HomeMy WebLinkAbout2009, 10-22 Permit App: 09003442 ResidenceSpokane
Valley
Community Development
Residential Construction
Permit Application
Permit Center
11703 E Sprague Ave, Suite B -3
Spokane Valley, WA 99206
(509)688 -0036 FAX: (509)688 -0037
www.spokanevalley.org
PERMIT NUMBER:
PERMIT FEE:
f1New Construction
Addition/Remodel
Other:
Accessory Bldg
Deck
SITE ADDRESS:
I7 / p 2— E ,�v 5T- G =/
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner:
w)r GUrc.
# OF STORIES:
Name: n^` /4, /, f /
" xi
MAIN FLOG TO SQ.
FTG: 5 77
2" FLOOR SQ. FTG:
/ 1� 0
/�
Address: � & X 642.5
»6u -//4 614-//04/
/16)",4 % X-
City: v�wAila� i /
' State:0 ¢
Zip: X
325
Phone: fen , 2.2c 72, Fax:
Fax:
AT SOURCE: CSEW OR SEPTIC?
6,x
Contact Person
Name: /; // 1.-y ,AI
Phone: t'e q ?y 78 S�
Describe the scope of work in detail:
Contractor: '
f r 5 >
w)r GUrc.
# OF STORIES:
Name: fi�1 R4... l L y'N,/,,,
MAIN FLOG TO SQ.
FTG: 5 77
2" FLOOR SQ. FTG:
/ 1� 0
Address:p ✓ eise r2
»6u -//4 614-//04/
/16)",4 % X-
City:
State: ��A
Zip: 9 f0 z
Phone: Snct 2 2C 12 yg-
Fax:
AT SOURCE: CSEW OR SEPTIC?
6,x
Contractor Lic No:
Exp Date:
City Business Lic. No:
Cost of Project: $
,2v (_ (�; y /-T d Cf G ay
Proposed Use:
• (write N/A if not applicable ) * * * * * * * * * * * * * * * * * * * * **
...................... .' -- 1 llG 1Vlly
HEIGHT TO PEAK:
C. fT
♦uu� iv ' , i w.....�...r......�..
DIMENSIONS:
# OF STORIES:
TOT/A���TABLE SPACE:
MAIN FLOG TO SQ.
FTG: 5 77
2" FLOOR SQ. FTG:
/ 1� 0
UNFIN BASEMENT SQ. FTG:
.
IMPERVIOUS SURFACE
AREA:
FINISHED BAS EN
SQ. FTG: A /A-
GARAGE SQ. FTG:
5v 4
DEC COV. PATIO SQ. FTG:
30% SLOPES ON
PROPERTY: N ci
# OF BEDROOMS:
3
CONSTRUCTION TYPE:
AT SOURCE: CSEW OR SEPTIC?
6,x
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is /will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE:
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
❑ Check
❑ Mastercard
Expires:
DATE: /, 77,
❑ VISA
VIN #:
if RECEIVED
CSV PERMIT CENTER
OCT 2 2 2009
Project #_ c7iC
Name
Submittal #_
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
❑ SITE PLAN
❑ Property lines and dimensions
❑ Direction arrow pointing North and orientation to streets
❑ Proposed /existing buildings (footprint and dimensions)
❑ Utilities, septic tank/drain field locations and distances
❑ Setbacks to property lines
❑ Distance between buildings
❑ Right of way /easement location & sizes
❑ Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
❑ Elevations (Front/Rear /Sides) with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
❑ Footing sizes and locations
❑ Perimeter concrete foundation wall sizes
❑ Crawlspace ventilation
❑ Supporting wood cripple walls or beams
❑ Thickened concrete pads supporting
beams or girder trusses
❑ Floor Plan of each level (finished or unfinished) with dimensions:
❑ Floor Joist direction, size and spacing
❑ Header, beam or concrete lintel sizes
❑ Brace wall panel locations
❑ Water heater and furnace locations
❑ Exhaust fan locations
❑ Deck or concrete patio sizes and locations
❑ Roof Plan:
❑ Engineered truss direction and spacing
❑ Rafter and over frame direction, size and spacing
❑ Wall Section Detail including:
Roof
❑ Slope/ roofing material/ underlayment/ ice dam protection
❑ Sheathing size and type
Ceiling
❑ Joist size and spacing
Wall
❑ Height/ top plate/ stud size and spacing/ sole plate
❑ Exterior sheathing size and type
Floor
❑ Joist size and spacing
Foundation Wall
❑ Concrete or Masonry unit width
❑ Earth to wood separation distance
Footing
❑ Size
Radon
❑ Passive system with 6mil vapor barrier
Miscellaneous Construction Details
