Loading...
2014, 04-23 Permit: SW-14000456 SewerSPOKANE COUNTY UTIL PERMIT Application Number: SW -14000456 TIEsject # 2-0(t-fr— 0701(a RECEIVED 0, Permf£Iskte DaZOL23/2014 Project Description: Project Name: Primary Contact: Phone: SEWER CONNTECTIN CENTENIAL PLACE MARKHAM HOMES INC 509-927-1437 CetraPERMIT CENTER SUB #I LJ REV. # Applicant: MARKHAM HOMES INC Address: Phone: Email: PO BOX 14130 SPOKANE VALLEY, WA 99214 509-927-1437 info@markhamhomesinc.com SITE INFORMATION: Site Address: Parcel Number: Assessor's Description Inspection Area: Zoning: 16927 E BALDWIN AVE 45124.0507 CENTENNIAL PLACE PHASE 1 (AFN# 6254933) :(509)-477-3675 LT 7 BLK 2 Owner: Ad dress: Phone: Email: Water District: Consolidated Irrigation District #19 LGIE LLC 504 E FAIRHAVEN AVE BURLINGTON, WA 98233 Fire District: Spokane Valley Fire Land Area: 6001 Square Feet CONTRACTOR INFORMATION• MARKHH1971DK, Exp. 03/12/2015 MARKHAM HOMES INC PO BOX 14130 SPOKANE VALLEY, WA 99214 509-927-1437 info@maddiamhomesinc.com PETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FFE DETAIL: Processing - Utilities Utilities Permit Total Fee: $26.64 $125.00 $151.64 1 5125.00 $125.00 $125.00 CONDITIONS' Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. Date Printed: 04/23/2014 07:41:22 Project Coordinator: Dawn Domeier