2012, 12-04 Permit: SW-12002594 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002594
Permit Issued Date:
12/04/2012
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: ZANDT, MICHAEL G & TRACY L
Project Name: MICAVIEW Applicant: ZANDT, MICHAEL G & TRACY L
Permit Type: SEWER Address: 314 S BARKER RD
GREENACRES, WA 99016-9705
Phone:
Email:
SITE INFORMATION:
Site Address: 314 S BARKER RD
Parcel Number: 55191.2005
Subdivision. SEIPP'S ADDITION
Assessor's Description SEIPPS ADDITION LT 5 & N 9FT OF LTS 6, 7 & 8
BLK 2
Inspection Area:
Water District:
Consolidated Irrigation
District #19
Owner:
Address:
Phone
Email.
ZANDT, MICHAEL G & TRACY L
314 S BARKER RD
GREENACRES, WA 99016-9705
Fire District: Spokane Valley Fire
Zoning Land Area 35726 Square Feet
CONTRACTOR INFORMATION:
General Contractor
ZANDTIL971 JW
ZANDTCO IRRIGATION/LANDSCAPE INC
314 S BARKER RD
GREENACRES, WA 99016
509-216-6230
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER
SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 12/04/2012 14.35 52
Printed by 115 APPPOOL\SmartGovProdApp
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12002594 12/04/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5'00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Pnnted: 12/04/2012 14 35:52 Printed by: IIS APPPOOL\SmartGovProdApp