Loading...
2013, 05-17 Energy Compliance CertProperty Address: S 1 Z N Avc.lotn Conditioned Floor Area 1-y:),6 Date S Builder or registered design professional : �CyIQ SinK.AvlSoh Signature: (z' (zoy4q6,-1-scs1 Ceiling: Vaulted R- Attic R- Floors Over unconditioned space R- Walls: Above grade R- Doors Below, int. R- Below, ext. R- Slab on grade floor R- L- Factors and SHGC R- R- R- NFRC rating (or) Windows U- SHGC- Default rating (Chapter 10 WSEC 2009) Skylights U- SHGC- Chapter 9 Option {s) Total Chpt. 9 Credits System Heating Cooling DHW Heating, Cooling & Domestic Hot Water Type Duct & Building Air Leakage All ducts & HVAC in conditioned space ( yes CI Insulation R- Test Method: Total leakage Leakage to exterior ,Air handler present Test Target -7g CFM @25Pa Test Result -) d CFM@ 25Pa Efficiency Building air leakage target: SLA <0.00030 - Tested leakage: SLA= _(X)0"3 Onsite Renewable Enet y Electric Power System System type: Rated annual generation Kwh