2011, 10-14 Permit: 11003087 ResidenceSpokane~
jUalle3'
Permit Center
11703 E Sprague Ave Suite B3 Spokane Valley WA 99206
509.720 -5240 • Fax: 509.688.0037 • email: permitcenter @spokanevalley.org
Site Information
Project Information
Site Address: 18319 E BALDWIN AVE
Parcel Number: 55074.2009
Subdivision:
Block: Lot:
Zoning: R -3 SF Res District
Owner: SEATON, W J & G V
Address: 18405 E BALDWIN AVE
GREENACRES, WA 99016 -
Building Inspector: EAST
Water Dist: CONSOLIDATED IRRG #1
Project Number: 11003087 Inv: 1 Issue Date:
Permit Use: NEW SFR W/ ATTACHED 3 -CAR GARAGE
Applicant: SEATON, W J & G V
18405 E BALDWIN AVE
GREENACRES, WA 99016 -
Contact: SEATON, W J & G V
18405 E BALDWIN AVE
GREENACRES, WA 99016-
Setbacks - Front:
Group Name:
Project Name:
10/14/2011
Phone: (509) 928 -0633
Phone: (509) 928 -0633
Left: Right: Rear:
Permits
Building Permit Contractor: OWNER
Total Area 3146
Building Height 20
Stories 1
1&2 FAMILY
COV DECK
GAR WOOD
Total Value:
FOR BUILDING INSPECTIONS CALL (509) 688 -0054.
Plumbing Permit Contractor: OWNER
TOILETS /BIDETS
SHOWERS
DISH WASHERS
CLOTHES WASHER
FOR PLUMBING INSPECTIONS CALL (509) 688 -0054.
R -3
R -3
U -1
VB 2,384
VB 276
VB 762
$259,282.80
License #: OWNER
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Total Permit Fee:
License #: OWNER
3 $18.00 SINKS
2 $12.00 TUBS
1 $6.00 GARBAGE DISPOSAL
1 $6.00 FLOOR DRAINS
Total Permit Fee:
$1,889.75
$4.50
$755.90
$2,650.15
5 $30.00
1 $6.00
1 $6.00
1 $6.00
$90.00
Payment Summary
Total Fees
$2,740.15
AmountPaid AmountOwing
$2.740.15 $0.00
Tran Date
09/30/2011
10/14/2011
Receipt #
28547
28726
Payment Amt
$755.90
$1,984.25
Notes / Conditions of Approval
Engineering for Footing on rear Covered Patio required prior to framing.
Processed By: BONDURANT, MICK
Printed By: MORRIS, HEATHER
Page 1 of 1
REV CONT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the
property owner or an authorized agent of the property owner. It is the responsibility of the applicant /permitee that the use described on
the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as
listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may
necessitate removal of certain parts of the construction are at the applicant's /permittee's or property owner's expense.
At a minimum, the following inspections ARE REQUIRED by the Spokane Valley Municipal Code (SVMC):
FOOTING - when forms and reinforcements are in place and prior to placement of concrete -all structures, including manufactured
homes.
NOTE: This inspection includes review of the structures setback from property lines. Minimum setbacks are established by SVMC.
Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback
provisions lies solely with the permitee- neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure.
Failure to properly locate the structure may require its relocation at the owner's /permittee's expense.
FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING - after rough -in, before covering and final.
MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment and final.
FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and
prior to concealing.
FINAL - when complete and prior to occupancy and /or use; all permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the
approved site plan) required by ordinance or as a condition of approval of this permit. Items such as installation of fire hydrants,
fire department access, on -site drainage (208' swales), road improvements, parking and landscaping are common requirements of
a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES - final inspection required when complete, stairs, handrails, skirting, etc. installed and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover
RIGHT -OF- WAY /APPROACH - prior to placement of concrete / asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc.,
must be inspected prior to cover. Check with the Building department for special inspections in conjunction with commercial projects.
State law RCW 19.122 requires that prior to any excavation the 'CALL BEFORE YOU DIG' center must be notified. Call 411 at least 3
working days in advance.