❑ Deck:
❑ Floor plan/ side view/ dimensions
❑ Floor Joist/ decking direction, size and spacing
❑ Stairway tread rise & run and nosing
❑ Window and door location and sizes
❑ Window well locations if applicable
❑ Room usage labels
❑ Smoke detector locations
❑ Attic and crawl space access locations
❑ Fire Wall construction
❑ Ridge, eave and valley lines
❑ Beam and girder size and location
❑ Truss or rafter size, spacing & connection
❑ Attic insulation/ air space baffle/ ventilation
❑ Size of ceiling gypsum wall board
❑ Siding/ exterior house wrap/ anchor bolts
❑ Insulation, vapor barrier, gypsum wall board
❑ Sheathing or concrete floor size/ insulation
❑ Footing bottom to finished ground level depth
❑ Horizontal & vertical reinforcement if any
❑ Reinforcement if any
❑ Active system with 6 mil vapor barrier
❑ Footings/ post/ and beam size and locations
❑ Handrail / Guard height & spacing
Permit Center
� ! 11703ES
mor7 r,�ne Sprague Ave, Suite B -3
Sf
� Spokane Valley, WA 99206
(509)688 -0036 FAX: (509)688 -0037
Community Development permitcenter @spokanevallev.ore
Mechanical Permit Application
PERMIT NUMBER
PERMIT FEE:
Commercial (0'Residential
SITE ADDRESS: / 7 / b !i .A./GL-57-14
Building Owner in
Name:
Address: e‘42
Contractor fl? c r 4
1E '
Name: IeF
Address: � /
L1 D Re;),/ '2 i
License No:
Phone: 22 C ? 2 Y g- Fax:
State: o4
J Phone: 52, ? 22G 2 yg- Fax:
Zip: D2 5_
City Nett" iwur State: ouR
City Business Lic:
Zip: ?To
Contact/Project Manager:
•
Phone:
DCASH ❑ CHECK ❑ VISA ❑ MC
CARD #:
EXPIRES:
SIGNATURE
RECEIVED
CSV PERMIT CENTER
OCT 2 2 2009
Project # �c
http: / /wcvw.spokanevalley.org/uploads/ Community_ Development / Documents / Forms /Building/NlechanicalPermitAp li,55i4403
Submittal #
#UNITS
FURNACES & SUSPENDED HEATERS- INSTALLATION OR RELOCATION
Up to & including 100,000 BTU
1
FURNACES & SUSPENDED HEATERS- INSTALLATION OR RELOCATION
Over 100,000 BTU
DUCT WORK SYSTEM
HEAT PUMP /AIR CONDITIONER
0 -3 TON
AIR CONDITIONER
Over 3 -15 TON
AIR CONDITIONER
Over 15 -30 TON
AIR CONDITIONER
Over 30-50 TON
AIR CONDITIONER
Over 50 TON
GAS WATER HEATER
/
GAS PIPING SYSTEM (each outlet)
?^
GAS LOG, FIREPLACE, & GAS INSERT
APPLIANCE VENTS INSTALLATION, RELOCATION, REPLACEMENT
REPAIRS OR ADDITIONS
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
0 to 3 hp- 100,000 BTU or less
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 3 - 15 hp — 100,001 to 500,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 15 — 30 hp - 500,001 to 1,000,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 30 hp — 1,000,001 to 1,750,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 50 hp — over 1,750,000 BTU
AIR HANDLER (DOES NOT include ducting)
Each unit up to 10,000 dm, including ducts
AIR HANDLER (DOES NOT include ducting)
Each unit over 10,000 dm
EVAPORATIVE COOLERS(other than portables)
VENTILATION AND EXHAUST
Each fan connected to a singe duct
Ili
VENTILATION AND EXHAUST
Each ventilation system
VENTILATION AND EXHAUST
Each hood served by mechanical exhaust
INCINERATORS
Installation or relocation of residential
INCINERATORS
Installation or relocation of commercial
APPLIANCES
-ng= lothes Wash
^—,-�
UNLISTED APPLIANCES
Under 400,000 BTU
UNLISTED APPLIANCES
Over 400,000 BTU
HOOD
Type I
HOOD
Type II
L P STORAGE TANK
WOOD OR PELLET STOVE INSERT
WOOD STOVE SYSTEM — FREE STANDING
DCASH ❑ CHECK ❑ VISA ❑ MC
CARD #:
EXPIRES:
SIGNATURE
RECEIVED
CSV PERMIT CENTER
OCT 2 2 2009
Project # �c
http: / /wcvw.spokanevalley.org/uploads/ Community_ Development / Documents / Forms /Building/NlechanicalPermitAp li,55i4403
Submittal #
Spokane
_fey.
