Loading...
2012, 07-24 Permit: SW-12001812 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001812 Permit Issued Date: 07/24/2012 Expiration Date: Project Name: Permit Type: MICA VIEW SEWER Primary Contact Applicant: Address: Phone: Email: ACME EXCAVATING ACME EXCAVATING 6808 S LINKE RD GREENACRES, WA 99016 509-251-8058 SITE INFORMATION• Site Address: Parcel Number: Subdivision: Assessor's Description Inspection Area: Zoning: 211 S BARKER RD 55202.0307 DOAK'S GREEN -ACRES SUBDIVISION CORBIN GRNACRS DOAKS S37FT L7;ALL L8 B1 Water District: Consolidated Irrigation District #19 Owner: Address: Phone: BLEKEN, VIRGIL L PO BOX 607 GREENACRES, WA 99016 Email: Fire District: Spokane Valley Fire Land Area: 26460 Square Feet CONTRACTOR INFORMATION: General Contractor ACMEE**982LD ACME EXCAVATING 6808 S LINKE RD GREENACRES, WA 99016 509-251-8058 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 07/24/2012 14:35:49 Printed by: 118 APPPOOL\ASP.NET v4 0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001812 07/24/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 07/24/2012 14 35:49 Printed by: 115 APPPOOL\ASP NET v4 0