PERMIT EXPIRATION AND REFUNDS
Expirations:
Building or other permits (regulated under SVMC Chapter 24) shall expire by limitation and be declared void if a) work is not started
within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the
date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for
half the permit fee based on the value of the remainder of the work required to finish the original permit.
Right -of -way permits (regulated under SVMC Chapter 22) issued between April 1, and September 30, are valid for 30 days after the
date of issuance, with a one -time 30 -day extension available. Right -of -way permits issued between October 1, and March 31, shall be
valid until the following April 30.
Refunds:
All refund requests must be made in writing by the original permitee to the Building Official no later than 180 days after the date of fee
payment. Full refunds will be granted for any permit issued in error. Rate of refund shall be as set forth in the City of Spokane Valley
Master Fee Schedule in effect at the time of permit application. A copy of this schedule is available at Permit Center and also available
for reference on the city website at: http: / /www.spokanevalley.org and search for "fees"
Owner /Agent Date:
Staff Approval Date:
Permit Center
11703 E Sprague Ave Suite B3 Spokane Valley WA 99206
509.720 -5240 • Fax: 509.688.0037 • email: permitcenter@spokanevalley.org
Site Information
Project Information
Site Address: 18319 E BALDWIN AVE
Parcel Number: 55074.2009
Subdivision:
Block: Lot:
Zoning: R -3 SF Res District
Owner: SEATON, W J & G V
Address: 18405 E BALDWIN AVE
GREENACRES, WA 99016 -
Building Inspector: EAST
Water Dist: CONSOLIDATED IRRG #1
Mechanical Permit
Contractor: OWNER
Project Number: 11003087 Inv: 2 Issue Date: 10/14/2011
Permit Use: NEW SFR W/ ATTACHED 3 -CAR GARAGE
Applicant:
Contact:
SEATON, W J & G V
18405 E BALDWIN AVE
GREENACRES, WA 99016 -
SEATON, W J & G V
18405 E BALDWIN AVE
GREENACRES, WA 99016-
Setbacks - Front:
Permits
GAS WATER HEATER
AIR CONDITIONER:4 -15 TONS
HOOD - TYPE I
SUPPLEMENTAL PERMIT
FOR MECHANICAL INSPECTIONS CALL (509) 688 -0054.
Group Name:
Project Name:
Left: Right:
License #: OWNER
Phone: (509) 928 -0633
Phone: (509) 928 -0633
$11.00 GAS PIPING
$21.00 VENTILATING FANS 1 DUCT
$52.00 GAS LOG OR GAS INSERT
$8.00 VENTILATION SYSTEM
Total Permit Fee:
Rear:
3 $3.00
1 $11.00
1 $11.00
3 $39.00
$156.00
Payment Summary
1
Total Fees AmountPaid
$156.00 $156.00
AmountOwing
$0.00
Tran Date
11/29/2011
Receipt #
29244
Payment Amt
$156.00
Notes / Conditions of Approval
Engineering for Footing on rear Covered Patio required prior to framing.
Processed By: BONDURANT, MICK
Printed By: MORRIS, HEATHER Page 1 of 1
REV COND
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the
property owner or an authorized agent of the property owner. It is the responsibility of the applicant /permitee that the use described on
the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as
listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may
necessitate removal of certain parts of the construction are at the applicant's /permittee's or property owner's expense.
At a minimum, the following inspections ARE REQUIRED by the Spokane Valley Municipal Code (SVMC):
FOOTING - when forms and reinforcements are in place and prior to placement of concrete -all structures, including manufactured
homes.
NOTE: This inspection includes review of the structures setback from property lines. Minimum setbacks are established by SVMC.
Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback
provisions lies solely with the permitee- neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure.
Failure to properly locate the structure may require its relocation at the owner's /permittee's expense.
FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING - after rough -in, before covering and final.
MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment and final.
FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and
prior to concealing.
