Loading...
HomeMy WebLinkAbout2009, 10-22 Permit App: 09003442 ResidenceSpokane Valley Community Development Residential Construction Permit Application Permit Center 11703 E Sprague Ave, Suite B -3 Spokane Valley, WA 99206 (509)688 -0036 FAX: (509)688 -0037 www.spokanevalley.org PERMIT NUMBER: PERMIT FEE: f1New Construction Addition/Remodel Other: Accessory Bldg Deck SITE ADDRESS: I7 / p 2— E ,�v 5T- G =/ ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: w)r GUrc. # OF STORIES: Name: n^` /4, /, f / " xi MAIN FLOG TO SQ. FTG: 5 77 2" FLOOR SQ. FTG: / 1� 0 /� Address: � & X 642.5 »6u -//4 614-//04/ /16)",4 % X- City: v�wAila� i / ' State:0 ¢ Zip: X 325 Phone: fen , 2.2c 72, Fax: Fax: AT SOURCE: CSEW OR SEPTIC? 6,x Contact Person Name: /; // 1.-y ,AI Phone: t'e q ?y 78 S� Describe the scope of work in detail: Contractor: ' f r 5 > w)r GUrc. # OF STORIES: Name: fi�1 R4... l L y'N,/,,, MAIN FLOG TO SQ. FTG: 5 77 2" FLOOR SQ. FTG: / 1� 0 Address:p ✓ eise r2 »6u -//4 614-//04/ /16)",4 % X- City: State: ��A Zip: 9 f0 z Phone: Snct 2 2C 12 yg- Fax: AT SOURCE: CSEW OR SEPTIC? 6,x Contractor Lic No: Exp Date: City Business Lic. No: Cost of Project: $ ,2v (_ (�; y /-T d Cf G ay Proposed Use: • (write N/A if not applicable ) * * * * * * * * * * * * * * * * * * * * ** ...................... .' -- 1 llG 1Vlly HEIGHT TO PEAK: C. fT ♦uu� iv ' , i w.....�...r......�.. DIMENSIONS: # OF STORIES: TOT/A���TABLE SPACE: MAIN FLOG TO SQ. FTG: 5 77 2" FLOOR SQ. FTG: / 1� 0 UNFIN BASEMENT SQ. FTG: . IMPERVIOUS SURFACE AREA: FINISHED BAS EN SQ. FTG: A /A- GARAGE SQ. FTG: 5v 4 DEC COV. PATIO SQ. FTG: 30% SLOPES ON PROPERTY: N ci # OF BEDROOMS: 3 CONSTRUCTION TYPE: AT SOURCE: CSEW OR SEPTIC? 6,x The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is /will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15/07 ❑ Check ❑ Mastercard Expires: DATE: /, 77, ❑ VISA VIN #: if RECEIVED CSV PERMIT CENTER OCT 2 2 2009 Project #_ c7iC Name Submittal #_ RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. ❑ SITE PLAN ❑ Property lines and dimensions ❑ Direction arrow pointing North and orientation to streets ❑ Proposed /existing buildings (footprint and dimensions) ❑ Utilities, septic tank/drain field locations and distances ❑ Setbacks to property lines ❑ Distance between buildings ❑ Right of way /easement location & sizes ❑ Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear /Sides) with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): ❑ Footing sizes and locations ❑ Perimeter concrete foundation wall sizes ❑ Crawlspace ventilation ❑ Supporting wood cripple walls or beams ❑ Thickened concrete pads supporting beams or girder trusses ❑ Floor Plan of each level (finished or unfinished) with dimensions: ❑ Floor Joist direction, size and spacing ❑ Header, beam or concrete lintel sizes ❑ Brace wall panel locations ❑ Water heater and furnace locations ❑ Exhaust fan locations ❑ Deck or concrete patio sizes and locations ❑ Roof Plan: ❑ Engineered truss direction and spacing ❑ Rafter and over frame direction, size and spacing ❑ Wall Section Detail including: Roof ❑ Slope/ roofing material/ underlayment/ ice dam protection ❑ Sheathing size and type Ceiling ❑ Joist size and spacing Wall ❑ Height/ top plate/ stud size and spacing/ sole plate ❑ Exterior sheathing size and type Floor ❑ Joist size and spacing Foundation Wall ❑ Concrete or Masonry unit width ❑ Earth to wood separation distance Footing ❑ Size Radon ❑ Passive system with 6mil vapor barrier Miscellaneous