Loading...
5194558 - Mitigation Agreement: Pines/Mansfield 5194558 RETURN ADDRESS Page: 1 of 9 03lc412895 81:31P Spakane CoCity of Spokane Valley 6Q: a~ i~ EIT, cI' Y rF :'O;h r WR 11707 E. Sprague Ave Spokane Valley, WA 99206 Attn: Chris Bainbridge, City Clerk Please Type or Print Neatlv 8 Clearlv All InformaUon Document Title(s): Mitigation Agreement SR 27 (Pines Road) Mansfield Road Construction Project Reference Number(s) of Related Documents Grantor(s) (Last Name, First & MiddlE Iniliaq Developor: Thomas Hamilton Grentee(S) (Last Name, First 8 Middle Iniiial) Mitigation Agreement with Developer noted above and City of Spokane Valley Leg81 D@SCrIptlOfl (Abbreviated form is atceptable) i.e. SectioNTawnshiplRange/1/4 Section 45103.0245 - Assessor's PL 6 E Ya of TR 7 EXC PTN of SW DAF; BEG A T SW COR TH E 150 ft TH n 240 ft TH w 150 ft th s240 Ft 45103.0244 - ASSESSOR PL 6 PTN E'/z OF TR T DAF; BEG AT SW COR TH E 150 FT TH N 240 FT TH W 150 FT TH S 240 FT 45103.0203 - SW Ya 10-25-44 ASSESSOR'S PLAT #6 PTN OF TRTS 8,9,& 10 N OF SI RR ROW 45103.0204 - SW'/a 10-25-44 HOUSE ONLY ON ASSESSOR'S PLAT #6 TRTS 8,9,&10 LYG N OF SPO, CDALENE 8 PALOUSE RR ROW 8 EXC SPO INTERNATIONAL RR ROW Assessor's Tax Parcel ID Number. see above The Couniy Auditor wiU rety on the information provided on this form. The StaK will not read the document to verify the Accuracy or compleieness of khe indexing information provided herein. Sign below only if your document is Non-Standard. I am requesting an emergency non-standard rQCOrding for an edditional fee as provided in RCW 36.18.010. I understand that the recording processing requirements may cover up or othenvise obscure soma parts of the text of the original document. Fee for non- standa pro sing is $SO. : S'igPla4ure uf Requesting Party ~~J~ Z/y 5194558 Page: 2 of 9 ' 83/24/2865 01:37P 'u0! 'M 'It, CI r lF S'G; s : kr. it SAokane Co, WR iVIITIGA"1'iON AGREENIL:NT SR 27 (PliNES RnAll) / vIANSFTELD RUAD C4NSTRUCTION PRnJECT This Mitigation Agreement ("AgreemenY') is entereci into by and between 1`homas Hanilton ("Developer"), havins offices for the transaction 4f business at F' O Box 14686, Spokane, Washington 99214, and the City nf Spokane Valley ("City"), a political subdivision of the Stale of Washuigton, hereinafter jointly referred to as "Parlies": RFCITALS 1. 'I'he City, in c;opperation with Spokane County and the Washington Statc Department of Transportation, is planning to dcsign and canstruct iruprovements to the SR. 27 (Pines Road) and Mansfield R.oad eorridor with Transportation Partnership Prngram (TPP) gant f'unds from the Transportation Improvement Board (TTB) and Congestion ManagemenUAir Quality (CMAQ) grant funds f.'rom the Spokane Regional °l'ransportatiAn Council (SRTC). "I`he name af the project is the Pines/Mansfield Corridor Congestion R.elief Project ("ProjecY') and the purpase of this project is to alleviate existing and future trafCc congestion in this area.. '1`he Project will reconfigure the WB ramps nf 1-90 at SR-27 (Pines Rd.), using the existing slip ramps to Indiana Avc. and Montgomery Ave. WB ot"f-ramp traf.f c will use the slip ramp lo a signalired interscction at Tndiana Avc. WF3 on-ranp traffic N;ill use the slip ramp at Montgomery Ave. To improve operation of tlie WI3 an-ramp arid ensure safety, the portion of Montgomery Avc. between Pines Rd. and the slip ramp NArill be Une- way, wcstbound only. Therefore, to provide access ta Pines Rd. for the properties west of Pines Rd., MansfieJd Ave. NNill be improvcd, with a traFt7c signal at the intcrsection of Mansfield Ave. Pines Rd. Curb; gutler, sidewalks and bike lancs,"rill also be constructed. t.n addition, a signal will be iastalled at the Mirabeau Pkwy & Pines Rd. intersection to bring this intersection up to an acceptable level of service. 