Loading...
2012, 06-25 Permit: SW-12001606 SewerSPOKANE COUNTY I3UILUING AND PLANNING PERMIT Application Number: SW- 12001606 Permit Issued Date: 06/25/2012 Expiration Date: Project Description: Project Name: Permit Type: SEWER CONNECTION SUTTERS PHASE 3 SEWER Primary Contact: COURCHAINE CONSTRUCTION Applicant: COURCHAINE CONSTRUCTION Address: Phone: Email: 19818 E SPRAGUE GREENACRES, WA 99016 509 - 928 -0846 SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: Zoning: 816 S BANNEN RD 45233.0727 TALLY HO SUBDIVISION VERA TALLY HO B148 L3B3 Water District: Vera Irrigation District #15 Owner: Address: Phone: Email: HOOB, HAROLD M 816 S BANNEN RD VERADALE, WA 99037 -9675 Fire District: Spokane Valley Fire Land Area: 0.2443 acres / 10640 sqft CONTRACTOR INFORMATION: General Contractor COURCC*181R7 COURCHAINE EXCAVATION 19818 E SPRAGUE GREENACRES, WA 99016 509 - 928 -0846 DETAILS: Class SEWER Type Quantity Unit Charge Value SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477 -3604 FROM 8:30 -5:00 MONDAY - FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30- MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. Date Printed: 06/25/2012 12:05:08 Printed by: IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY 13UILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW- 12001606 06/25/2012 Expiration Date: SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 06/25/2012 12:05:08 Printed by: IIS APPPOOL\ASP.NET v4.0