Loading...
2012, 06-01 Permit: SW-12001469 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT r. Application Number: SW -12001469 Permit Issued Date: 06/01/2012 Expiration Date: Project Description: SEWER CONNECTION Project Name: CORBIN Permit Type: SEWER Primary Contact: ACME EXCAVATING Applicant: ACME EXCAVATING Address: 6808 S LINKE RD GREENACRES, WA 99016 Phone: 509-251-8058 Email: SITE INFORMATION: Site Address Parcel Number: Subdivision: Assessor's Description Inspection Area: Zoning: 7 S BARKER RD 55202.0301 DOAK'S GREEN -ACRES SUBDIVISION CORBIN GRNACRS DOAKS L1 B1 Water District: Consolidated Irrigation District #19 Owner: COTE, KATHRYN Address: 7 S BARKER RD GREENACRES, WA 99016-7708 Phone: Email: Fire District: Fire District 1 Land Area: 0.441 acres / 19208 soft CONTRACTOR INFORMATION: General Contractor ACMEEES963LD ACME EXCVT & SEWER BORING CO 6808 S LINKE RD GREENACRES, WA 99016 509-228-0691 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 5125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 5125.00 $150.94 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 06/01/2012 10:59:53 Printed by. 118 APPPOOLASP.N ET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001469 Permit Issued Date: � 06/01/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed 06/01/2012 1059 53 Printed by. IIS APPPOOL\ASP NET v4 0