2. The Developer is the oAmer/develaper of certain real property generally located within the SR 27 (Pines Road) and MansEield Road corridor norlh of Interstate 90 lcgally described i.n E.Yhibit "A" ("Froperty"). 3. 1'he Dcvcloper is developing the Property for residential ancUor colnmercial uses (the "Development") which will increase traf•Te congestion ancl directly i.mpact existing - transporlation infrastructure along the Pines/Mansfield corridor from and including the on- and off=r`cnps at I-90. Mitigation of these impacts 1,%rill be requircd as part of the development of said property. 4. '1`he l'arcies are desirous of enlering iuto an Agreement wluch provides for the payment oFa proportionate share of the Froject in consideration for the alJocation of a specified nurnber of P.M. Peak Hour trips and mitigation of traf.f c impacts associated witb the Development. 5194558 ' Page: 3 aF 9 . Thomas Hamilton, Mitigalion Agreement 83J2412965 01 :3tF Pinez/Mansfield Koac1 Conslruet.ion Prnjcet LU Ei J i 4, CI r JF A6 i !c~ , ib SpOkorie Co, WA 5. The lleveloper recognizes the need to imprnve the lraiTic congestion i.n the Pincs/Mansf eld corridor and has agreed to financially partieipatc in the Project by contributing a pra-rata share of the required local matching funds. "I"he laeveloper's pro- rata share is based on the latal numbcr of trips previously estimated for the TJevelopment. 6. Pursuant to RCW 43.21 C.ObO, anci RCW 82.02.020, the City has the authority to allow apayment to mitigate a direct i.mpact that has becn identified a.s a eonsequenee of a proposcd development. The City (1) has identi.fied fui•ure road projects necessitaled by planned development in cerlain areas of the City; and (2) has idcntified a rea..sanable relationship between i.mpael.~ generated by the Taevelopment to the transportaiion system dnd the financial contribution loward those impacts. 7. To mitigate the di.rect impacts of the llevelopment upon cxistuig transpartation racilities; the I'arties are voluntarily entcring into tttis Agree.ment pursuant to RCVJ 82.02.020. 8. It is intended that chis Agrcement provide funcis in order to mitigate the ciireet traffic-relatcd impacts of the Development upon the environmcnt. ACREEMErT'1 NO`V, THER.EFURL°', in consideration of the mutual covenants and conditions bereafter set fortti, the Developer and the Ci .ty hereto agree as follows: 1. Voluntarv Ap-rcement. '1 his Ageement, including all attacbed decuments; is a voluntary ageement a.s that term is used in R.C`V 82.02.020. l-he mitigation fecs charged herein are proportional to the traffic-related impacts generated by the Development.l"he parties acknowledge that the capital praject is reasonably necessary to mitigate the direct traffic impact of the .L7eve]opmenL In the cvent this mitigation agreement is determined by a court to be null and v4id the City sha,ll refund the unexpended portion of mitigation fees. FollovNiing a termination of tliis agreement the Devcloper shall, as reasonably rcquired, miti€ate the direct traffic impaets of the Developmenl through the State Environmental Policy Act_ 2. Proiect Funds. The Project is being Funded fi-am several svurces including, the Washingtnn State Department of Transportation (WSi70T), the TIB; the SR7"C, the City, and private developers. Funds frem WSDO'1", T1B, SRTC and the City have been obligatecl. See "L"xhibit B". 