2013, 11-06 Permit App: APR-2013-0068 ApproachSpokane
#Valley -
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
permitcenter(alsookanevaIlev.orq
(Staff Use/WIL�(O�nly)
PERMIT NUMBER: �I 5767
67
PERMIT FEE:
APPROACH PERMIT APPLICATION
PROJECT ADDRESS:
/0s/ ,�-. 6, /Fig e r 45/ ), /3/ I
3 ANTICIPATED COMPLE ION DATE: -
START DATE: // - ( / / ( '
BUILDING OWNER NAME:
i ex/v l',',eK4y
MAILING ADDRESS: /OS/G /re.0 C%
CITY: gra y STATE:
CONTACT PERSON NAME: / L i'/C e
PHONE:
CONTRACTOR NAME:
ZIP:
FAX: CELL: % ? ' - 72/5
MAILING ADDRESS: SSL S' /✓ - 1 pr .i77/c a G/
CITY: 0 /fr a2e1s/N A STATE: w,41
ZIP:
PHONE: ?0_6, —,50/1
FAX: CELL: ( ?S - -72 if
CONTRACTOR LICENSE NO.:Kfjpy S< ✓s a1 -res EXPIRES: 7 - /S- / tj' CITY BUSINESS LICENSE NO.:
PROJECT DESCRIPTION (Please Provide Site Sketch)
X Residential Driveway ® Commercial/Industrial Driveway
Existing Curb & Gutter
® Culvert Installation
Q Other Conditions:
® Rural Road Section
0 Sidewalk Repair/Construction
Bond/Insurance certification must be on file with the City.
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory Is the property
owner or has permission to represent the property owner In this transaction. 4) All construction is to be done In full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit Is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
Information may be required to be submitted and subsequently approved before this application can be processed.
Signature
Date: //- 6 - / 3
Project #_ c7140`3—
RECEIVED
NUV - 5 2013
CSV PERMIT CENTER
SUB# ,=
Updated 1-11-11 Page 1 of 1
http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Approach_Permit_1-11-11.doc
APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION (Revised 1/25/10)
Provide required measurements (in sketch boxes), and include street name.
Check all existing conditions that apply:
❑ Sidewalk
ft wide
_ ft from back of curb
❑ Streetside Swale
❑ Drainage Ditch
❑ Drywell (show location on sketch)
❑ , Other (please describe below)
\Vej�''
V � �1
ai
DISTANCE FROM
NEAREST PROPERTY LINE
7LEFT OR RIGHT SIDE)
5,7 (SEE TABLE)
CONCRETE
APPROACH
CURB
RETURN
CURB
7i
CCI
:Ts;
n:
ai
EDGE OF
ASPHALT
1-41-4—THROAT WIDTH O FT ---i--4'1
\IF CORNER LOT,
DISTANCE FROM
CURB RETURN
In FT (SEE TABLE)
WING (SEE TABLE) WINO
STREET MME
AC 0+7
STREET WITH CURB
DISTANCE FROM
NEAREST PROPERTY LINE
4AAY BE LEFT OR RIG. ' IDE)
SFT
15' RADIUS
- ROAT WIDTH nIFT-1
(SEE TABLE)
TREET NAME
STREET WITH ASPHALT EDGE
RADIUS
RETURN
\IF CORNER LOT,
DISTANCE FROM
RADIUS RETURN
Q FT (SEE TABLE)
Approach Requirements:
• Maximum 2 approaches per property frontage; one on arterials.
• Total width of approaches not to exceed 50% of frontage width.
Resident' pr\es
Commercial Approaches
Distance from Curb/Radius Return
15' minimum
\
75' minimum
Separation between Approaches (measured
from centerline to centerline of each
approach)
None specified
See Page 7-27
in City Street Standards
Throat Width (flat portion)
16' mina 30' max.
I
30' min., 40' max.
Wing Width (at curb line)
I
4 feet typical
!
4 feet typical
Minimum Distance from Side Property Line
(@ r/w)
1
\
5.0'
/
5.0'
Minimum Distance from Crosswalk
\
5' /
5'
Spokane
_Valley
Development Engineering
11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206
509.921.1000 • Fax: 509.921.1008 ♦ cityhaftspokanevalley.org
Approach Permit Application Review
TO: Building Department
Site Address: 10516 E Balfour Court
Project No: APR -2013-0068
Reviewed By: //
"( e
Date: % %767/3
Accepted
Not Accepted
Approach
X
Building Location
Paved Access
Notes:
1. Approach to be constructed pursuant to City of Spokane Valley Street
Standards, Standard Plan R-112.
2. Saw cutting of existing curb to create an approach is not allowed within
the City's jurisdiction.
3. Approach is to be inspected by the City's ROW Inspector prior to concrete
placement.
Reviewed By: //
"( e
Date: % %767/3
GENERAL NOTES
r
§
\
[
w
70
0
\
\
ce1—t
�
SECTION A -A