Loading...
2012, 10-10 Permit: SW-12002367 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12002367 Permit Issued Date: 10/10/2012 Expiration Date: Project Description: SEWER CONNECTION Project Name' MICAVIEW PH 1 Permit Type: SEWER Primary Contact: H & S CONSTRUCTION Applicant' H & S CONSTRUCTION Address. 11817 E VALLEYWAY SPOKANE VALLEY, WA 99206 Phone. 509-926-8964 Email: SITE INFORMATION: Site Address: Parcel Number: Subdivision. Assessor's Description Inspection Area. 610 S BARKER RD 55191.0630 CORBIN ADDITION CORBIN ADD TO GREENACRES S100FT OF N200FT OF L16 B28 Water District: Consolidated Irrigation District #19 Zoning. Land Area: 31900 Square Feet Owner: Address: Phone: Email: KUJALA, J L PO BOX 283 GREENACRES, WA 99016-0283 Fire District: Spokane Valley Fire CONTRACTOR INFORMATION: General Contractor HSCON"123KF H & S CONSTRUCTION 11817 E VALLEYWAY SPOKANE VALLEY, WA 99206 509-926-8964 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL: Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8.30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed 10/10/2012 10.56'21 Printed by: IIS APPPOOL1ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12002367 10/10/2012 Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 10/10/2012 10:56.21 Pnnted by: IIS APPPOOLWSP.NET v4.0