3. Mitip-ation Fee. "I"he Develnper shall pay $59,478, ($303.46 per P.M. Peak Hour trip), which has been determined to bc the Developer's ccmtribution to the Project for mitigation of ruture traff c impacts relateci to the llevclopment. This traffic miligation fee shall be expended towards the design, right-of-way acquisition, and construction of the Project. P;WibEk WarYclCs;im1 f'mjeas'd'ixrAla:esficNb~li~irytim ltigeemewNiitigatioa ApcemcntaV.1177CA7/0N AGRP6MEVT }Lvrs'lton.due i'~'~-; r v . ~ . t' _ . _ . 5194558 • : • ' ' , ~ PPw: 4 of 9 Thomas Hamillon, Mitigation Agreernent 03I2412005 81:37P PincslMansfield Road Construetion Project Qq: RNME I1, CI 'i JiF 5'( AL c Ri. la Spok~.~ Co~ !1R 4. Pavment "1'o begui the design af the Projcct, the Developer agrees to pay a11; or at least 20% of its mitigalion fee no later than h'ebruary 25, 2005. A lerier of credit, savings assignment, set-aside letter, or otber appropriate mechanism that gives the City a unilateral right to access the funds pursuant to this agreemen/ from a financial i.nskilulion shall also be provided tv the City no latcr than Februxry 25, 2005 for thc remai.n.i.ng 80% of the lleveloper's mitigation fee. Thc remaining 80% of the - Developer's mitigation fee shall bc collected by the City no later than 90-days prior to the Project bid date for cnnstruction. 1"hc City vvill noti_fy the Developer of the Projec;t bid date «rhe❑ it is delenninecl. All fees paid by the Developer shall be used as a portion of the local match requireci for thc 'I"lEi and SRTC grants related to the design, right-of-way acquisition, anci construction of the Project. 5. Site lleveloament. Auilding permits will be issued for the Taevelopmcnt when 1) this agreement has been executed by the Developer and the City, and 2) ihe Uevcloper's mitigation fees havc bcen paid in accorclanee with Section 4 above, anci 3) all othcr conditions of approval caf the Development required by state and local laws are Satl Sfl Ed. Fxecution of this agreement releases the Developer froui the requirement of constructing f'rnntage improvements on the Property, provided said frontage improvements arE ineluded in the 1'roject. Iffrontage improvements are not included in the Project, the Developer is responsible for cUnstructing frontage improvements in addition to paying the mitigation fees. 6. Comnliance with RCW 82.02.020. Payment collected by the City will be held in a mitigation fee reserve account and may only be exPended to fund the desigm, right-of- way acquisition, and wnstruclion of thc Project. Payments shall be expended within five years of collection. Tbe City shall be cntitled to reimbursement from the nutigation fee reserve account for any funds it may expend for the design, right-of- way acquisition, and eonstruction of the Projecl prior to the collection of the fee. Any funds in the mitigation fee rescrve account not expended Nvithin five years shall be refunded by the City with interest as provided in RCW 82.02.020. 7. Committed P.M. Pcak Huur "l,rins. The City agrees to reserve with.i.n the Pra.ject up co a total of 196 P.M. Peal: Hour trips for the Property until the Development is complete provided such rescrvation complies %k7th all federal, state and local laws ai the time applicatian for a building permit is made. "Complete" is defined as having rcceived all governmental pcrmits and approvals nec:essary to construct and permancntly occupy the Development. lf the total number of P.M. Yeak Hour trips for thc Development exeeeds the total number of reserved trips noted above, a new traftic stuciy shall be provided tn aetermine if additional traffic mitigation is required. 