Permit Center
11703 E Sprague Ave, Suite B -3
Spokane Valley, WA 99206
(509)688 -0036 FAX: (509)688 -0037
permiteenter@snokanevalley.org
Community Development
Plumbing Permit Application
PERMIT NUMBER:
PERMIT FEE:
n Commercial [ + Residential
SITE ADDRESS: / 7/ 0 2 f i e U17q 4/
Building Owner
r
Name: /4 ' " �/ �� Phone: Fax:
;
Address: City: / State: Zip:
L
Contractor A/2,,, 6 th-- 413 . 40N.� lJ c<,5,/�
_
Name: in :RE i `tx, Phone: Fax:
Address: PD Box 4/7'5- city: Iva., "4 j , k State: 1,,JA4 Zip: 7.742 2`3
License No: City Business Lic:
Contact/Project Manager.
Name: Phone:
# OF UNITS
PLUMBING FIXTURE ON A TRAP
TOILETS
3
URINALS
TUBS
SHOWERS (per trap)
SINKS
Lav /Basins, Bar, Floor, Kitchen, Laundry, Utility, Janitor, Photo, X -ray, Food,
Prep /Culinary Meat
DISHWASHER
CLOTHES WASHER
GARBAGE DISPOSAL
/
/
WATER SOFTNER
FLOOR DRAIN
Area, Case, Coil, Trench, Condensate
ROOF DRAIN /OVERFLOW DRAINS
FOUNTAIN, DRINKING
WATER PIPING /DRAIN -IN WASTE
Installation, Alterations, Repair, Reversals
WATER USING DEVICE
Ice and /or Coffee maker, hose bib, steamer proofer, carbonator, swamp cooler
/
SEWAGE DISPOSAL SYSTEM
PRIVATE
WATER HEATER
If Gas, See Mechanical
INDUSTRIAL WASTE PRETREATEMENT
INCEPTORS
Including traps, vents except kitchen type grease interceptors functioning as fixture traps
REPAIR OR ALTERATION
Water piping, drainage or vent piping
ATMOSPHERIC TYPE VACUUM BREAKER
BACK FLOW PROTECTIVE DEVICE
Other than atmospheric type vacuum breakers
MEDICAL GAS
INCEPTORS
❑CASH ❑ CHECK ❑ VISA ❑ MC
Card#
SIGNATURE:
EXPIRES:
VIN:
RECEIVED
CSV PERMIT CENTER
OCT 2 2�20�0t9
PrOlect rf �i�F,�k1TI_4 --
CURRENT FEES AVAILABLE AT: http: / /www.spokanevallev.orq/ under the quick links for Forms, Master ee
iNarrle fir
http: / /www. spokanevalley. org/uploads/ Community_ Development / Documents / Forms /Building/PlumbingPermitAppli
Project Number: 09003442 Inv: I
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 10/26/2009
Project Information:
Permit Use: SFR W /ATT GAR
Setbacks: Front
Site Information:
Plat Key:
Left: Right: Rear:
Name: Range
Page 1 of 4
Contact: BRIGHTHOUSE CONSTRUCTION
Address: PO BOX 425
C - S - Z: NEWMAN LAKE WA 99025
Phone: (509) 226 -3248
Group Name:
Project Name:
District: East
Parcel Number: 55073.3103 Block:
SiteAddress: 17102 E AUGUSTA CT
Location:: CSV
Lot:
Owner: Name: LYNN, MICHAEL E & LYNDA A
Address: 8915 E HARRINGTON AVE
SPOKANE, WA 99212-
Zoning: R -4 SF Res Urban District
Water District: 134 CONSOLIDATED ID #19
Area: 6,103 Sq Ft Width: 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Hold: fl
Depth: 0 Right Of Way (ft): 0
Review
Building Plan Review
Released By:
Other Reviews
Originally Released: 10/23/2009 By: tmelbourn
Released By:
CITY BUSINESS LICENSE
Originally Released: 10/22/2009 By: jdavis
Driveway /Approach
Released By:
NOT REQUIRED
Originally Released: 10/23/2009 By: TMELBOU
Operator: JD Printed By: jmm Print Date: 10/26/2009
Project Number: 09003442 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 10/26/2009 Page 2 of 4
Landuse /Zoning/HE Conditions
Released By:
See Conditions
Sewer Review
Permits:
Originally Released: 10/26/2009 By: mbasinger
Released By:
Originally Released: 10/22/2009 By: jdavis
Building Permit
Contractor: BRIGHTHOUSE CONSTRUCTION Firm: BRIGHTHOUSE CONSTRUCTION
Address: PO BOX 425 Phone: (509) 226 -3248
NEWMAN LAKE WA 99025
This Application: Total Project:
Description Gtr Type Notes So Ft Valuation So Ft Valuation
