2012, 07-31 Permit: SW-12001875 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW- 12001875
Permit Issued Date:
Expiration Date:
Project Description: SEWER CONNECTION
Project Name: S GREENACRES
Permit Type: SEWER
Primary Contact: COURCHAINE CONSTRUCTION
Applicant: COURCHAINE CONSTRUCTION
Address: 19818 E SPRAGUE
GREENACRES, WA 99216
Phone: 509 - 924 -5485
Email:
SITE INFORMATION:
Site Address:
Parcel Number:
18618 E AUGUSTA AVE
55074.1807
Subdivision: SIMPSON'S
Assessor's Description: SIMPSON ADD TO GREENACRES L7 B2
Inspection Area:
Water District:
Consolidated Irrigation
District #19
Zoning: Land Area: 14690 Square Feet
Owner: PORTER, JANE R
Address: 18618 E AUGUSTA AVE
SPOKANE VALLEY, WA 99016
Phone:
Email:
Fire District: Spokane Valley Fire
CONTRACTOR INFORMATION:
General Contractor
COURCC *181 R7
COURCHAINE EXCAVATION
19818 E SPRAGUE
GREENACRES, WA 99016
509 - 928 -0846
DETAILS:
Class
SEWER
Type
Quantity Unit Charge Value
SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
$125.00
Total Fee:
$25.94
$125.00
$150.94
CONDITIONS:
CALL 1- 800 - 424 -5555 BEFORE YOU DIG —AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477 -3604 FROM 8:30 -5:00 MONDAY - FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30- MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed: 07/31/2012 09:04:00
Printed by: IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW- 12001875
Permit Issued Date:
Expiration Date:
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 07/31/2012 09:04:00
Printed by: IIS APPPOODASP.NET v4.0