Loading...
2009, 09-24 Permit App: 09002947 ApproachPermit Center t�T�Y 11703E Sprague Ave, Suite B -3 okane Spokane Valley, WA 99206 *Valley® (509)688 -0036 FAX: (509)688 -0037 www.spokanevalley.org Community Development `k � Approach Permit Application O PERMIT NUMBER: PERMIT FEE: PROJECT ADDRESS START DA 171 I Li . F , a I of w; h awe 5 - - 10 ANTICIPATED COMPLETION DATE Building Owner: Contractor: OW ite...4 -- Name: /-7 1 e, k S o r el, I<-o $ k Name: Address: f t k. E , 1301 0 �✓ i vl k Address: City: s I�,Q,�,,�, , ( State: wi/)- Zip: Phone: SO el) c l— 8 i 04, Fax: City: State: Zip: Phone: Fax: ContacttTerson 6 wv- I A I405 lk Contractor Lic No: Exp Date: Name: City Business Lic. No: Phone: ( s---coq) q 1- i -1 I i g DESCRIPTION (Provide site sketch) Residential Driveway Existing Curb & Gutter Culvert Installation Other Conditions Commercial /Industrial Driveway Rural Road Section Sidewalk Repair /Construction Bond /Insurance certification must be on file with the city. DISCLAIMER The permittee verifies, acknowledges and agrees by their signatures that: 1) If this permit is for construction of or on a dwelling, the dwelling is /will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. Signature ai,/6 A.i Method of Payment ❑ Cash ❑ Check Bankcard #: Authorized Signature: REVISED 3/9106 Date 9 -" 2 Gt - ❑ Mastercard ❑ VISA Expires: VIN #: CSV PERMIT CENTER RECEIVED S'2 Project # Name Submittal # S Driveway Approach valley Requirements ► Minimum of 7.5' from property line ■ Minimum of 5' from crosswalks or intersection curb are ► Minimum of 16' wide flat portion of approach ■ Maximum of 30' wide flat portion of approach • Combined approach width not to exceed 50% of total frontage ■ Minimum of 15' of separation between any two approaches ** All driveway approaches to be constructed per the Spokane County Standards as adopted by the City of Spokane Valley ** <H 0 - # yeipwcins atiruN loefoid 600Z 1 d3S EIJINDO ASO CIDAIDODEI 7L A ■ 0