Loading...
2013, 01-18 Permit: SW-13000022 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW- 13000022 Permit Issued Date: 01/18/2013 Expiration Date: 01/19/2013 Project Description: Project Name: Permit Type: SEWER CONNECTION HILLS HAVEN (SUTTERS) SEWER Primary Contact: MCCONNACHIE, JAMES W Applicant: MCCONNACHIE, JAMES W 20202 E BUCKEYE LN OTIS ORCHARDS, WA 99027 Address: Phone: Email: SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: Zoning: 803 S BANNEN RD 45233.0624 TALLY HO SUBDIVISION VERA TALLY HO B148 L16 B2 Water District: Vera Irrigation District #15 Owner: Address: Phone: Email: MCCONNACHIE, J 20202 E BUCKEYE LN OTIS ORCHARDS, WA 99027 Fire District: Spokane Valley Fire Land Area: 10780 Square Feet CONTRACTOR INFORMATION: Owner Acting As Builder OWNER OWNER PERFORMING THE WORK SAME AS SITE ADDRESS SAME, WA 00000 DETAILS: Class SEWER Type Quantity Unit Charge Value SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125.00 $26.32 $125.00 $151.32 CONDITIONS: Inside Public Transit Benefit Area Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1- 800 - 424 -5555 BEFORE YOU DIG - -AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 01/18/2013 11:01:31 Printed by: IIS APPPOOL \SmartGovProdApp SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW- 13000022 01/18/2013 Expiration Date: 01/19/2013 FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477 -3604 FROM 8:30 -5:00 MONDAY - FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30- MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 01/18/2013 11:01:31 Printed by: IIS APPPOOL \SmartGovProdApp