ Stairway tread rise & run and nosing ❑ Handrail /Guard height & spacing Project Number: 09001104 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/30/2009 Page 1 of 2 Project Information: Permit Use: REMODEL DECK 12X16 Contact: THIELER, SHELLY A Address: 1407 N ARC ST C - S - Z: SPOKANE VALLEY, WA 99016 Setbacks: Front Left: Right: Rear: Phone: (509) 000 -0000 Group Name: Site Information: Project Name: Plat Key: CONV Name: CONVERTED CNTY DATA District: Nort Parcel Number: 55182.3601 SiteAddress: 1407 N ARC ST Location:: CSV Block: Lot: Owner: Name: THIELER, SHELLY A Address: 1407 N ARC ST SPOKANE VALLEY, WA 99016 Zoning: R -4 SF Res Urban District Water District: 134 CONSOLIDATED ID #19 Area: 11,040 Sq Ft Nbr of Bldgs: 1 Review Information: Hold: Width: 80 Depth: 138 Right Of Way (ft): 0 Nbr of Dwellings: 1 Review Building Plan Review Released By: Originally Released: 4/29/2009 By: tmelbourn Landuse /Zoning/HE Conditions Permits: Released By: Originally Released: 4/28/2009 By: cjjanssen Operator: jmm Printed By: JD Print Date: 4/30/2009 Project Number: 09001104 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 4/30/2009 Contractor: OWNER Description DECK OPEN Grp Type R -3 VB Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Notes: Building Permit Page 2 of 2 Firm: OWNER Phone: (000) 000-0000 This Application: Total Project: Notes Sq Ft Valuation Su Ft Valuation DECK 192 $2,880.00 192 $2,880.00 REMODEL Totals: 192 $2,880.00 192 $2,880.00 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Permit Total Fees: Fee Amount $83.25 $4.50 $33.30 $121.05 A 6 -FOOT HIGH SIGHT - OBSCURING FENCE MUST BE INSTALLED AROUND PERIMETER OF VALLEY COACH ESTATES SUBDIVISION PRIOR TO ANY BUILDING PERMITS -MH THE FENCE HAS BEEN INSTALLED. BUILDING PERMITS FOR VALLEY COACH ESTATES ARE OKAY -MH Payment Summary: Permit Type Building Permit Fee Amount Invoice Amount $121.05 $121.05 Amount Paid Amount Owing $27.70 $93.35 $121.05 $121.05 $27.70 $93.35 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and /or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 4/30/2009 pokane jUalley, For City Use Only PLUS Project Number ; Project Address 11703 E Sprague Ave Suite B -3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re- submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre - Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick -up. Information regarding fees and pre - construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE - APPLICANT PINK - BUILDING FILE REV 9/07