2014, 01-28 Permit: SW-14000040 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -14000040
Permit Issued Date: 01/28/2014
Expiration Date: 01/28/2015
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
SOUTH GREEN ACRES 2B
BOUCHER CONSTRUCTION LLC
509-953-3274
Applicant: BOUCHER CONSTRUCTION LLC
Address:
Phone:
Email: russboucher@comcast.net
10 N HARMONY RD
GREENACRES, WA 99016
509-953-3274
SITE INFORMATION•
Site Address:
Parcel Number:
Assessor's Description
Inspection Area:
Zoning:
1216 N BARKER RD
55172.0114
CORBIN ADD TO GRNACRS: PTN OF N1/2 L12
B1 EXC S15 FT MEAS AT R ANGLES TO S LN OF
LOT; EXC W 100FT OF S SOFT THEREOF
:(509)-477-3675
Owner:
Address:
Phone:
Email:
Water District: Consolidated Irrigation
District #19
GAYLORD JR, FRANK L & DELLA P
5708 N FOREST BLVD
SPOKANE, WA 99205-7523
Fire District: Spokane Valley Fire
Land Area: 14759 Square Feet
CONTRACTOR INFORMATION:
BOUCHC*954P5, Exp. 10/25/2015
BOUCHER CONSTRUCTION LLC
10 N HARMONY RD GREENACRES, WA 99016
509-953-3274
russboucher@comcast.net
DETAILS:
Class
SEWER
Type
Quantity Unit Charge Value
FEE DETAIL:
Processing - Utilities
Utilities Permit
SEWER CONNECTION
Total Fee:
526.64
$125.00
$151.64
1 $125.00 $125.00
5125.00
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
Date Printed: 01/28/2014 13:57:33 Project Coordinator: Dawn Dompier
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -14000040 Permit Issued Date: 01/28/2014
Expiration Date: 01/28/2015
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 01/28/2014 13:57:33
Project Coordinator: Dawn Dompier