2012, 06-01 Permit: SW-12001469 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
r.
Application Number: SW -12001469
Permit Issued Date:
06/01/2012
Expiration Date:
Project Description: SEWER CONNECTION
Project Name: CORBIN
Permit Type: SEWER
Primary Contact: ACME EXCAVATING
Applicant: ACME EXCAVATING
Address: 6808 S LINKE RD
GREENACRES, WA 99016
Phone: 509-251-8058
Email:
SITE INFORMATION:
Site Address
Parcel Number:
Subdivision:
Assessor's Description
Inspection Area:
Zoning:
7 S BARKER RD
55202.0301
DOAK'S GREEN -ACRES
SUBDIVISION
CORBIN GRNACRS DOAKS L1 B1
Water District:
Consolidated Irrigation
District #19
Owner: COTE, KATHRYN
Address: 7 S BARKER RD
GREENACRES, WA 99016-7708
Phone:
Email:
Fire District: Fire District 1
Land Area: 0.441 acres / 19208 soft
CONTRACTOR INFORMATION:
General Contractor
ACMEEES963LD
ACME EXCVT & SEWER BORING CO
6808 S LINKE RD
GREENACRES, WA 99016
509-228-0691
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 5125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
5125.00
$150.94
CONDITIONS:
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 06/01/2012 10:59:53
Printed by. 118 APPPOOLASP.N ET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001469 Permit Issued Date:
� 06/01/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed 06/01/2012 1059 53
Printed by. IIS APPPOOL\ASP NET v4 0