FINAL - when complete and prior to occupancy and /or use; all permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the
approved site plan) required by ordinance or as a condition of approval of this permit. Items such as installation of fire hydrants,
fire department access, on -site drainage (208' swales), road improvements, parking and landscaping are common requirements of
a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES - final inspection required when complete, stairs, handrails, skirting, etc. installed and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover
RIGHT -OF- WAY /APPROACH - prior to placement of concrete / asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc.,
must be inspected prior to cover. Check with the Building department for special inspections in conjunction with commercial projects.
State law RCW 19.122 requires that prior to any excavation the `CALL BEFORE YOU DIG' center must be notified. Call 411 at least 3
working days in advance.
PERMIT EXPIRATION AND REFUNDS
Expirations:
Building or other permits (regulated under SVMC Chapter 24) shall expire by limitation and be declared void if a) work is not started
within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the
date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for
half the permit fee based on the value of the remainder of the work required to finish the original permit.
Right -of -way permits (regulated under SVMC Chapter 22) issued between April 1, and September 30, are valid for 30 days after the
date of issuance, with a one -time 30 -day extension available. Right -of -way permits issued between October 1, and March 31, shall be
valid until the following April 30.
Refunds:
All refund requests must be made in writing by the original permitee to the Building Official no later than 180 days after the date of fee
payment. Full refunds will be granted for any permit issued in error. Rate of refund shall be as set forth in the City of Spokane Valley
Master Fee Schedule in effect at the time of permit application. A copy of this schedule is available at Permit Center and also available
for reference on the city website at: http: / /www.spokanevalley.org and search for "fees"
Owner /Agent
Staff Approval
Date:
Date:
CITY OF Permit Center
po pkane
Valley® 11703 E Sprague Ave Suite B3 Spokane Valley WA 99206
509.720-5240• Fax: 509.688.0037•email: permitcenter @spokanevalley.org
ISite Information Project Information I
Site Address: 18319 E BALDWIN AVE Project Number: 11003087 Inv: 1 Issue Date: 10/14/2011
Permit Use:NEW SFR W/ATTACHED 3-CAR GARAGE
Parcel Number: 55074.2009
Subdivision: Applicant: SEATON,W J&G V
Block: Lot: 18405 E BALDWIN AVE
Zoning R-3 SF Res District GREENACRES,WA 99016- Phone: (509)928-0633
Contact: SEATON,W J&G V
Owner: SEATON,W J&G V 18405 E BALDWIN AVE
Address: 18405 E BALDWIN AVE GREENACRES,WA 99016- Phone: (509)928-0633
GREENACRES,WA 99016-
Setbacks-Front: Left: Right: Rear:
Building Inspector: EAST
Water Dist: CONSOLIDATED IRRG#1
Group Name:
Project Name:
Permits I
Building Permit Contractor: RAY HARTY CONSTRUCTION LLC License#: RAYHAHC930D6
1&2 FAMILY R-3 VB 2,384 RESIDENTIAL PERMIT FEE $1,889.75
COV DECK R-3 VB 276 WSBCC SURCHARGE $4.50
Total Area 3146 GAR WOOD U-1 VB 762 SF PLNS RVW<7999 SQ FT $755.90
Building Height 20
Stories 1 Total Value: $259,282.80 Total Permit Fee: $2,650.15
FOR BUILDING INSPECTIONS CALL(509)688-0054.
Pluntbntfr Permit Contractor: RAY HARTY CONSTRUCTION LLC License#: RAYHAHC930D6
TOILETS/BIDETS 3 $18.00 SINKS 5 $30.00
SHOWERS 2 $12.00 TUBS 1 $6.00
DISH WASHERS 1 $6.00 GARBAGE DISPOSAL 1 $6.00
CLOTHES WASHER 1 $6.00 FLOOR DRAINS 1 $6.00
ITotal Permit Fee: $90.00
FOR PLUMBING INSPECTIONS CALL(509)688-0054.