8. Coneurrenev: In accordance with the City's adopted concurreney standards pursuant to RCW 36.70A, the P.M. Peak 14our trips mitigated herein shall be considereci to have satisfied concunency for the Projcet from the Develanment as provided in paragraph 7. Any remaining capacity shall be availablc to the general public. P:V'uLft WmM1SlC4pital PmjectstiPieepAtusfi~etft4itiption AgiechncmaV.liligp7Snn Agcmemsi4IITlGATlO\ AG3l6HMENT Hnmikmdnc . , ' . --5194558 ?homas Hamilton Miti ~a,jon A reement PAge= 5 of 9 ~ ~ ~ 03/24/2885 01:37P Pines/Mansfield Izoad Conslruction Project L0I iVENT, [,I' r OF 5'?K hGi $er. 40 Spokane Co, WR 9. Notice: A.11 communications, notices or demands of any kind wb.ich a pa-ty under this Ageement is reyuired or desires to give ta any other party shaJl be in writing and be either (1) delivered personally, (2) senc by facsimile transmission wiCh an additional copy maileci first class, or (3) deposited in the U.S. mail, certified mail postage prcpaid, return receipt requested and addressed as follows: If to the City: City n.f' Spokane Vallcy 11707 E. Sprague Ave., Suite 106 Spokane Valley, WA 99206 Fax: (509) 921-1008 Attn: City Manager Tf to the Taeveloper: '1`homas Hamilton PO 13ox 14686 Spokane, WF199214 10. Successors. This Agreement shall be binriing on and inure to the benefit of the sueccssors and the astigms of the Yarties. 11. Governing Lxw. This Agreement shall be construed in accordance with the laws of the State of Wa.shington. Any action for enforcement of this Agreement shall be brought in a court of campctent jurisdiction in SPokane County, `Vashington or as otherwise providcd by statute. 12. Mnclifications. No modificaiion nr amendment of this Agreement shall be valid unlil the same is reduced to writing and executed with the same formalities as the present Agreement. 13. Wxiver. No officer, employee; agent or othenuise af'the City has the power, right or aulhority to waive any nf ihe conditions or provisions to lhis Agreement. No waiver ar any breach of this Agreement shall bc held to be a waiver of any other or subsequent breach. 14. Renresentation. This Agreemenl forms a fully integrated agreement between the Parties. No other understanclings, oral or otlierwise, regarding the subject matter af this Agreement shall be deemed to exist or to bind any of the Parties hereto. This agTeemenc shall mcct the IIvtigation reyuirements for direct traffic-related impacis of the Development within the F'raject limits as described in the Project description in Seclion 1 of thc Recita,ls and as identified and documented in the City File(s) referenced i.n Section 8 of the Recitals. This agreemcnt shall not superSede any other cnnditians of approva] nnt directly related to traffic-related impacts of the Developmenl within the I'roject linuts. p:Wub6c Wm4sWry-rital IkojoWl,Pi.-carMaGStkMicWtion AgetaiealslMitigatiun AyrcanrnlsLMRtGA'PIOY AGFt[QML•hT Hcnilwn.d[M . • -5194558 Thomas Hamilton, Mitigauon AgReemcnt Page: 6 af 9 03n4i2ee5 ei ,37P Pines/Mansfield Road Construcl.ion Projec ~d i't 4, f, CI' Y.F S'j(j f,ti; $E, .