2012, 12-18 Permit: SW-12002614 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002614
Permit Issued Date: 12/18/2012
Expiration Date: 12/19/2012
Project Description:
Project Name.
Primary Contact:
Phone:
SEWER CONNECTION
SO. GREENACRES PH II
MUELLER EXCAVATING
509-326-1016
Applicant MUELLER EXCAVATING
Address:
Phone:
Email:
3743 W OLYMPIC AVE
SPOKANE, WA 99205
509-326-1016
SITE INFORMATION:
Site Address:
Parcel Number:
2108 N BARKER RD
55083.9050
Assessors Description: 08-25-45 PTN OF GOV LT 5 OF SW1/4 DAF; BEG
1709' N & 30' E OF SW COR OF SEC TH E200' TH
N100' TH W200' TH S100' TO POB; EXC BEG AT
INTERSECTION OF N LN OF SD PROPERTY AND
E R/W LN OF BARKER RD; THE SL
Inspection Area: : (509)-477-3675
Zoning:
Owner:
Address:
Phone:
Email:
Water District: Consolidated Irrigation
District #19
MILLER, MARK J
2108 N BARKER RD
GREENACRES, WA 99016
Fire District. Spokane Valley Fire
Land Area: 21150 Square Feet
CONTRACTOR INFORMATION
MUELLE`181KK, Exp. 03/01/2014
MUELLER EXCAVATING
3743 W OLYMPIC AVE
SPOKANE, WA 99205
509-326-1016
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$25.94
$125.00
$150.94
1 $125.00 $125.00
$125.00
CONDITIONS.
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed' 12/18/2012 07.37.59 Project Coordinator. Kathy Cummings
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002614 Permit Issued Date: 12/18/2012
Expiration Date: 12/19/2012
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 12/18/2012 07:37:59 Project Coordinator: Kathy Cummings