Loading...
2012, 04-27 Permit: SW-12001234 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001234 Permit Issued Date: 04/27/2012 Expiration Date: Project Description: Permit Type: SEWER CONNECTION SEWER Primary Contact: ACME EXCAVATING Applicant: ACME EXCAVATING Address: 6808 S LINKE RD GREENACRES, WA 99016 Phone: 509-251-8058 Email: SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description Inspection Area: Zoning: 321 N BANNEN RD 45143.9067 14 25 44 BEG 905.55FT E & 1126 25FT N OF SWCOR OF SW1/4 OF SW1/4 TH W150FT TH N128.75FT TH E 150FT TH S TO POB Owner: Address: Phone: Email: WILKE, GEORGE 321 N BANNEN RD SPOKANE, WA 99216-2095 509-926-5938 Water District: Vera Fire District: Fire District 1 Irrigation District #15 Land Area: 0.45 acres / 19602 sqft CONTRACTOR INFORMATION: General Contractor ACMEEES963LD ACME EXCVT & SEWER BORING CO 6808 S LINKE RD GREENACRES, WA 99016 509-228-0691 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125 00 $125 00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 04/27/2012 09:16:35 Printed by. 115 APPPOOLWSP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001234 04/27/2012 Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 04/27/2012 09.16 35 Printed by. 115 APPPOOLVASP.NET v4 0