Construction Details ❑ Deck: ❑ Floor plan/ side view/ dimensions ❑ Floor Joist/ decking direction, size and spacing ❑ Stairway tread rise & run and nosing ❑ Window and door location and sizes ❑ Window well locations if applicable ❑ Room usage labels ❑ Smoke detector locations ❑ Attic and crawl space access locations ❑ Fire Wall construction ❑ Ridge, eave and valley lines ❑ Beam and girder size and location ❑ Truss or rafter size, spacing & connection ❑ Attic insulation/ air space baffle/ ventilation ❑ Size of ceiling gypsum wall board ❑ Siding/ exterior house wrap/ anchor bolts ❑ Insulation, vapor barrier, gypsum wall board ❑ Sheathing or concrete floor size/ insulation ❑ Footing bottom to finished ground level depth ❑ Horizontal & vertical reinforcement if any ❑ Reinforcement if any ❑ Active system with 6 mil vapor barrier ❑ Footings/ post/ and beam size and locations ❑ Handrail / Guard height & spacing Permit Center � ! 11703ES mor7 r,�ne Sprague Ave, Suite B -3 Sf � Spokane Valley, WA 99206 (509)688 -0036 FAX: (509)688 -0037 Community Development permitcenter @spokanevallev.ore Mechanical Permit Application PERMIT NUMBER PERMIT FEE: Commercial (0'Residential SITE ADDRESS: / 7 / b !i .A./GL-57-14 Building Owner in Name: Address: e‘42 Contractor fl? c r 4 1E ' Name: IeF Address: � / L1 D Re;),/ '2 i License No: Phone: 22 C ? 2 Y g- Fax: State: o4 J Phone: 52, ? 22G 2 yg- Fax: Zip: D2 5_ City Nett" iwur State: ouR City Business Lic: Zip: ?To Contact/Project Manager: • Phone: DCASH ❑ CHECK ❑ VISA ❑ MC CARD #: EXPIRES: SIGNATURE RECEIVED CSV PERMIT CENTER OCT 2 2 2009 Project # �c http: / /wcvw.spokanevalley.org/uploads/ Community_ Development / Documents / Forms /Building/NlechanicalPermitAp li,55i4403 Submittal # #UNITS FURNACES & SUSPENDED HEATERS- INSTALLATION OR RELOCATION Up to & including 100,000 BTU 1 FURNACES & SUSPENDED HEATERS- INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM HEAT PUMP /AIR CONDITIONER 0 -3 TON AIR CONDITIONER Over 3 -15 TON AIR CONDITIONER Over 15 -30 TON AIR CONDITIONER Over 30-50 TON AIR CONDITIONER Over 50 TON GAS WATER HEATER / GAS PIPING SYSTEM (each outlet) ?^ GAS LOG, FIREPLACE, & GAS INSERT APPLIANCE VENTS INSTALLATION, RELOCATION, REPLACEMENT REPAIRS OR ADDITIONS BOILER, COMPRESSORS, ABSORPTIONS SYSTEM 0 to 3 hp- 100,000 BTU or less BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 3 - 15 hp — 100,001 to 500,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 15 — 30 hp - 500,001 to 1,000,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 30 hp — 1,000,001 to 1,750,000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 50 hp — over 1,750,000 BTU AIR HANDLER (DOES NOT include ducting) Each unit up to 10,000 dm, including ducts AIR HANDLER (DOES NOT include ducting) Each unit over 10,000 dm EVAPORATIVE COOLERS(other than portables) VENTILATION AND EXHAUST Each fan connected to a singe duct Ili VENTILATION AND EXHAUST Each ventilation system VENTILATION AND EXHAUST Each hood served by mechanical exhaust INCINERATORS Installation or relocation of residential INCINERATORS Installation or relocation of commercial APPLIANCES -ng= lothes Wash ^—,-� UNLISTED APPLIANCES Under 400,000 BTU UNLISTED APPLIANCES Over 400,000 BTU HOOD Type I HOOD Type II L P STORAGE TANK WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM — FREE STANDING DCASH ❑ CHECK ❑ VISA ❑ MC CARD #: EXPIRES: SIGNATURE RECEIVED CSV PERMIT CENTER OCT 2 2 2009 Project # �c http: / /wcvw.spokanevalley.org/uploads/ Community_ Development / Documents / Forms /Building/NlechanicalPermitAp li,55i4403 Submittal # Spokane _fey. Permit Center 11703 E Sprague Ave, Suite B -3 Spokane Valley, WA 99206 (509)688 -0036 FAX: (509)688 -0037 permiteenter@snokanevalley.org Community Development Plumbing Permit Application PERMIT NUMBER: PERMIT FEE: n Commercial [ + Residential SITE ADDRESS: / 7/ 0 2 f i e U17q 4/ Building Owner r Name: /4 ' " �/ �� Phone: Fax: ; Address: City: / State: Zip: L Contractor A/2,,, 6 th-- 413 . 