+a Spflkane Co, uA All Parties have read and understand all of'the Agreemcnt, and now state that no represen[ation, promise or ageement nUt expresscd in the Agreement has been made to induce any Party to execute the same. 15. Authority. Botli Parties to this Agreement represent and certi!'y that they have full authority and potiver to enter into and carry out this Agreement. The persons signing this Agreement represent that they have auchorily to act for and bijid the.ir respectivc prineipals. P:SPtblic N'urAsSC.apiu! IRMwc53kms•AtaasfieldLMitjpiioo ~eerxrts;~iiii~ation AgreemenmAt.ll]1CAT10N AGIiF.ET7ENT Hwruheo doe ' . ' 5194558 • . °1'homas Hamilton, Mitigauon Agreement PagP 1 7 of 9 &~/24/299~ A1~37P Pines/Mlnsfield Road Construction Project d )i'H;OT, CI' r 7F SIK RC.: s?/. +d Spokane Co, WA IT' WITNLSS WEEREOF, the Parties have executed this AgreemEnt this /OA.day of _FEkkutk~, 2005. .[)LVLLOPTR: f By: Its: 75h6mas Hamilton STA`I'E UF WASI-IINGTON ) ) ss. County ofi Spnkane ) On this 1044, day of Vashington, 2005 'before me, the undersigned, a Notary Public in and for dle S te of duly commissioned and sworn, personally appeared '0{oM,+S -~AQ? I LO►LI to mc known to be the ~Q~ ,A1 f= 2 af , the -seTer-afi,&n that executecl the foregoing instrument, alid acknowleciged the instrument to be the i'ree and voluntary act and deed of the corporazion, for the uses and purposes therein menlianed, and on oath stated that he is authorizcd to execute the insv-ument. ~VITNFSS my hand and official seal hereta a!'fixed thc day and year i.n this certificate above written. / • ' N16"1'ATZY/PU13i,,tC, in and for the State of *o1Aqy Washington, residi.ng at ' 100e - My couunission expires: (o ff D %~'9•. .~o~,. ~o~~' & • ~ H R 1< 1 6-- ~ Printed ~1amc "~oW Cl Y-O SPUKANE VALLEY: l7avid Mercier, City Managcr ~ =Z~4_r 7CaryDri OVE/ , Chris l~ainbridge; City Clerl ell; Deput 'Attorney PM'ubtie WrnAsl,Capieel PfCgactalPines Y1ansfieldSAtitigmtion AgrarincntnhMiiWnu:m qgranxnts4Kl'I'IGA970N AGRLETIFJ.T NmniRun.doe " Exhibit "A" ~ ~ ~ 3 I ~ O Q ~m m u ~ t ti ~ W (U .aiC T CP ~ o Ln0. 0 Vl T ~ ~ is1os.oza; ~ 45103.0203 " Y ~ in J ' 451 3 204 ~ Y J ~ 46103.0243 ~ ~ a t~ +~1AAA~ - ~ Indlana 45103.0245 ASSESSORS PL 6 E112 OF TR 7 EXC PTN OF SW114 DAF; BEG A T SW COR TH E150Fi' TH N240FT TH W 150FT TH S24UFT 45103.0244 ASSESSOR PL 6 PTN E112 OF TR 7 DAF; BEG AT SW COR TH E150F T TH N240FT TN W150FT TH S240FT 45103.0203 SWS/4 10-25-45 ASSESSOR'S PLA7 #6 PTN OF TRTS 8,9,&10 Pl OF SI RR ROW 45103.0204 SW114 10-25-44 HOUSE ONLY ON ASSESSOR'S PLAT #6 TRTS 8,9,&10 LYG N OF SPO, CDALENE & PALOUSE RR ROW & EXC SPO INTERNATIONAL RR ROW EXfllblt B' Pines/Mansfield Cost Estimate , PE ROW Construction Totals City Portion - Martsfield Ave. (34ane Section) Preliminary Engineerfng $75,622 Soils Invesf6gaUon $15,000 Right-of-way b600,000 ProjECt Signing $2,000 Contingencies - 1096 S75,622 Construction Engineering -1096 $75,622 Construction -1096 S756,220 EnvironmentallMiac. Enq $16,393 Subtotals $107,015 $60D,000 S909,464 $1,616,479 WSDOT Portion Design Engineering $200,000 Right-ofavay (Eualid) $25,000 ROW - Pines • $100,000 ' Construction $1,570,464 ' Gontingencies $65,745 Sa1es Taz- 6.190 $123,158 Construction Engineerinp 1696 $202,979 Subtotals $200,ooo $125,000 $ 2,022,346.00 S2.347.346 TOTAL S307,015 $725,000 52,931,610 $3,963,825 ' Added $50,000 per revised estimate trom WSDOT for adtiftional ftagging requfred af RR crossing. 7iB S 2,193,561 5596 Develapers $ 499,795 1396 City $ 55,000 1 a6 WSDOT $ 55,000 196 CN,AQ $ 1.160,500 2996 Total $ 3,963,856 10096 5194558 Page : 9 of 9 03/24/2803 61:3?P uU) R.v`SA, C I rJF ch ,~v.~ ~r • ib Spokane Ca, WR