Loading...
2012, 09-12 Permit: SW-12002182 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW- 12002182 Permit Issued Date: 09/12/2012 Expiration Date: Project Description: Project Name: Permit Type: SEWER CONNECTION ROTH ADD'N PH 2 SEWER Primary Contact: FOLSOM EXCAVATING INC Applicant: FOLSOM EXCAVATING INC Address: 16701 E VALLEYWAY AVE VERADALE, WA 99037 Phone: 509 -891 -1232 Email: SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: Zoning: 5120 S AVALON 46344.0609 PLAT NO 4 OF WEST FARMS IRRIGATED TRACTS W FARM IRR TR PL 4 W1/2 8110 EXC PLATTED PTN Owner: Address: Phone: Email: LOTS N LAND 210 N UNIVERSITY RD STE 300 SPOKANE VALLEY, WA 99206 Water District: Trentwood Fire District: Spokane Valley Fire Irrigation District #3 Land Area: 4.6 Acre(s) CONTRACTOR INFORMATION: General Contractor FOLSOE1994DO FOLSOM EXCAVATING INC 16701 E VALLEYWAY AVE VERADALE, WA 99037 509 - 891 -1232 DETAILS: Class SEWER Type Quantity Unit Charge Value SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Date Printed: 09/12/2012 11:58:35 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW- 12002182 09/12/2012 Expiration Date: CALL 1- 800 - 424 -5555 BEFORE YOU DIG - -AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477 -3604 FROM 8:30 -5:00 MONDAY - FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30- MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 09/12/2012 11:58:35 Printed by: IIS APPPOOL\ASP.NET v4.0