1 &2 FAMILY R -3 VB 570 $55,193.10 570 $55,193.10
2ND FLOOR R -3 VB 1,110 $107,481.30 1,110 $107,481.30
DECK OPEN R -3 VB 122 $1,830.00 122 $1,830.00
GARAGE U -1 VB 504 $9,576.00 504 $9,576.00
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Totals: 2,306 $174,080.40 2,306 $174,080.40
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Fee Amount
$1,413.75
$4.50
$565.50
Permit Total Fees: $1,983.75
Operator: JD Printed By: jmm Print Date: 10/26/2009
Project Number: 09003442 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 10/26/2009
Mechanical Permit
Contractor: BRIGHTHOUSE CONSTRUCTION
Address: PO BOX 425
NEWMAN LAKE WA 99025
Item Description
GAS WATER HEATER
GAS APPLIANCE <= 100,000BTU
GAS PIPING
VENTILATING FANS 1 DUCT
CLOTHES DRYER
RANGE
Contractor:
Address:
Units
1
1
2
4
1
1
BRIGHTHOUSE CONSTRUCTION
PO BOX 425
NEWMAN LAKE WA 99025
Item Description
TOILETS/BIDETS
SINKS
TUBS
DISH WASHERS
GARBAGE DISPOSAL
CLOTHES WASHER
FLOOR DRAINS
MISCELLANEOUS FIXTURES
Page 3 of 4
Firm: BRIGHTHOUSE CONSTRUCTION
Phone: (509) 226-3248
Unit Desc
NUMBER OF
NUMBER OF
# OF UNITS
NUMBER OF
NUMBER OF
NUMBER OF
Fee Amount
$11.00
$13.00
$2.00
$44.00
$10.00
$10.00
Permit Total Fees: 590.00
Plumbing Permit
Firm: BRIGHTHOUSE CONSTRUCTION
Phone: (509) 226 -3248
Units
3
4
2
1
1
1
1
1
Unit Desc
NUMBER OF
NUMBER OF
NUMBER OF
NUMBER OF
NUMBER OF
NUMBER OF
NUMBER OF
NUMBER OF
Permit Total Fees:
Fee Amount
$18.00
$24.00
$12.00
$6.00
$6.00
$6.00
$6.00
$6.00
$84.00
Operator: JD Printed By: jmm Print Date: 10/26/2009
Project Number: 09003442 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 10/26/2009
Notes: ;ffe,
All residential driveways and off - street parking areas shall be paved with asphalt, Portland cement,
grasscrete, paver blocks, or other equivalent hard surface material.
FLORA ESTATES -REFER TO ADE -19 -06 FOR LOT WIDTH/FRONTAGE-MN
FLORA ESTATES -SEE FILE ADE -19 -06 FOR LOT FRINTAGE /WIDTH -MH
Payment Summary:
Permit Type
Building Permit
Mechanical Permit
Plumbing Permit
Fee Amount Invoice Amount
$1,983.75
$90.00
$84.00
$1,983.75
$90.00
$84.00
Amount Paid
$466.94
$0.00
$0.00
Amount Owing
$1,516.81
$90.00
$84.00
$2,157.75 $2,157.75
$466.94 $1,690.81
Page 4 of 4
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and /or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm
Print Date: 10/26/2009
Spokane
jUalley
For City Use Only
PLUS Project Number C5t f'4 L
Project Address
7
11703 E Sprague Ave Suite B -3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 • permitcenter @spokanevatley.org
As part of our on -going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a re�v�iseld target date.
`) 1
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re- submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre - Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick -up. Information regarding fees and pre - construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE - APPLICANT PINK - BUILDING FILE REV 9/07
Lot 3
7,221 SF
17102 E. Augusta Court
1/16" scale
.0625
Drainage Easement
Border Easement
Utility Easement
PLANNING DEPT. APPROVED
BY: fix.0
DATE: to/24.40c(
00
rn
0
0
•
•
•
•
•
•
.
/ 4)/ / • i N
`a/ / X6'
N. /
' I ▪ / / �� N. NN
%`/ /•16
WI/ / �`` �\ '•�,
�/ 1 / 1N.&
/ I4.\ /
Augusta Court
E �I N� / /
4.1 E 1 ■ / /
cA I /
.� °' ▪ I �6 / / /l
a�i I N. / / u
0
/ /;
��I �`/ -
—i
i
_ _
20' setback — /
/
/
65.32'
/ RECEIVED
/ SV PERMIT CENTER
1 T 2 2 g0,09
Project #_ ► 0 Z— -
Name
Submittal