Loading...
2013, 08-08 Energy Compliance CertProperty Address: JlZ� IV A G O (/1 a t e Conditioned Floor Area J 7 Builder or registered design professional : C A J'ef 9f Signature Date /cc /13 R- Values Ceiling: Vaulted R- Floors Over unconditioned space R- Attic R- Slab on grade floor R- Walls: Above grade R- Doors Below, int. R- Below, ext. R- R- R- R- NFRC rating (or) Default rating (Chapter ] O WSEC 2009) Chapter 9 Option(s) System Heating Cooling DHW Windows U- Skylights U- SHGC- SHGC- Total Chpt. 9 Credits Heating, Cooling & Domestic Hot Water Type Duct & Building Air Leakage Ffficiency All ducts & HVAC in conditioned space ( yes / no) Insulation R- Test Method: Total leakage Leakage to exterior Air handler present Test Target CFM @25Pa Test Result CFM@25Pa Building air leakage target: SLA <0.00030 - Tested leakage: SLA =,OC2-7 System type: Onsite Renewable Energy Electric Power System Rated annual generation Kwh