40N.� lJ c<,5,/� _ Name: in :RE i `tx, Phone: Fax: Address: PD Box 4/7'5- city: Iva., "4 j , k State: 1,,JA4 Zip: 7.742 2`3 License No: City Business Lic: Contact/Project Manager. Name: Phone: # OF UNITS PLUMBING FIXTURE ON A TRAP TOILETS 3 URINALS TUBS SHOWERS (per trap) SINKS Lav /Basins, Bar, Floor, Kitchen, Laundry, Utility, Janitor, Photo, X -ray, Food, Prep /Culinary Meat DISHWASHER CLOTHES WASHER GARBAGE DISPOSAL / / WATER SOFTNER FLOOR DRAIN Area, Case, Coil, Trench, Condensate ROOF DRAIN /OVERFLOW DRAINS FOUNTAIN, DRINKING WATER PIPING /DRAIN -IN WASTE Installation, Alterations, Repair, Reversals WATER USING DEVICE Ice and /or Coffee maker, hose bib, steamer proofer, carbonator, swamp cooler / SEWAGE DISPOSAL SYSTEM PRIVATE WATER HEATER If Gas, See Mechanical INDUSTRIAL WASTE PRETREATEMENT INCEPTORS Including traps, vents except kitchen type grease interceptors functioning as fixture traps REPAIR OR ALTERATION Water piping, drainage or vent piping ATMOSPHERIC TYPE VACUUM BREAKER BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers MEDICAL GAS INCEPTORS ❑CASH ❑ CHECK ❑ VISA ❑ MC Card# SIGNATURE: EXPIRES: VIN: RECEIVED CSV PERMIT CENTER OCT 2 2�20�0t9 PrOlect rf �i�F,�k1TI_4 -- CURRENT FEES AVAILABLE AT: http: / /www.spokanevallev.orq/ under the quick links for Forms, Master ee iNarrle fir http: / /www. spokanevalley. org/uploads/ Community_ Development / Documents / Forms /Building/PlumbingPermitAppli Project Number: 09003442 Inv: I Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 10/26/2009 Project Information: Permit Use: SFR W /ATT GAR Setbacks: Front Site Information: Plat Key: Left: Right: Rear: Name: Range Page 1 of 4 Contact: BRIGHTHOUSE CONSTRUCTION Address: PO BOX 425 C - S - Z: NEWMAN LAKE WA 99025 Phone: (509) 226 -3248 Group Name: Project Name: District: East Parcel Number: 55073.3103 Block: SiteAddress: 17102 E AUGUSTA CT Location:: CSV Lot: Owner: Name: LYNN, MICHAEL E & LYNDA A Address: 8915 E HARRINGTON AVE SPOKANE, WA 99212- Zoning: R -4 SF Res Urban District Water District: 134 CONSOLIDATED ID #19 Area: 6,103 Sq Ft Width: 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Hold: fl Depth: 0 Right Of Way (ft): 0 Review Building Plan Review Released By: Other Reviews Originally Released: 10/23/2009 By: tmelbourn Released By: CITY BUSINESS LICENSE Originally Released: 10/22/2009 By: jdavis Driveway /Approach Released By: NOT REQUIRED Originally Released: 10/23/2009 By: TMELBOU Operator: JD Printed By: jmm Print Date: 10/26/2009 Project Number: 09003442 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 10/26/2009 Page 2 of 4 Landuse /Zoning/HE Conditions Released By: See Conditions Sewer Review Permits: Originally Released: 10/26/2009 By: mbasinger Released By: Originally Released: 10/22/2009 By: jdavis Building Permit Contractor: BRIGHTHOUSE CONSTRUCTION Firm: BRIGHTHOUSE CONSTRUCTION Address: PO BOX 425 Phone: (509) 226 -3248 NEWMAN LAKE WA 99025 This Application: Total Project: Description Gtr Type Notes So Ft