Loading...
2012, 07-31 Permit: SW-12001875 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW- 12001875 Permit Issued Date: Expiration Date: Project Description: SEWER CONNECTION Project Name: S GREENACRES Permit Type: SEWER Primary Contact: COURCHAINE CONSTRUCTION Applicant: COURCHAINE CONSTRUCTION Address: 19818 E SPRAGUE GREENACRES, WA 99216 Phone: 509 - 924 -5485 Email: SITE INFORMATION: Site Address: Parcel Number: 18618 E AUGUSTA AVE 55074.1807 Subdivision: SIMPSON'S Assessor's Description: SIMPSON ADD TO GREENACRES L7 B2 Inspection Area: Water District: Consolidated Irrigation District #19 Zoning: Land Area: 14690 Square Feet Owner: PORTER, JANE R Address: 18618 E AUGUSTA AVE SPOKANE VALLEY, WA 99016 Phone: Email: Fire District: Spokane Valley Fire CONTRACTOR INFORMATION: General Contractor COURCC *181 R7 COURCHAINE EXCAVATION 19818 E SPRAGUE GREENACRES, WA 99016 509 - 928 -0846 DETAILS: Class SEWER Type Quantity Unit Charge Value SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 $125.00 Total Fee: $25.94 $125.00 $150.94 CONDITIONS: CALL 1- 800 - 424 -5555 BEFORE YOU DIG —AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477 -3604 FROM 8:30 -5:00 MONDAY - FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30- MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 07/31/2012 09:04:00 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW- 12001875 Permit Issued Date: Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 07/31/2012 09:04:00 Printed by: IIS APPPOODASP.NET v4.0