2009, 09-24 Permit App: 09002947 ApproachPermit Center
t�T�Y 11703E Sprague Ave, Suite B -3
okane Spokane Valley, WA 99206
*Valley® (509)688 -0036 FAX: (509)688 -0037
www.spokanevalley.org
Community Development `k �
Approach Permit Application O
PERMIT NUMBER:
PERMIT FEE:
PROJECT ADDRESS
START DA
171 I Li . F , a I of w; h awe
5 - - 10
ANTICIPATED COMPLETION DATE
Building Owner:
Contractor:
OW ite...4 --
Name: /-7 1 e, k S o r el, I<-o $ k
Name:
Address: f t k. E , 1301 0 �✓ i vl k
Address:
City: s I�,Q,�,,�, , ( State: wi/)- Zip:
Phone: SO el) c l— 8 i 04, Fax:
City:
State:
Zip:
Phone:
Fax:
ContacttTerson 6 wv- I A I405 lk
Contractor Lic No:
Exp Date:
Name:
City Business Lic. No:
Phone: ( s---coq) q 1- i -1 I i
g
DESCRIPTION (Provide site sketch)
Residential Driveway
Existing Curb & Gutter
Culvert Installation
Other Conditions
Commercial /Industrial Driveway
Rural Road Section
Sidewalk Repair /Construction
Bond /Insurance certification must be on file with the city.
DISCLAIMER
The permittee verifies, acknowledges and agrees by their signatures that: 1) If this permit is for construction of or on a dwelling, the
dwelling is /will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in
full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane
Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws,
codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this
application can be processed.
Signature
ai,/6 A.i
Method of Payment
❑ Cash ❑ Check
Bankcard #:
Authorized Signature:
REVISED 3/9106
Date 9 -" 2 Gt -
❑ Mastercard ❑ VISA
Expires:
VIN #:
CSV PERMIT CENTER
RECEIVED
S'2
Project #
Name
Submittal #
S Driveway Approach
valley Requirements
► Minimum of 7.5' from property line
■ Minimum of 5' from crosswalks or intersection curb are
► Minimum of 16' wide flat portion of approach
■ Maximum of 30' wide flat portion of approach
• Combined approach width not to exceed 50% of total frontage
■ Minimum of 15' of separation between any two approaches
** All driveway approaches to be constructed per the
Spokane County Standards as adopted by the City of Spokane
Valley **
<H 0 -
# yeipwcins
atiruN
loefoid
600Z 1 d3S
EIJINDO ASO
CIDAIDODEI
7L
A
■ 0