Valuation So Ft Valuation 1 &2 FAMILY R -3 VB 570 $55,193.10 570 $55,193.10 2ND FLOOR R -3 VB 1,110 $107,481.30 1,110 $107,481.30 DECK OPEN R -3 VB 122 $1,830.00 122 $1,830.00 GARAGE U -1 VB 504 $9,576.00 504 $9,576.00 Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Totals: 2,306 $174,080.40 2,306 $174,080.40 Units Unit Desc 1 SELECT 1 SELECT 1 SELECT Fee Amount $1,413.75 $4.50 $565.50 Permit Total Fees: $1,983.75 Operator: JD Printed By: jmm Print Date: 10/26/2009 Project Number: 09003442 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 10/26/2009 Mechanical Permit Contractor: BRIGHTHOUSE CONSTRUCTION Address: PO BOX 425 NEWMAN LAKE WA 99025 Item Description GAS WATER HEATER GAS APPLIANCE <= 100,000BTU GAS PIPING VENTILATING FANS 1 DUCT CLOTHES DRYER RANGE Contractor: Address: Units 1 1 2 4 1 1 BRIGHTHOUSE CONSTRUCTION PO BOX 425 NEWMAN LAKE WA 99025 Item Description TOILETS/BIDETS SINKS TUBS DISH WASHERS GARBAGE DISPOSAL CLOTHES WASHER FLOOR DRAINS MISCELLANEOUS FIXTURES Page 3 of 4 Firm: BRIGHTHOUSE CONSTRUCTION Phone: (509) 226-3248 Unit Desc NUMBER OF NUMBER OF # OF UNITS NUMBER OF NUMBER OF NUMBER OF Fee Amount $11.00 $13.00 $2.00 $44.00 $10.00 $10.00 Permit Total Fees: 590.00 Plumbing Permit Firm: BRIGHTHOUSE CONSTRUCTION Phone: (509) 226 -3248 Units 3 4 2 1 1 1 1 1 Unit Desc NUMBER OF NUMBER OF NUMBER OF NUMBER OF NUMBER OF NUMBER OF NUMBER OF NUMBER OF Permit Total Fees: Fee Amount $18.00 $24.00 $12.00 $6.00 $6.00 $6.00 $6.00 $6.00 $84.00 Operator: JD Printed By: jmm Print Date: 10/26/2009 Project Number: 09003442 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 10/26/2009 Notes: ;ffe, All residential driveways and off - street parking areas shall be paved with asphalt, Portland cement, grasscrete, paver blocks, or other equivalent hard surface material. FLORA ESTATES -REFER TO ADE -19 -06 FOR LOT WIDTH/FRONTAGE-MN FLORA ESTATES -SEE FILE ADE -19 -06 FOR LOT FRINTAGE /WIDTH -MH Payment Summary: Permit Type Building Permit Mechanical Permit Plumbing Permit Fee Amount Invoice Amount $1,983.75 $90.00 $84.00 $1,983.75 $90.00 $84.00 Amount Paid $466.94 $0.00 $0.00 Amount Owing $1,516.81 $90.00 $84.00 $2,157.75 $2,157.75 $466.94 $1,690.81 Page 4 of 4 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and /or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 10/26/2009 Spokane jUalley For City Use Only PLUS Project Number C5t f'4 L Project Address 7 11703 E Sprague Ave Suite B -3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter @spokanevatley.org As part of our on -going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a re�v�iseld target date. `) 1 Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re- submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven 't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre - Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick -up. Information regarding fees and pre - construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE - APPLICANT PINK - BUILDING FILE REV 9/07 Lot 3 7,221 SF 17102 E. Augusta Court 1/16" scale .0625 Drainage Easement Border Easement Utility Easement PLANNING DEPT. APPROVED BY: fix.0 DATE: to/24.40c( 00 rn 0 0 • • • • • • . / 4)/ / • i N `a/ / X6' N. / ' I ▪ / / �� N. NN %`/ /•16 WI/ / �`` �\ '•�, �/ 1 / 1N.& / I4.\ / Augusta Court E �I N� / / 4.1 E 1 ■ / / cA I / .� °' ▪ I �6 / / /l a�i I N. / / u 0 / /; ��I �`/ - —i i _ _ 20' setback — / / / 65.32' / RECEIVED / SV PERMIT CENTER 1 T 2 2 g0,09 Project #_ ► 0 Z— - Name Submittal