Loading...
1991, 01-22 Permit App: 91000202 ResidenceSPOKANE COUNTY DEPARTMENT OF BUILDINGS W. 1303 BROADWAY AVENUE SPOKANE, WASHINGTON 99260 (509) 456-3675 I certify that I have examined this permit /application, state that the information contained in it and submitted by me or my agent to compile said permit /application is true and correct, and authorize Spokane County to proceed with processing. In addition, I have read and understand the INSPECTION REQUIREMENTS /NOTICE provisions included herein and agree to comply with same. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. I understand that the issuance of this permit /application and any subsequent inspection approvals or Certificates of Occupancy shall not be construed to give authority to violate or cancel the provisions of any state or local law regulating construction, or as a warranty of conformance with the provisions of any state or local laws regulating construction. SIGNATURE OF APPLICATION OWNER OR AGENT DATE PROJECT NUMBER= 91000202 00x02 DATE= 01/22/91 PAGF:::: 01 APPLICATION x•3i•3Eit* F:u3 •}t•yE 4k' fit•# • ;ii• tk• #***N:ri?i•** APPLICATION * x• • ** •**** •• * **#•x • •*** ****** SITE STREET -: 2726 S1. . {ANNEN CT PARCEL.t =: 26543._•0932PTN ADDRESS= SPOKANE WA 99206 PERMIT USE RESIDENCE - NWE::Cr PL..AT4::= 004485 PLAT NAME == EVERGREEN POINT 4TH ADD BLOCK= 13 LOT= i ZONE =:: IF. 3.5 D1:ST4= F AREA =:: FiA =:: F WIDTH =:: 99 DEPTH= 137 R. /W=: 50 .';OE BLDG'S= : DWELLINGS= i OWNER= W R S Y� ASSOCIATES INC: PHONE= 509 922 0782 STREET= 1'' 0 BOX 14084 ADDRESS =. SPOKANE WA 99214 CONTACT NAME= BIL_. SMITH PHONE NUMBER= 509 922 0782 BUILDING SETBACKS: FRONT == 30 LEFT= 20 RIGHT -: 10 REAR.: 42 •>': ***•3t**3i**3i **3:,* * ** * **3k *air3ix** REVIEW INFORMATION 3i•3E3i3i3G **r *3k*3k** ***• ** ** *3e3i•3i•3?- DEPARTMENT REVIEW COMMENTS APPROVAL COMMENTS BUILDING PLAN REVIEW REQUIRED Jr ,w BUILDING SETBACK. REVIEW REQUIRED !.PA t Ate * BUILDING ENERGY PLAN REVIEW REQUIRED Z .....`L....l .. ...� l• / ._ ENGINEER APPROACH/FLOOD 1-'LAIN!DRAINAGE. -•• 1 :V5 e$ 3e• 3e• 3< 3i• 3k* ** 3i• 3k3►• 3i•** 3i3t• #3i31••3i•3i3t *3i• **3;•3t•*3c•* BUILDING PERMIT **3f•* *3k* 3i•* ** ***•33•x•3 #3e3i•***3. /4/..,.V CONTRACTOR= W R S & ASSOCIATES STREET= F' 0 BOX 14084 ADDRESS= SPOKANE WA 9921 4 PHONE= 509 922 0782 NEW= X REMODEL= ADDITION == CHANGE OF USE= DWELL UNITS == 1 OCCUP. LD= BLDG HGT= STORIES: BLDG W X. •D =_ X SQ FT= 1746 SPRINKLER= N REn PARKING:::: :HANDICAP= CRITICAL MAT= N DESCRIPTION GROUP TYPE SQ! FT VALUATION BASEMENT F R-3 VN 890 9790.00 BASEMENT U R -3 VN 638 7542.00 GARAGE M-1 vN 695 4865.00 RESIDENCE R -3 VN 1 748 7691 2.00 ]:TEES DESCRIPTION QUANTITY FEE: AMOUNT RESIDENTIAL VALUATION Y 639.50 STATE SURCHARGE Y 4.50 COUNTY SURCHARGE:: Y 102,32 3i**3R3F?tk}i•3t•3c3Pik. k3t• 3b# 3 (3r3k3F3i3i•3i•3t•3t•#k36•M•3s° MECHANICAL PERMIT #34)f#3i•3t•***3t•***** ****M•• 3E *fit•** CONTRACTOR= ALLIED HEATING INC PHONE= 509 926 8252 STREET= 9311 E TRENT AVE ADDRESS= SPOKANE WA 99206 ITEM DESCRIPTION QUANTITY FEE AMOUNT DUCTWORK SYSTEM i 10. aid GAS PIPING AIR CONDITIONER 0-3 TONS 1 12.00 GAS LOG 1 10.00 63 {3t**it.R***,) 3{* 3+ i3i3ti3i•3(3, }3k3e3i•3iX3k•k3':• F LHMBING PERMIT 3i••)t•kF3E *_ *•**3i'3r. *3333*•**•* **3r3k3i3i*3 ** CONTRACTOR -: TOWN & COUNTRY PLUMBING STREET == RT 1 BOX 129 A ADDRESS= ELK WA 99009 PHONE= 509 292 830 2 50 °v 5 P 'Z12f/9/ NOTICE It is the responsibility of the permittee, not Spokane County, to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested. Failure to request required inspections and obtain the necessary approvals prior to progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the owner's /permittee's expense. At a minimum, the following inspections ARE REQUIRED by County Code: 1. FOOTING — when forms and reinforcement are in place and prior to placement of concrete. NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from the property line or the center line of the roadway right -of -way, whichever provides the greater setback from the center line of the roadway right -of -way. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of right -of -way between your property and the actual improved street /curb. The responsibility to comply with applicable setback provisions lies solely with the permittee — neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's / permittee's expense. 2. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. (Blocking for a manufactured home is required to be inspected prior to the installation of skirting.) 3. FRAMING — after all framing, bracing and blocking is in place, and prior to concealing. 4. INSULATION — prior to the installation of drywall. 5. PLUMBING — after rough -in, before covering, and final. 6. MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL — when complete and prior to occupancy and /or use. Please provide 24 hours notice. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on -site drainage ( "208 swales "), road improvements, parking, and landscaping are common requirements of a permit /site plan which must be completed prior to final approval of a building or issurance of a Certificate of Occupancy. In addition to the above any plumbing or mechanical systems or materials which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for "special inspections" in conjunction with commercial projects. CALL 456 -3675 FOR INSPECTIONS. TO INSURE PROMPT SERVICE, PLEASE GIVE 24 HOUR NOTICE. YOUR INSPECTOR IS UNDER CERTAIN CIRCUMSTANCES, PARTS OF YOUR PROJECT MAY REQUIRE INSPECTIONS FROM OTHER AGENCIES: • road cuts for utilities or drives, State or County Engineer's Office 456 -3600 • on -site waste disposal system, Environmental Health District 456 -6040 • construction in a flood plain, County Engineer's Office 456 -3600 • electrical wiring, State Department of Labor and Industries 456 -2792 • sewer connection, County or City Utilities Department 456 -3604 EXPIRATION Unless otherwise noted, this permit will be considered null and void by limitation of the work authorized by the permit is not commenced or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year of the date of expiration for one -half the original fee, subject to certain limitations — please call us if you have any questions. MISTAKES? If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Department of Buildings at the address found on the face of this permit. NO. 90 0813 $EFORE THE BOARD OF COUNTY COMMISSIONERS FOR SPOKANE IN THE MATTER OF FILING THE PLAT OF ) EVERGREEN POINT FOURTH FILE PE-1469-84 AC I CHANGE FROM ) AGRICULTURAL A) TO SINGLE FAM�Y ) RESOLUTION RESIDENTIAL (R- 1 ) FILE NO. 7:E-81-84 IN ) SECTION 26 TOWNSHIP Ow� RANGE ) 44 EWM, SPOKANE COUNTY, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF SPOKANE TY WASHINGTON, that the Final Plat of Evergreen Point Fourth Addition COUN , of Tracts 224, 225, 226 & 227 of Vera located in h e S , /4 of Sec asnf26ows, those portions o e 44 E.W.M., Spokane County, Township 25 North, Range lat dedication: with a more precise description located in the P er plat thereof recorded in Volume "O" Portions of Tracts described as f follows: of VERA, as P P of Plats, page 30, Block 2 of EVERGREEN page Volume 18 of Plats, said BEGINNING at the Southeast re f record d in 5, line POINT, as per plat '00" East along the Easterly beginning; thence North 00 43 the true point of' 33; 49.75 feet to said Easterly line a plat a distance of North 00'43' 00 East along Block thence continuing the Northeast corner distance t of / 187.50 distance of 525.00 feet to thence 1 of said plat; thence South 89'17'00" East thence South thence South 00°43'00" West a distance an o feet; 21.54 feet; ° 47' 00" feet; the a distance South 89'17'00" East thence South 58°47'00" West a 06'29'04" West a distance of 134' thence 31 °13'00" distance of 60.00 feet; ,06,E West a distance of East a thence South 05°36'06" 297.3 feet; et 5then feet; thence North 89'17'00" West a distance of 305.00 feet to feet; oint of beginning; to the true p ton. Situate in the County of Spokane, State of Washing RECOMMENDATION of the Spokane County Planning Department, the final plat is UPON THE RECOMME public rights of way dedicated in this plat will not be approved with the excption that the e Puntil the County Engineer has certified that the roads have been for maintenance County tandards and approved by a separate resolution of the Board of County been improved Commissioners. LY until the final plat document is filed in thSpokane Co my Auditor's Office, ADDITIONAL preliminary plat status and is subject expiration nu and void this subdivision has only p ted an extension of time consistent with the policies status if not periodically g� ^ � of the Planning Department. PASSED BY THE BOARD THIS DAY BOA OF SPO OF , 1990 OF C UN COMMISSIONERS NE COUNTY, WASHINGTON Patricia A. y, Chairman .17 oe' hn R. McBri �IAM E. DON • ATTEST: of the Board / ../ Bv: • osanne Montague, Deput erk REV 1/90 mo 1 r°L [7/ /i/ /e.; Ln7" 1 Lock I2 Evr,eLLEF POfer 474,1 4'rPfAJ From The Desk Of JEFF FORRY -Th : PE�w, tT 1 SStA,c pN ZovrNCB "Pt.-h.-r AS OP J L.L`,A 3, 144o wtA P) gtL O CSFfa) Awco la3 4\12 Sc.k q,►U -r —co v'► N p ► Net S PNO ORoee �oQ Sc.,g- O i v ►94oN RE r-cruc,rl)c, ALL RCKS Core_ STTZtn�Tov2ES ST YVI E� SF 12 0 tJ . re)PcC S -?(12-0‘) °CC O r` � `rE ?(-,.►4YV W ERC F(zOPo SE O ?ma c., Calu1 cTa2 BA Q OA) T 3 tNV-014114n , v rgin/ O ' JFo. i�' R O V t C - c Zy -THS Vt e 11?-7 Vt E vL T.