Payment Summary
Total Fees AmountPaid AmountOwing Tran Date Receipt# Payment Amt
$2,740.15 $2,740.15 $0.00 09/30/2011 28547 $755.90
10/14/2011 28726 $1,984.25
INotes/Conditions of Approval I
Engineering for Footing on rear Covered Patio required prior to framing.
Processed By: BONDURANT,MICK PERMIT
Printed By: MORRIS,HEATHER Page 1 of I
NOTICE 4
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the
property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permitee that the use described on
the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as
listed below and obtain the necessary approvals before progressing beyond the point where inspections are required and may
necessitate removal of certain parts of the construction are at the applicant's/permittee's or property owner's expense.
At a minimum,the following inspections ARE REQUIRED by the Spokane Valley Municipal Code(SVMC):
FOOTING - when forms and reinforcements are in place and prior to placement of concrete-all structures, including manufactured
homes.
NOTE: This inspection includes review of the structures setback from property lines. Minimum setbacks are established by SVMC.
Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback
provisions lies solely with the permitee-neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure.
Failure to properly locate the structure may require its relocation at the owner's/permittee's expense.
FOUNDATION -when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING-after rough-in, before covering and final.
MECHANICAL-rough-in of piping, before covering, metal chimneys before concealment and final.
FRAMING -after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and
prior to concealing.
FINAL-when complete and prior to occupancy and/or use; all permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the
approved site plan) required by ordinance or as a condition of approval of this permit. Items such as installation of fire hydrants,
fire department access, on-site drainage(208'swales), road improvements, parking and landscaping are common requirements of
a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES-final inspection required when complete, stairs, handrails, skirting, etc. installed and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS-prior to cover
RIGHT-OF-WAY/APPROACH-prior to placement of concrete/asphalt or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc.,
must be inspected prior to cover. Check with the Building department for special inspections in conjunction with commercial projects.
State law RCW 19.122 requires that prior to any excavation the `CALL BEFORE YOU DIG' center must be notified. Call 411 at least 3
working days in advance.
PERMIT EXPIRATION AND REFUNDS
Expirations:
Building or other permits (regulated under SVMC Chapter 24) shall expire by limitation and be declared void if a) work is not started
within 180 days of obtaining a permit, or b)work is abandoned for 180 days or more after beginning work, or c)after two years from the
date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for
half the permit fee based on the value of the remainder of the work required to finish the original permit.
Right-of-way permits (regulated under SVMC Chapter 22) issued between April 1, and September 30, are valid for 30 days after the
date of issuance, with a one-time 30-day extension available. Right-of-way permits issued between October 1,and March 31, shall be
valid until the following April 30.
Refunds:
All refund requests must be made in writing by the original permitee to the Building Official no later than 180 days after the date of fee
payment. Full refunds will be granted for any permit issued in error. Rate of refund shall be as set forth in the City of Spokane Valley
Master Fee Schedule in effect at the time of permit application. A copy of this schedule is available at Permit Center and also available
for reference on the city website at: http://www.spokanevalley.orq and search for"fees"
Owner/Agent Date:
Staff Approval Date:
Heather Morris
From: Ray Harty [rayharty @comcast.net]
Sent: Wednesday, October 26, 2011 9.14 PM
To: Permit Center
Subject: Seaton Permit
Attachments: Letter to Spokane Valley - Seaton.doc
Please find my attached formal request to be removed as contractor of record, 18319 E.
Baldwin, J. Seaton project.
Thank you,
Ray Harty
Ray Harty Construction, L.L.C.
509 - 927 -7460
rayhartyconstruction.com
rayharty(icomcast.net
rro_se,4_
400 -3o8 7
1005 South Center Drive
Spokane
Washington
99212
509- 927 -7460
ra,91-tart9@comcast.net
yhartyconstruction.com
October 26, 2011
To Whom It May Concern:
In regards to applicant project, Joe Seaton, 18319 E. Baldwin. Mr. Seaton has decided to
General Contract the project himself. We request to be removed as the contractor of
record, from the issued permit.
Please call me with any questions.
Regards,
Ray Harty